Difference between revisions of "Wkmet"

From IARC 207 Wiki
Jump to navigation Jump to search
imported>Ken
 
imported>Ken
Line 3: Line 3:
 
{{todo}}
 
{{todo}}
  
* take replacement screed stake (4 feet long?) to site, replace one with driving head attached; remove/recover driving head
+
* take replacement screed stake (4 feet long?) to site
 
+
* replace SE anchor with driving head attached; remove/recover driving head
 
* take 2-1/2 unistrut & bolts (see below) for 3rd ''fencer'' stand leg
 
* take 2-1/2 unistrut & bolts (see below) for 3rd ''fencer'' stand leg
  

Revision as of 10:53, 3 July 2007

West Kuparuk met

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed
  • take replacement screed stake (4 feet long?) to site
  • replace SE anchor with driving head attached; remove/recover driving head
  • take 2-1/2 unistrut & bolts (see below) for 3rd fencer stand leg

site logs

12 June 2007, Ken I., Doug K.

  • installed electric fence with 6 posts, one wire at about 3-1/2 feet height
  • tried to drive main tower anchors, but drove driving head onto SE screed stake to stay...
  • fence charger cranepod has only 2 unistrut legs; 3rd leg is copper ground rod hose-clamped to hinge hasp;
    • TAKE 2-1/2-foot U-strut & 1 inch 1/4 or 5/16- inch bolts to replace leg
  • lost new age pliers somewhere near site