Difference between revisions of "2017 NGEE Nome October trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 1: Line 1:
  
 
===Activities:===
 
===Activities:===
 +
 
* teller top:
 
* teller top:
 
** double-check data
 
** double-check data
 
** thermal conductivity probes working?
 
** thermal conductivity probes working?
 
** maybe replace cnr4
 
** maybe replace cnr4
 +
*** and or drill out stripped screws
 
* teller bottom
 
* teller bottom
 
** sr50a transducer replacement, 2x
 
** sr50a transducer replacement, 2x

Revision as of 13:31, 13 September 2017

Activities:

  • teller top:
    • double-check data
    • thermal conductivity probes working?
    • maybe replace cnr4
      • and or drill out stripped screws
  • teller bottom
    • sr50a transducer replacement, 2x
    • remove 1 PT
    • discharge measurement
  • Kougarok m64
    • bring guy wire markers for K64 met station (at uaf storage)

Loose Itinerary

  • 9/29 (8:18 - 9:36 Twilight to twilight)
    • evening: arrive & stay in apartments
  • 9/30 (8:21 - 9:19)
    • take some storage stuff to dump
    • evening: Lily arrives
    • stay in hotel
  • 10/1 (8:24 - 9:16)
  • Teller
    • walk the end point of the lines set up in March 2017 and remove the orange poles
    • place 4 poles at bottom to help outline location of channel for PTs
  • 10/2 (8:27 - 9:12)
    • Teller button up for winter, snow pole remainder
    • remove one PT at the bottom site
  • 10/3 (8:30 - 9:09)
    • drive to kougarok. download data over radios from K sites
    • stretch goal... visit k2 if time for thaw depth measurements
  • 10/4 (8:33 - 9:05)
    • kougarok m64 winter button up
    •  ??? soil pit ???
    • kougarok m64 finish surveying & deploy snow poles
  • 10/5 (8:36 - 9:02)
  • Council
    • survey 2017 plots?
    • download data
    • visit C2?
  • 10/6 depart