Difference between revisions of "2017 NGEE Nome October trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 3: Line 3:
  
 
===Activities:===
 
===Activities:===
 
+
* teller
 +
** move snow poles to TLA line
 +
** put one snow pole in each actual snow course center of X for the IS crosses.
 +
** dig out metal tags
 
* teller top:
 
* teller top:
 
** double-check data
 
** double-check data

Revision as of 11:28, 25 September 2017

  • Car Rental Reservation: R41747
    • 9/29 - 10/6

Activities:

  • teller
    • move snow poles to TLA line
    • put one snow pole in each actual snow course center of X for the IS crosses.
    • dig out metal tags
  • teller top:
    • double-check data
    • thermal conductivity probes working?
    • maybe replace cnr4
      • and or drill out stripped screws
  • teller bottom
    • sr50a transducer replacement, 2x
    • remove 1 PT
    • discharge measurement
  • Kougarok m64
    • bring guy wire markers for K64 met station (at uaf storage)
    • setup snow grid for spring (surveying)
    • soil pit.............
  • Council
    • fix program at C1 Grid

Loose Itinerary

  • 9/29 (8:18 - 9:36 Twilight to twilight)
    • evening: arrive & stay in apartments
  • 9/30 (8:21 - 9:19)
    • take some storage stuff to dump
    • evening: Lily arrives
    • stay in hotel
  • 10/1 (8:24 - 9:16)
  • Teller
    • walk the end point of the lines set up in March 2017 and remove the orange poles
    • place 4 poles at bottom to help outline location of channel for PTs
  • 10/2 (8:27 - 9:12)
    • Teller Top:
      • change desiccant which will require:
        • drill
        • drill bit
        • tap & die
        • replacement machine screws for stripped out ones.
    • Teller button up for winter, snow pole remainder
    • remove one PT at the bottom site
  • 10/3 (8:30 - 9:09)
    • drive to kougarok. download data over radios from K sites
    • stretch goal... visit k2 if time for thaw depth measurements
  • 10/4 (8:33 - 9:05)
    • kougarok m64 winter button up
    •  ??? soil pit ???
    • kougarok m64 finish surveying & deploy snow poles
  • 10/5 (8:36 - 9:02)
  • Council
    • survey 2017 plots?
    • download data over radio for C2 (at minimum)
    • visit C2?
    • fix program at C1
  • 10/6 depart