Line 12: Line 12:
 
** put one snow pole in each actual snow course center of X for the IS crosses.
 
** put one snow pole in each actual snow course center of X for the IS crosses.
 
** remove remaining poles
 
** remove remaining poles
 +
 
* teller bottom:
 
* teller bottom:
 
** check soil moisture #5 (bottom) seems to be not powered / connected.
 
** check soil moisture #5 (bottom) seems to be not powered / connected.
 +
** check heat flux plates
 +
** change sr50A transducers
 +
** download data
 +
*** need sc32b for CR10X at teller SW
 +
* replace memory card in camera
 +
** sr50a transducer replacement, 2x
 +
** remove 1 PT
 +
** discharge measurement
 +
* add air temperature thermistor
 +
* add a resistor to thermistor multiplexer to confirm that everything is working well.
 +
 +
* Tools required for Teller Tasks
 +
** small campbell screwdriver flat for Teller SW transducer removal
 +
** small campbell screwdriver phillips for SR50A replacement
 +
** 7/16" nut driver for radiation shield
 +
** cable ties for new air temperature
 +
** new program for teller bottom
 +
** new program for teller top
 +
** winter program for teller sw?
 +
 
* teller top:
 
* teller top:
 
** double-check data
 
** double-check data
Line 20: Line 41:
 
*** and or drill out stripped screws
 
*** and or drill out stripped screws
 
* replace memory card in camera
 
* replace memory card in camera
* teller bottom
 
* replace memory card in camera
 
** sr50a transducer replacement, 2x
 
** remove 1 PT
 
** discharge measurement
 
**
 
 
* Kougarok m64
 
* Kougarok m64
 
** bring guy wire markers for K64 met station (at uaf storage)
 
** bring guy wire markers for K64 met station (at uaf storage)
Line 48: Line 63:
 
* Double-check thermistor equations
 
* Double-check thermistor equations
 
* double-check precision resistor values.
 
* double-check precision resistor values.
* think about bringing car adapter plus aligator clips etc out so we can tie into station batteries during program compilation.
 
  
 
Teller Bottom Soil:
 
Teller Bottom Soil:
Line 133: Line 147:
 
** kougarok m64 winter button up
 
** kougarok m64 winter button up
 
** ??? soil pit ???
 
** ??? soil pit ???
 +
** wonder if the heat flux plates were left in Fairbanks...
 
** kougarok m64 finish surveying & deploy snow poles
 
** kougarok m64 finish surveying & deploy snow poles
 
* 10/5 (8:36 - 9:02)
 
* 10/5 (8:36 - 9:02)
 
* Council
 
* Council
** survey 2017 plots?
+
** visit NGEE Eddy flux site
 +
** verify that green led on LI7700 is blinking away
 +
** check battery voltage if it is easy
 +
** take pictures of the tables from the warming experiment loggers
 
** download data over radio for C2 (at minimum)
 
** download data over radio for C2 (at minimum)
 
** visit C2?
 
** visit C2?
 
** fix program at C1
 
** fix program at C1
 
* 10/6 depart
 
* 10/6 depart

Revision as of 15:57, 30 September 2017

  • Car Rental Reservation: R41747
    • 9/29 - 10/6
  • Nugget reservation 1346


Activities:

  • Nome
    • find new base station location with Chad
    • return GCI cable modem from Boxer Apartments
  • teller
    • move snow poles to TLA line
    • put one snow pole in each actual snow course center of X for the IS crosses.
    • remove remaining poles
  • teller bottom:
    • check soil moisture #5 (bottom) seems to be not powered / connected.
    • check heat flux plates
    • change sr50A transducers
    • download data
      • need sc32b for CR10X at teller SW
  • replace memory card in camera
    • sr50a transducer replacement, 2x
    • remove 1 PT
    • discharge measurement
  • add air temperature thermistor
  • add a resistor to thermistor multiplexer to confirm that everything is working well.
  • Tools required for Teller Tasks
    • small campbell screwdriver flat for Teller SW transducer removal
    • small campbell screwdriver phillips for SR50A replacement
    • 7/16" nut driver for radiation shield
    • cable ties for new air temperature
    • new program for teller bottom
    • new program for teller top
    • winter program for teller sw?
  • teller top:
    • double-check data
    • thermal conductivity probes working?
    • maybe replace cnr4
      • and or drill out stripped screws
  • replace memory card in camera
  • Kougarok m64
    • bring guy wire markers for K64 met station (at uaf storage)
    • setup snow grid for spring (surveying)
      • 9/25 waiting on geopdf & shape files from Lauren for this.
    • survey the remaining intensive sites out there:
      • IS5, IS6, IS8
    • soil pit.............
    • altar shield
      • need 2 2x4 chunks for base
      • need 2 more pieces of functional altar shield
      • need wood screws to screw vertical pipes to base.
  • Original Kougarok:
    • download data by radio
  • Council
    • fix program at C1 Grid
    • download C2 blueberry data over radio
    • push snow off eddy system.

Sensor Issues

Data Notes

  • Double-check thermistor equations
  • double-check precision resistor values.

Teller Bottom Soil:

  • teller bottom: confirm that thermistor values as-built match resistor in field.
  • Soil Moisture #5... is it connected?
  • Heat Flux Plates are doing the wrong thing... are they measured right?
  • thermal conductivity thermistors... it kind of looks like the measurement is still settling. The measurement is quite spikey from time to time.
  • Looks like VATP3 shifted on 4/21.
  • same for VATP4
  • same for VATP 6
  • same for vatp 8
  • same for vatp 9
  • can see water pulse around 4/21 in the lower thermistors.

http://ngeedata.iarc.uaf.edu/data/teller_bottom_soil/

Teller Bottom Spectral:

Teller Bottom Radiation:

Teller Bottom Snow Temp Profile:

Teller Bottom Thermal Conductivity:

  • data is spikey, in soil pit temperatures

http://ngeedata.iarc.uaf.edu/data/teller_bottom_soil/

Teller Top Met

  • HMP155 is still broken.
    • Lily fixed in August.
  • All other sensors look good.

http://ngeedata.iarc.uaf.edu/data/teller_top/

Teller Top Soil:

Teller Top Thermal Conductivity:

Kougarok Mile 64 Met

  • skin temperature looks like there is a loose wire
  • Other sensors look good.
  • http://ngeedata.iarc.uaf.edu/data/kg_m64/
    • I haven't processed this data just copied the raw files to the server. But, if you check that link you can view all of the raw data in the data visualizer.

Kougarok Mile 64 Spectral

  • all sensors look good

Kougarok Mile 64 Soil

  • soil temps look good but no soil pit just yet.

Loose Itinerary

  • 9/29 (8:18 - 9:36 Twilight to twilight)
    • evening: arrive & stay in apartments
  • 9/30 (8:21 - 9:19)
    • take some storage stuff to dump
    • evening: Lily arrives
    • stay in hotel
  • 10/1 (8:24 - 9:16)
  • Teller
    • walk the end point of the lines set up in March 2017 and remove the orange poles
    • place 4 poles at bottom to help outline location of channel for PTs
  • 10/2 (8:27 - 9:12)
    • Teller Top:
      • change desiccant which will require:
        • drill
        • drill bit
        • tap & die
        • replacement machine screws for stripped out ones.
    • Teller button up for winter, snow pole remainder
    • remove one PT at the bottom site
  • 10/3 (8:30 - 9:09)
    • drive to kougarok. download data over radios from K sites
    • stretch goal... visit k2 if time for thaw depth measurements
  • 10/4 (8:33 - 9:05)
    • kougarok m64 winter button up
    •  ??? soil pit ???
    • wonder if the heat flux plates were left in Fairbanks...
    • kougarok m64 finish surveying & deploy snow poles
  • 10/5 (8:36 - 9:02)
  • Council
    • visit NGEE Eddy flux site
    • verify that green led on LI7700 is blinking away
    • check battery voltage if it is easy
    • take pictures of the tables from the warming experiment loggers
    • download data over radio for C2 (at minimum)
    • visit C2?
    • fix program at C1
  • 10/6 depart