Revision as of 11:01, 3 July 2007

Bullen Point met

site TODO list

  • record as-built wiring of soil sensors
  • Flex conduit as needed

site logs

13 June 2007, Ken I., Doug K.

  • installed electric fence with 3 posts
  • no time to fix site cables
  • LOTS of fox scat around site, many chewed cables