Difference between revisions of "SS Site Visit 2018-03-22"

From IARC 207 Wiki
Jump to navigation Jump to search
(Created page with "* Clear snow off shed roof * setup dropbox file transfer for forest floor * confirmed file transfer for tower laptop * cleared snow off tower * secured tower LI7200RS on towe...")
 
 
Line 6: Line 6:
 
* confirmed both flow modules say 15.0 measured flow
 
* confirmed both flow modules say 15.0 measured flow
 
* SW update on old ss_main toughbook
 
* SW update on old ss_main toughbook
 +
* Looks like anemometer info was lost in SW/HW upgrade.  Will need to sort that out.
 +
* Not sure why the Tower Dewpoint and H2O concentrations are negative.
 +
* Bringing back gill manual to look into it further.
 +
* Should download digital configuration from LICOR website for each unit.

Latest revision as of 14:46, 22 March 2018

  • Clear snow off shed roof
  • setup dropbox file transfer for forest floor
  • confirmed file transfer for tower laptop
  • cleared snow off tower
  • secured tower LI7200RS on tower (had loosened)
  • confirmed both flow modules say 15.0 measured flow
  • SW update on old ss_main toughbook
  • Looks like anemometer info was lost in SW/HW upgrade. Will need to sort that out.
  • Not sure why the Tower Dewpoint and H2O concentrations are negative.
  • Bringing back gill manual to look into it further.
  • Should download digital configuration from LICOR website for each unit.