Difference between revisions of "SS To Do Next Visit"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 23: | Line 23: | ||
* look at longwave data from CNR4 because there is an issue of some sort.  | * look at longwave data from CNR4 because there is an issue of some sort.  | ||
* SS Heat FLux is off?  Check power in the remote enclosure  | * SS Heat FLux is off?  Check power in the remote enclosure  | ||
| − | *   | + | * bring out an enclosure for smartflux 2  | 
| + | * bring out a turk ethernet connector  | ||
Revision as of 13:39, 2 July 2018
2018
- Replace tower aspirator fans:
- https://catalog.orientalmotor.com/viewitems/mb-series-ac-centrifugal-fans-blowers/mb-series-50mm-centrifugal-fans-blowers
 - I need to confirm that this unit is the correct one. The one I took a picture of operates at 110VAC but I think some of the others operate at a lower voltage.
 
 - Deploy sensor refresh instruments from March.
- brought out 4pcs anemometers
 
 - Buy a new HMP155 for forest floor site
 - More PAR sensors and hardware for in-situ
 - Buy another SI-111 SDI12 model
 - Attend LI-COR training?
 - Polish Battery Backup System
 - replace Loggernet computer
 - The tower wifi antenna needs replacing. Do this next visit. The coax is weathered and fraying.
 - Submit PRs for Summer 2018 Instrument Recalibrations
- Vaisala HMP155s
 - MetOne 010C
 - Kipp & Zonen CNR4
 
 - Late Fall recalibrations:
- LI7200RS
 
 - XX Upgrade the smart flux 2 firmware on the tower
- figure out how to update smartflux eddypro settings
 
 - look at longwave data from CNR4 because there is an issue of some sort.
 - SS Heat FLux is off? Check power in the remote enclosure
 - bring out an enclosure for smartflux 2
 - bring out a turk ethernet connector