Difference between revisions of "SS To Do Next Visit"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 12: Line 12:
 
* Polish Battery Backup System
 
* Polish Battery Backup System
 
* replace Loggernet computer
 
* replace Loggernet computer
* The tower wifi antenna needs replacing. Do this next visit. The coax is weathered and fraying.
 
 
* Submit PRs for Summer 2018 Instrument Recalibrations
 
* Submit PRs for Summer 2018 Instrument Recalibrations
 
** Vaisala HMP155s
 
** Vaisala HMP155s
Line 18: Line 17:
 
** Kipp & Zonen CNR4  
 
** Kipp & Zonen CNR4  
 
* Late Fall recalibrations:
 
* Late Fall recalibrations:
** LI7200RS
 
* XX Upgrade the smart flux 2 firmware on the tower
 
** figure out how to update smartflux eddypro settings
 
* look at longwave data from CNR4 because there is an issue of some sort.
 
* SS Heat FLux is off?  Check power in the remote enclosure
 
* bring out an enclosure for smartflux 2
 
* bring out a turk ethernet connector
 

Revision as of 19:49, 6 July 2018

2018

  • Replace tower aspirator fans:
  • Deploy sensor refresh instruments from March.
    • brought out 4pcs anemometers
  • Buy a new HMP155 for forest floor site
  • More PAR sensors and hardware for in-situ
  • Buy another SI-111 SDI12 model
  • Attend LI-COR training?
  • Polish Battery Backup System
  • replace Loggernet computer
  • Submit PRs for Summer 2018 Instrument Recalibrations
    • Vaisala HMP155s
    • MetOne 010C
    • Kipp & Zonen CNR4
  • Late Fall recalibrations: