Difference between revisions of "SS To Do Next Visit"
Jump to navigation
Jump to search
(→2018) |
(→2018) |
||
Line 6: | Line 6: | ||
** 7/6/18 yes all are 110VAC | ** 7/6/18 yes all are 110VAC | ||
* Deploy sensor refresh instruments from March. | * Deploy sensor refresh instruments from March. | ||
− | |||
* Buy a new HMP155 for forest floor site | * Buy a new HMP155 for forest floor site | ||
* More PAR sensors and hardware for in-situ | * More PAR sensors and hardware for in-situ |
Revision as of 10:43, 7 July 2018
2018
- Replace tower aspirator fans:
- https://catalog.orientalmotor.com/viewitems/mb-series-ac-centrifugal-fans-blowers/mb-series-50mm-centrifugal-fans-blowers
- I need to confirm that this unit is the correct one. The one I took a picture of operates at 110VAC but I think some of the others operate at a lower voltage.
- 7/6/18 yes all are 110VAC
- Deploy sensor refresh instruments from March.
- Buy a new HMP155 for forest floor site
- More PAR sensors and hardware for in-situ
- Buy another SI-111 SDI12 model
- Attend LI-COR training?
- Polish Battery Backup System
- replace Loggernet computer
- Submit PRs for Summer 2018 Instrument Recalibrations
- Vaisala HMP155s
- MetOne 010C
- Kipp & Zonen CNR4
- Late Fall recalibrations: