 (→2018)  | 
				|||
| Line 5: | Line 5: | ||
** https://catalog.orientalmotor.com/viewitems/mb-series-ac-centrifugal-fans-blowers/mb-series-50mm-centrifugal-fans-blowers  | ** https://catalog.orientalmotor.com/viewitems/mb-series-ac-centrifugal-fans-blowers/mb-series-50mm-centrifugal-fans-blowers  | ||
* More PAR sensors and hardware for in-situ  | * More PAR sensors and hardware for in-situ  | ||
| − | |||
* Attend LI-COR training?  | * Attend LI-COR training?  | ||
* Polish Battery Backup System  | * Polish Battery Backup System  | ||
| Line 27: | Line 26: | ||
* I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed.  That could be sorted out.  | * I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed.  That could be sorted out.  | ||
* connect those shop power strips and get one more for inside?  | * connect those shop power strips and get one more for inside?  | ||
| − | *   | + | * SI-111 install  | 
* buy and add more PAR top and bottom (4x and matching hardware)  | * buy and add more PAR top and bottom (4x and matching hardware)  | ||
* add another tipping bucket.  | * add another tipping bucket.  | ||
| − | + | * bring solder out for ff atrh blower and electrical goo  | |
| − | * bring solder out for ff atrh and electrical goo  | ||
===Nearly end of summer status====  | ===Nearly end of summer status====  | ||
Revision as of 12:38, 24 August 2018
Publications List
2018
- More PAR sensors and hardware for in-situ
 - Attend LI-COR training?
 - Polish Battery Backup System
 - replace Loggernet computer
- bring out an NL100 or USB to serial adapter
 
 - Submit PRs for Summer 2018 Instrument Recalibrations
- Vaisala HMP155s
 - MetOne 010C
 - Kipp & Zonen CNR4
 
 - Late Fall recalibrations:
- LI-7200s
 
 
Ss soil has room on c7 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.
- need to extend the SI-421 I've located and then it is ready to deploy at forest floor radiation tower
- will need to set SDI12 ID
 
 
Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.
- Replace SR50A transducers
 - Dig second pit for soil instruments
 - clean up outdoor power cords
 - waterproof a bit some of the tower blowers (might be as easy as more cable ties / tape to keep the white box deals right side up.
 - I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed. That could be sorted out.
 - connect those shop power strips and get one more for inside?
 - SI-111 install
 - buy and add more PAR top and bottom (4x and matching hardware)
 - add another tipping bucket.
 - bring solder out for ff atrh blower and electrical goo
 
Nearly end of summer status=
- Get a handle on remaining budget
 - re-calibrate as many sensors as able
 - buy a couple more sensors as able
 - licor training if possible
 - write program for new soil pit box
- soil moisture at 2+ depths
 - soil temp