Difference between revisions of "NGEE Teller SW Notes"

From IARC 207 Wiki
Jump to navigation Jump to search
(Created page with "===Latest=== * Officially processed through 10/2017 * Partway through processing to 6/15. * hoping to establish stage/discharge curve in 2018 ===Stage 2016=== ===Stage 2017=...")
 
Line 6: Line 6:
 
===Stage 2016===
 
===Stage 2016===
  
 +
8/13/2016 3:00 PTs offset
 +
9/14/2016 22:00 PT1 Position Reset & PT2 Removed
 
===Stage 2017===
 
===Stage 2017===
 +
 +
4/1/2017 3:00 Station Turned back on, PT2 in place further downstream
 +
10/1/2017 20:00 PT2 Removed
 +
4/28/2017 1:50 shift in pt2? then
  
 
===Stage 2018===
 
===Stage 2018===
  
====Site Downloads / visits:===
+
===Site Downloads / visits:===
 
* Bob 4/21/2016 (CR1000)
 
* Bob 4/21/2016 (CR1000)
 
* Lily 7/13/2016 (CR1000)
 
* Lily 7/13/2016 (CR1000)
Line 20: Line 26:
 
* Bob 3/30/2018
 
* Bob 3/30/2018
 
* Bob 6/13 & 15/2018
 
* Bob 6/13 & 15/2018
 +
 +
===From Computer Notes===
 +
Need to put into a spreadsheet pressure transducer value / date / manual stage reading.... need to review notes.
 +
 +
Related: discharge measurements
 +
Related: Get manual stage & discharge measurements into UTC time.
 +
 +
Then once that is complete can look at using
 +
/var/site/uaf_sp/bin/teller_sw.sh
 +
and the step utility function to correct everything to proper heights.
 +
...should think about gedit plug ins too to make it more like xed.
 +
 +
Original Google Doc:
 +
* https://docs.google.com/spreadsheets/d/159Q7kFOTAE0pZyx2WgFBhe4qVnLEEM8diSVuSYGRkjE/edit#gid=1602029777
 +
Summary Google Doc:
 +
* https://docs.google.com/spreadsheets/d/1gxLKzjoDvJkFmkDe0SVBhRRbokB-rvEpH77nN8cyLo0/edit#gid=1602029777
 +
 +
 +
2/8: So.... including precip helps but there is still a period in september / october 2016 that confuses me with the diurnal signal looking more like air temperature driven.  Emily and I sort of think that the heating of the cable might be playing a role here but I haven't looked too hard yet.

Revision as of 13:19, 26 June 2018

Latest

  • Officially processed through 10/2017
  • Partway through processing to 6/15.
  • hoping to establish stage/discharge curve in 2018

Stage 2016

8/13/2016 3:00	PTs offset
9/14/2016 22:00	PT1 Position Reset & PT2 Removed

Stage 2017

4/1/2017 3:00	Station Turned back on, PT2 in place further downstream
10/1/2017 20:00	PT2 Removed
4/28/2017 1:50 shift in pt2? then 

Stage 2018

Site Downloads / visits:

  • Bob 4/21/2016 (CR1000)
  • Lily 7/13/2016 (CR1000)
  • Bob/Lily 8/12/2016 (CR1000)
  • Bob 9/14/2016
  • Bob 4/1/2017
  • Bob 5/2017
  • Bob/Lily 10/1/2017
  • Bob 3/30/2018
  • Bob 6/13 & 15/2018

From Computer Notes

Need to put into a spreadsheet pressure transducer value / date / manual stage reading.... need to review notes.
Related: discharge measurements
Related: Get manual stage & discharge measurements into UTC time.
Then once that is complete can look at using 
/var/site/uaf_sp/bin/teller_sw.sh
and the step utility function to correct everything to proper heights.
...should think about gedit plug ins too to make it more like xed.

Original Google Doc:

Summary Google Doc:


2/8: So.... including precip helps but there is still a period in september / october 2016 that confuses me with the diurnal signal looking more like air temperature driven.  Emily and I sort of think that the heating of the cable might be playing a role here but I haven't looked too hard yet.