Difference between revisions of "NGEE Teller SW Notes"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | [[NGEE]] | ||
===Latest=== | ===Latest=== | ||
* Unofficially processed through 9/2018 | * Unofficially processed through 9/2018 |
Revision as of 10:54, 16 October 2018
Contents
Latest
- Unofficially processed through 9/2018
- there are some early winter 2017 peaks I think should be considered.
- hoping to establish stage/discharge curve in 2018
Stage 2016
8/13/2016 3:00 PTs offset 9/14/2016 22:00 PT1 Position Reset & PT2 Removed
Stage 2017
4/1/2017 3:00 Station Turned back on, PT2 in place further downstream 10/1/2017 20:00 PT2 Removed 4/28/2017 1:50 shift in pt2? then
Stage 2018
6/15 9/26
Site Downloads / visits:
- Bob 4/21/2016 (CR1000)
- Lily 7/13/2016 (CR1000)
- Bob/Lily 8/12/2016 (CR1000)
- Bob 9/14/2016
- Bob 4/1/2017
- Bob 5/2017
- Bob/Lily 10/1/2017
- Bob 3/30/2018
- Bob 6/13 & 15/2018
- Bob 9/26/2018
From Computer Notes
Need to put into a spreadsheet pressure transducer value / date / manual stage reading.... need to review notes.
Related: discharge measurements Related: Get manual stage & discharge measurements into UTC time.
Then once that is complete can look at using /var/site/uaf_sp/bin/teller_sw.sh and the step utility function to correct everything to proper heights. ...should think about gedit plug ins too to make it more like xed.
Original Google Doc:
Summary Google Doc:
2/8: So.... including precip helps but there is still a period in september / october 2016 that confuses me with the diurnal signal looking more like air temperature driven. Emily and I sort of think that the heating of the cable might be playing a role here but I haven't looked too hard yet.