Difference between revisions of "SS Site Visit 2018-07-02"

From IARC 207 Wiki
Jump to navigation Jump to search
(Created page with "* Verified that the jamstec atv is in the proper storage * replaced the top four anemometers on the tower * need to dig out turck ethernet adapter for new eddy processor. * br...")
 
(No difference)

Latest revision as of 17:41, 2 July 2018

  • Verified that the jamstec atv is in the proper storage
  • replaced the top four anemometers on the tower
  • need to dig out turck ethernet adapter for new eddy processor.
  • bring out instrument box
  • bring metric wrench for gill nuts/bolts
  • bring out clipboard with wiring info for gill
  • look again at LW data for tower top... I think the temperature cable isn't seated correctly.

Anemometer Replacement

  • WS5
Removed: J10853
Replaced with: U16626
  • WS6
Removed: J10854
Replaced with: U16628
  • WS7
Removed: J10855
Replaced with: U16625
  • WS8
Removed: J10856
Replaced with: U16627
  • Leaving Waders at site.