Line 14: | Line 14: | ||
* measure VATP thermistors | * measure VATP thermistors | ||
* relevel radiometer | * relevel radiometer | ||
− | * bring out one step stool to level teller bottom radiometer. | + | * '''bring out one step stool to level teller bottom radiometer.''' |
+ | * tap new hole in CNR4 & replace desiccant | ||
+ | * bring desiccant for box | ||
+ | * | ||
=====Teller Surface Water===== | =====Teller Surface Water===== |
Revision as of 17:57, 6 September 2018
Contents
Activities
Support Chinese Delegation
- September 18: Arrive in Nome
- 9/17 Meet Bob Metcalf
- 9/17 - 9/19: Final Site Selection & Install ground instruments
- 9/20-25: Get permits & install sites
- September 26 Evening: Leave for Fairbanks
Teller
- Check the next visit page (I'll copy/paste at some point)
Teller Bottom
- change transducers for snow depth sensors
- download data
- measure VATP thermistors
- relevel radiometer
- bring out one step stool to level teller bottom radiometer.
- tap new hole in CNR4 & replace desiccant
- bring desiccant for box
Teller Surface Water
- download data
- replace desiccant
- discharge measurement with salt slug
- Need to secure solar panel before winter with nails
- YSI conductivity meter
Teller Top
- download data
- change transducers for snow depth sensors
- relevel radiometer
Council
Council C1 Grid
- Would be great to visit C1 site and download data
- Redrill hole for C1 Grid temperature probe
Skookum Pass
- I'd like to visit site and swap out data logger so that we can retrieve data from Nome again. currently have to use a computer in Fairbanks. Also need to change program to add radio on/off sophistication as the icing the last two winters has been keeping solar panel inaccessible until April (with respect to battery charging)
Kougarok
Kougarok Mile 64
- don't really need snow depth here it would seem but just double check all measurements and relevel radiometer / precip
- any surveying to be done before next spring?
Kougarok 10m tower
- A station visit to would be awesome even for just 2 hours to double-check site in anticipation of it being used for the disturbance study.
Kougarok Mauze gulch
- Minimum would be download data by radio
Kougarok Burn Site
- Download data by radio