+ | ===To Ship=== | ||
+ | * Trimble Batteries | ||
+ | ** bring out non spillable paperwork too for return. | ||
+ | |||
+ | ===To Take Bolton=== | ||
+ | * Trimble system with no lithium batteries | ||
+ | * nrs straps | ||
+ | * soil sample volume | ||
+ | * sat phone | ||
+ | * tracker | ||
+ | * lg actionpacker | ||
+ | * conductivity meter for discharge measurement | ||
+ | * sample bottle for discharge measurement | ||
+ | * 100g salt ziplocs | ||
+ | * SC32B f | ||
+ | * volt meter | ||
+ | * Tap & Die | ||
+ | * desiccant for teller bottom | ||
+ | * SR50A transducers once they arrive | ||
+ | * a ziploc labeled Nome | ||
+ | |||
+ | ===To Take Busey=== | ||
+ | * All necessary lithium batteries | ||
+ | * toughbook | ||
+ | * snacks | ||
+ | * new fieldbook | ||
+ | |||
+ | ===To Do Yet=== | ||
+ | * GeoPDFs with new points | ||
+ | * Load XML into trimble software and copy over to handheld controller | ||
+ | * step stool for teller bottom | ||
+ | |||
+ | ===Favors=== | ||
+ | * Ask Stan to borrow a drill again | ||
+ | |||
===Activities=== | ===Activities=== | ||
====Support Chinese Delegation==== | ====Support Chinese Delegation==== | ||
Line 9: | Line 44: | ||
====Teller==== | ====Teller==== | ||
* Check the next visit page (I'll copy/paste at some point) | * Check the next visit page (I'll copy/paste at some point) | ||
+ | |||
=====Teller Bottom===== | =====Teller Bottom===== | ||
* change transducers for snow depth sensors | * change transducers for snow depth sensors | ||
Line 35: | Line 71: | ||
* Would be great to visit C1 site and download data | * Would be great to visit C1 site and download data | ||
* Redrill hole for C1 Grid temperature probe | * Redrill hole for C1 Grid temperature probe | ||
+ | |||
=====Skookum Pass===== | =====Skookum Pass===== | ||
* I'd like to visit site and swap out data logger so that we can retrieve data from Nome again. currently have to use a computer in Fairbanks. Also need to change program to add radio on/off sophistication as the icing the last two winters has been keeping solar panel inaccessible until April (with respect to battery charging) | * I'd like to visit site and swap out data logger so that we can retrieve data from Nome again. currently have to use a computer in Fairbanks. Also need to change program to add radio on/off sophistication as the icing the last two winters has been keeping solar panel inaccessible until April (with respect to battery charging) | ||
Line 45: | Line 82: | ||
=====Kougarok 10m tower===== | =====Kougarok 10m tower===== | ||
* A station visit to would be awesome even for just 2 hours to double-check site in anticipation of it being used for the disturbance study. | * A station visit to would be awesome even for just 2 hours to double-check site in anticipation of it being used for the disturbance study. | ||
+ | * Mandatory download data though even if by radio | ||
+ | * level radiometers | ||
+ | * replace radiometer desiccant | ||
=====Kougarok Mauze gulch===== | =====Kougarok Mauze gulch===== |
Revision as of 19:23, 7 September 2018
To Ship
- Trimble Batteries
- bring out non spillable paperwork too for return.
To Take Bolton
- Trimble system with no lithium batteries
- nrs straps
- soil sample volume
- sat phone
- tracker
- lg actionpacker
- conductivity meter for discharge measurement
- sample bottle for discharge measurement
- 100g salt ziplocs
- SC32B f
- volt meter
- Tap & Die
- desiccant for teller bottom
- SR50A transducers once they arrive
- a ziploc labeled Nome
To Take Busey
- All necessary lithium batteries
- toughbook
- snacks
- new fieldbook
To Do Yet
- GeoPDFs with new points
- Load XML into trimble software and copy over to handheld controller
- step stool for teller bottom
Favors
- Ask Stan to borrow a drill again
Activities
Support Chinese Delegation
- September 18: Arrive in Nome
- 9/17 Meet Bob Metcalf
- 9/17 - 9/19: Final Site Selection & Install ground instruments
- 9/20-25: Get permits & install sites
- September 26 Evening: Leave for Fairbanks
Teller
- Check the next visit page (I'll copy/paste at some point)
Teller Bottom
- change transducers for snow depth sensors
- download data
- measure VATP thermistors
- relevel radiometer
- bring out one step stool to level teller bottom radiometer.
- tap new hole in CNR4 & replace desiccant
- bring desiccant for box
Teller Surface Water
- download data
- replace desiccant
- discharge measurement with salt slug
- Need to secure solar panel before winter with nails
- YSI conductivity meter
Teller Top
- download data
- change transducers for snow depth sensors
- relevel radiometer
Council
Council C1 Grid
- Would be great to visit C1 site and download data
- Redrill hole for C1 Grid temperature probe
Skookum Pass
- I'd like to visit site and swap out data logger so that we can retrieve data from Nome again. currently have to use a computer in Fairbanks. Also need to change program to add radio on/off sophistication as the icing the last two winters has been keeping solar panel inaccessible until April (with respect to battery charging)
Kougarok
Kougarok Mile 64
- don't really need snow depth here it would seem but just double check all measurements and relevel radiometer / precip
- any surveying to be done before next spring?
Kougarok 10m tower
- A station visit to would be awesome even for just 2 hours to double-check site in anticipation of it being used for the disturbance study.
- Mandatory download data though even if by radio
- level radiometers
- replace radiometer desiccant
Kougarok Mauze gulch
- Minimum would be download data by radio
Kougarok Burn Site
- Download data by radio