Difference between revisions of "SS Site Visit 201-05-17 to 27"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 17: | Line 17: | ||
* solder HMPcable  | * solder HMPcable  | ||
* figure out if smartflux2 at forest floor is properly configured.  | * figure out if smartflux2 at forest floor is properly configured.  | ||
| + | * network performance of tower toughbook  | ||
Revision as of 11:42, 26 May 2019
Fixes
- Replace power cable connector for aspirators (animal chew)
 - replace LI7550 at forest floor
 - swap out tower top CNR4
 - computer maintenance on PEN Camera
 - computer maintenance on ss-lognet
 - add arable
 - add soil pit 2
 - check the precip bucket... still good
 - program mod for ss_met and ss_soil to output arable variables on the five minutes
 - program and wire up soil pit box
 - retire old ss-main toughbook
 
To Do Yet
- fix tower network cable
 - solder HMPcable
 - figure out if smartflux2 at forest floor is properly configured.
 - network performance of tower toughbook