Difference between revisions of "2021 NGEE Nome June Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 2: Line 2:
 
* Join ORNL / Sigrid team partway through
 
* Join ORNL / Sigrid team partway through
  
 +
===Stuff to Pre-Ship===
 +
* Any gear
 +
* Personal Gear
  
 
===Broken Things to Look at===
 
===Broken Things to Look at===

Revision as of 10:37, 14 May 2021

Rough plan

  • Join ORNL / Sigrid team partway through

Stuff to Pre-Ship

  • Any gear
  • Personal Gear

Broken Things to Look at

Teller m47

  • Grab from UAF storage the two spare AT/RH to swap in.

Teller SW

  • Need a battery and CR800 w/ program
    • worst case could grab a battery from teller bottom...

Teller Bottom

  • Heat Flux Plate... Loose Wires?
  • Measure how far VATP is sticking out of the ground
  • Grab the missing gap of data off logger.

Teller Top

  • HMP155 needs replacing
  • Program Changes:
    • log resistance of thermal conductivity probes instead of temperature.
    • Maybe change the file saving from filling the memory as is done at present.
  • Measure how far VATP is sticking out of the ground

Council Grid

Kougarok m64

  • LOTS of broken

Kougarok 10m tower

  • Download Data over radio

Kougarok Burn Site

  • Download Data over radio