Difference between revisions of "2021 NGEE Nome August Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 1: Line 1:
Q6 / Kougarok focus.  Helping Go mostly.
+
NGEE Project Disturbance / Kougarok focus.  Helping Go mostly.
 
* Plan to visit all three Kougarok met stations...
 
* Plan to visit all three Kougarok met stations...
 +
* Measure ground control at NGEE Koguarok mile 64 site
 
* Thaw depth and subsidence survey
 
* Thaw depth and subsidence survey
* Measure creek flow
+
* Measure creek flow at Teller mile 27 site
 +
(Most of this trip itinerary is beign driven by Go)

Revision as of 08:53, 23 July 2021

NGEE Project Disturbance / Kougarok focus. Helping Go mostly.

  • Plan to visit all three Kougarok met stations...
  • Measure ground control at NGEE Koguarok mile 64 site
  • Thaw depth and subsidence survey
  • Measure creek flow at Teller mile 27 site

(Most of this trip itinerary is beign driven by Go)