Line 6: Line 6:
 
** 1pcs 5' 3/4 schedule 40 pipe / rigid electrical conduit.  
 
** 1pcs 5' 3/4 schedule 40 pipe / rigid electrical conduit.  
 
* Vertical adjustable elevation pipe
 
* Vertical adjustable elevation pipe
** 1pcs 7' 3/4 schedule 40 pipe / rigid conduit  
+
** 1pcs 6' 3/4 schedule 40 pipe / rigid conduit (short stand)
 +
** 1pcs 10' 3/4 schedule 40 pipe / rigid conduit (tall stand)
 
* Diagonal support pipe
 
* Diagonal support pipe
** 1pcs 3' 3/4 schedule 40 pipe / rigid conduit
+
** 1pcs 4' 3/4 schedule 40 pipe / rigid conduit
 
* Ground support
 
* Ground support
 
** 2pcs 5' Slotted Unistrut
 
** 2pcs 5' Slotted Unistrut

Revision as of 16:15, 16 August 2021

Current Parts List

  • Snow Depth Sensor
    • 1 SR50A
  • Snow depth sensor pipe mount
  • Horizontal top pipe
    • 1pcs 5' 3/4 schedule 40 pipe / rigid electrical conduit.
  • Vertical adjustable elevation pipe
    • 1pcs 6' 3/4 schedule 40 pipe / rigid conduit (short stand)
    • 1pcs 10' 3/4 schedule 40 pipe / rigid conduit (tall stand)
  • Diagonal support pipe
    • 1pcs 4' 3/4 schedule 40 pipe / rigid conduit
  • Ground support
    • 2pcs 5' Slotted Unistrut
  • Main Vertical piece
    • 6' 4x4 Wooden lumber
  • Cast Hardware
    • 2pcs 3/4" flush pipe mounts
    • 1pcs 3-way Tee
    • 1pcs pipe to pipe swivel fitting
    • 1pcs wood to pipe swivel fitting
  • Guy Wires
    • 15ft 3/16" wire rope
    • 4pcs 3/16" wire rope clamps
  • Nuts and Bolts
  • 2pcs 4.5" x 1/2" coarse thread bolt
  • 4pcs 1/2" washer
  • 2pcs 1/2" nylock nut
  • 4pcs 5" x 5/16" coarse thread bolt
  • 8pcs 5/16" washer
  • 4pcs 5/16" nylock nut
  • Anchors
    • 2pcs 1/2" or smaller x at least 24" rebar / steak of some kind
    • 1 pcs screw in anchor

Preparation before field

  • Drill a 5/16" hole on both sides of the 5 ft pipe
  • Drill a 1/2" hole at one end of each piece of unistrut
  • Assemble SR50A & mounting bracket
  • Drill holes in 4x4 in proper place for the unitstrut stabilizers (a bit open ended here)

Procedure in the field