Difference between revisions of "2021 NGEE Nome September Trip"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | ==Pretrip activities== | |
* Test out a bit more the thermistor version thermal conductivity probes. | * Test out a bit more the thermistor version thermal conductivity probes. | ||
* Look for more CF cards to leave at NGEE Koug and Teller Bottom. | * Look for more CF cards to leave at NGEE Koug and Teller Bottom. | ||
− | + | ==To Ship== | |
− | * Actionpackers with equipment | + | * XX Actionpackers with equipment |
− | * the snow stand supplies | + | * XX the snow stand supplies |
+ | * A bit more. | ||
− | + | ==Day 1== | |
* Fly to Nome | * Fly to Nome | ||
* Get gear from container | * Get gear from container | ||
− | * start batteries charging | + | * XX start batteries charging |
* if time run out to Teller and set up GPS to log at GCP / install new PT for Teller SW / Make a discharge measurement | * if time run out to Teller and set up GPS to log at GCP / install new PT for Teller SW / Make a discharge measurement | ||
* Would be nice to grab the CR6 (& enclosure) from conex and use it in a place with wifi to get CR6 driver installed. | * Would be nice to grab the CR6 (& enclosure) from conex and use it in a place with wifi to get CR6 driver installed. | ||
− | + | ||
+ | ==Day x== | ||
* Teller m47 CAS | * Teller m47 CAS | ||
* Download Data | * Download Data | ||
Line 27: | Line 29: | ||
** charge controller | ** charge controller | ||
** radiation shield for new air temp | ** radiation shield for new air temp | ||
− | + | == Day X== | |
* Visit Teller Basin | * Visit Teller Basin | ||
** Download data | ** Download data | ||
** check level of radiometer & precip buckets | ** check level of radiometer & precip buckets | ||
** change out transducers on snow sensors | ** change out transducers on snow sensors | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Teller CAS Bonus=== | ===Teller CAS Bonus=== | ||
* CR800 Logger | * CR800 Logger | ||
* Tipping bucket | * Tipping bucket | ||
+ | ** stand for it | ||
+ | *** 2pcs 4' 3/4" pipe | ||
+ | *** 1 pcs 2' 3/4" pipe | ||
+ | *** 2 pcs cross mounts | ||
+ | *** 2 pcs hose clamps (I have the length in the wiki someplace I believe) | ||
+ | *** 3 screed stakes | ||
* Air Temperature | * Air Temperature | ||
+ | ** need to make | ||
* Radiation Shield | * Radiation Shield | ||
* Instrument Box | * Instrument Box | ||
* Battery | * Battery | ||
* Solar Panel | * Solar Panel | ||
− | * | + | * battery box |
+ | * 12v battery leads | ||
+ | * charge controller | ||
====To fix out there==== | ====To fix out there==== | ||
Line 68: | Line 58: | ||
* Do something different with their solar panel? | * Do something different with their solar panel? | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | ====To | + | ==Copied from NGEE Next Visit== |
− | * | + | ====Teller 27 General==== |
+ | * Survey GCP | ||
+ | * Help | ||
+ | ====Teller Bottom To Do==== | ||
+ | * check level of radiometer | ||
+ | ** (changed desiccant in June) | ||
+ | * Secure tipping bucket | ||
+ | ** bring out drill | ||
+ | ** bring out self tapping screws, 3x | ||
+ | * Bring parts to redo snow stand. | ||
+ | * check level of tipping bucket | ||
+ | |||
+ | =====Teller Bottom Packing List===== | ||
+ | * cordless drill | ||
+ | * drill bit | ||
+ | * quick bit for self tapping screws | ||
+ | * four self tapping screws | ||
+ | * 2x snow transducer | ||
+ | * vertical pipe 6' tall for snow stand | ||
+ | * Hand Tool List | ||
+ | ** '''Net radiometer level''' | ||
+ | *** #2 Phillips screw driver (for leveling net radiometer) | ||
+ | *** circle level | ||
+ | ** '''Radiometer arm level''' | ||
+ | *** 5/16" nut driver | ||
+ | *** Flat screwdriver | ||
+ | **'''Precip bucket beef up''' | ||
+ | *** 3-4 self tapping screws | ||
+ | *** quick release nut driver for the self tapping screws | ||
+ | *** quick release drill bit | ||
+ | ** '''snow stand fix''' ''(need to review video again.)'' The vertical pipe looks to be a 1" EMT maybe? so I just need to figure what to replace that with. I should review snow data for max depth, too to settle on sensor height. | ||
+ | *** allen wrenches? | ||
+ | *** 1/2" nut driver & wrench | ||
+ | ** 2x '''snow transducer swap''' | ||
+ | *** campbell phillips screw driver | ||
+ | *** campbell flat screw driver | ||
+ | |||
+ | ====Teller SW To Do==== | ||
+ | * Solar Panel Fixes (research in Fairbanks) | ||
+ | * Deploy second PT | ||
+ | * don't forget to grab more desiccant | ||
+ | * Add a snow sensor here? | ||
+ | =====Teller SW Packing List===== | ||
+ | * '''@Conex''' Bring out flow meter to make a measurement again. | ||
+ | * lead weights... Nome or Fairbanks? Review video / the conex tour | ||
+ | * new pressure transducer | ||
+ | * PT tube desiccant | ||
+ | * PT Loose desiccant | ||
+ | * cable ties | ||
+ | * maybe a bit of flex conduit | ||
+ | * For the solar panel fix... need to look at pictures again.! | ||
+ | * '''Hand Tools List''' | ||
+ | ** '''Pressure Transducer addition''' | ||
+ | ** wire snake | ||
+ | ** | ||
+ | |||
+ | ====Teller m47==== | ||
+ | * Think hard about getting the solar panel off the ground a bit more | ||
+ | * Install Tipping bucket | ||
+ | * new dry soil pit / dig up and replace original | ||
+ | ** add soil moisture probes, too. | ||
+ | * review what i proposed | ||
+ | ** 4 soil moisture probes | ||
+ | ** air temp | ||
+ | ** second snow sensor | ||
+ | ** batteries | ||
+ | ** solar panel | ||
+ | ** cr800 | ||
+ | ====Council==== | ||
+ | * Survey Sigrid / Margaret's sites | ||
+ | ====NGEE Kougarok==== | ||
+ | * Survey GCP | ||
− | ==== | + | ===== Replace top mast and anemometer===== |
− | * | + | * Full replacement anemometer |
− | * | + | ** potentially could reuse one from storage but will need: |
− | * | + | *** propeller (need to order) |
− | * | + | *** cable (fairbanks supplies) |
− | * | + | *** right size cord grip (I'm sure this is found in my Fairbanks supplies... or the one that's currently broken... ) |
− | * | + | *** unistrut & 1" pipe & ubolts (try the square ones?) |
− | * | + | *** nylock nuts |
− | * | + | * new brown tarp |
− | * 2- | + | * bring out replacement card... could send new program that doesn't save out the soils data any more to increase storage... |
− | * | + | * put soil moisture probe back in ground. |
− | * | + | * I guess remove VATP from program to make the data record last longer. |
− | * | + | * '''@Conex''' |
− | * | + | ** Ladder (for anemometer fix) |
− | * | + | * '''@Tools Required''' |
+ | ** 1/2" box wrench / nut driver | ||
+ | ** 5/16" nut driver | ||
+ | =====NGEE Koguarok Parts Packed in Fairbanks===== | ||
+ | * 2 u-bolts for 1" pipe | ||
+ | * 2 u-bolts for 1.25" pipe | ||
+ | * 1 pcs CF memory card | ||
+ | * 1 pcs 1" top pipe | ||
+ | * 1 pcs propeller, front nut | ||
+ | * 1 pcs spare anemometer cable | ||
+ | * --> Brown Tarp? |
Latest revision as of 09:20, 4 September 2021
Pretrip activities
- Test out a bit more the thermistor version thermal conductivity probes.
- Look for more CF cards to leave at NGEE Koug and Teller Bottom.
To Ship
- XX Actionpackers with equipment
- XX the snow stand supplies
- A bit more.
Day 1
- Fly to Nome
- Get gear from container
- XX start batteries charging
- if time run out to Teller and set up GPS to log at GCP / install new PT for Teller SW / Make a discharge measurement
- Would be nice to grab the CR6 (& enclosure) from conex and use it in a place with wifi to get CR6 driver installed.
Day x
- Teller m47 CAS
- Download Data
- setup new tiny station
- precip bucket stand
- 3x pieces of pipe
- 2x screed stake
- 1x three way deal
- 2x hose clamps
- hang Airtemp
- mount tiny solar panel
- extra battery
- charge controller
- radiation shield for new air temp
- precip bucket stand
Day X
- Visit Teller Basin
- Download data
- check level of radiometer & precip buckets
- change out transducers on snow sensors
Teller CAS Bonus
- CR800 Logger
- Tipping bucket
- stand for it
- 2pcs 4' 3/4" pipe
- 1 pcs 2' 3/4" pipe
- 2 pcs cross mounts
- 2 pcs hose clamps (I have the length in the wiki someplace I believe)
- 3 screed stakes
- stand for it
- Air Temperature
- need to make
- Radiation Shield
- Instrument Box
- Battery
- Solar Panel
- battery box
- 12v battery leads
- charge controller
To fix out there
- New dry pit using other station's hardware?
- Do something different with their solar panel?
Copied from NGEE Next Visit
Teller 27 General
- Survey GCP
- Help
Teller Bottom To Do
- check level of radiometer
- (changed desiccant in June)
- Secure tipping bucket
- bring out drill
- bring out self tapping screws, 3x
- Bring parts to redo snow stand.
- check level of tipping bucket
Teller Bottom Packing List
- cordless drill
- drill bit
- quick bit for self tapping screws
- four self tapping screws
- 2x snow transducer
- vertical pipe 6' tall for snow stand
- Hand Tool List
- Net radiometer level
- #2 Phillips screw driver (for leveling net radiometer)
- circle level
- Radiometer arm level
- 5/16" nut driver
- Flat screwdriver
- Precip bucket beef up
- 3-4 self tapping screws
- quick release nut driver for the self tapping screws
- quick release drill bit
- snow stand fix (need to review video again.) The vertical pipe looks to be a 1" EMT maybe? so I just need to figure what to replace that with. I should review snow data for max depth, too to settle on sensor height.
- allen wrenches?
- 1/2" nut driver & wrench
- 2x snow transducer swap
- campbell phillips screw driver
- campbell flat screw driver
- Net radiometer level
Teller SW To Do
- Solar Panel Fixes (research in Fairbanks)
- Deploy second PT
- don't forget to grab more desiccant
- Add a snow sensor here?
Teller SW Packing List
- @Conex Bring out flow meter to make a measurement again.
- lead weights... Nome or Fairbanks? Review video / the conex tour
- new pressure transducer
- PT tube desiccant
- PT Loose desiccant
- cable ties
- maybe a bit of flex conduit
- For the solar panel fix... need to look at pictures again.!
- Hand Tools List
- Pressure Transducer addition
- wire snake
Teller m47
- Think hard about getting the solar panel off the ground a bit more
- Install Tipping bucket
- new dry soil pit / dig up and replace original
- add soil moisture probes, too.
- review what i proposed
- 4 soil moisture probes
- air temp
- second snow sensor
- batteries
- solar panel
- cr800
Council
- Survey Sigrid / Margaret's sites
NGEE Kougarok
- Survey GCP
Replace top mast and anemometer
- Full replacement anemometer
- potentially could reuse one from storage but will need:
- propeller (need to order)
- cable (fairbanks supplies)
- right size cord grip (I'm sure this is found in my Fairbanks supplies... or the one that's currently broken... )
- unistrut & 1" pipe & ubolts (try the square ones?)
- nylock nuts
- potentially could reuse one from storage but will need:
- new brown tarp
- bring out replacement card... could send new program that doesn't save out the soils data any more to increase storage...
- put soil moisture probe back in ground.
- I guess remove VATP from program to make the data record last longer.
- @Conex
- Ladder (for anemometer fix)
- @Tools Required
- 1/2" box wrench / nut driver
- 5/16" nut driver
NGEE Koguarok Parts Packed in Fairbanks
- 2 u-bolts for 1" pipe
- 2 u-bolts for 1.25" pipe
- 1 pcs CF memory card
- 1 pcs 1" top pipe
- 1 pcs propeller, front nut
- 1 pcs spare anemometer cable
- --> Brown Tarp?