| + | ==Sensor Photo procedure==  | ||
| + | For recalibration swaps.  | ||
| + | * Picture 1 = The new sensor being deployed  | ||
| + | * Picture 2 = The old sensor being removed to send away for recalibration.  | ||
| + | |||
==Partial Task List==  | ==Partial Task List==  | ||
* Ground anchor strengthening  | * Ground anchor strengthening  | ||
* finish tracking power  | * finish tracking power  | ||
| − | *    | + | * XX Snow Transducer Swap  | 
| − | * Replace CNR4s  | + | * XX Replace CNR4s  | 
| − | * replace the anemometers starting from top  | + | * XX replace the anemometers starting from top  | 
| − | * pull out the eddy covariance units for recalibration  | + | * XX pull out the eddy covariance units for recalibration  | 
| − | * replace geonor   | + | * XX replace geonor antifreeze  | 
** I have written on the a bucket the ratio.  Also need to dilute the mix so I can drop at dump.  | ** I have written on the a bucket the ratio.  Also need to dilute the mix so I can drop at dump.  | ||
* Hang the SWE sensor  | * Hang the SWE sensor  | ||
| Line 13: | Line 18: | ||
* 12V battery backups  | * 12V battery backups  | ||
* replace UPS batteries?  | * replace UPS batteries?  | ||
| + | * Check output current of the two solar panels out there  | ||
| + | * change Tower IP address in scripted utilities.  | ||
==Activities==  | ==Activities==  | ||
| Line 25: | Line 32: | ||
* Swap Tower LI7200 (But need to update the calibration info still)  | * Swap Tower LI7200 (But need to update the calibration info still)  | ||
* Add an HDMI switch for monitor.  | * Add an HDMI switch for monitor.  | ||
| − | * Swap out top   | + | * Swap out top 3 anemometers & geonor  | 
| + | * Swap out net radiometers  | ||
| + | * update SS Met program for new radiometers  | ||
| + | * change snow transducers  | ||
| + | * 2x Solar panels: 320 W  /  33V / 9.61 A  | ||
Latest revision as of 12:41, 8 October 2021
Sensor Photo procedure
For recalibration swaps.
- Picture 1 = The new sensor being deployed
 - Picture 2 = The old sensor being removed to send away for recalibration.
 
Partial Task List
- Ground anchor strengthening
 - finish tracking power
 - XX Snow Transducer Swap
 - XX Replace CNR4s
 - XX replace the anemometers starting from top
 - XX pull out the eddy covariance units for recalibration
 - XX replace geonor antifreeze
- I have written on the a bucket the ratio. Also need to dilute the mix so I can drop at dump.
 
 - Hang the SWE sensor
 - Add the NL100 to the network
 - update the software
 - 12V battery backups
 - replace UPS batteries?
 - Check output current of the two solar panels out there
 - change Tower IP address in scripted utilities.
 
Activities
- 2021-10-06 12:00 AK DT -- changed liquids in the geonor.  8 liters 60/40 mix & 1 bottle baby oil
- Removed like 5.3 gallons
- (Which means that last year's mix amount for antifreeze was more than necessary). 5.3 gallons removed = Freezing point of bucket around -25C
 
 - 8 liters mix = 72.7 cm liquid with freezing point @ -40
- Realistically we only need the 60/40 mix to go to -40 by around April 1 so 72.7cm is extreme overkill and maybe I'll reduce the volumes down the road.
 
 - Re leveled stand, too.
 
 - Removed like 5.3 gallons
 - Plugged in tipping bucket heater
 - Remove Forest Floor LI7200
 - Swap Tower LI7200 (But need to update the calibration info still)
 - Add an HDMI switch for monitor.
 - Swap out top 3 anemometers & geonor
 - Swap out net radiometers
 - update SS Met program for new radiometers
 - change snow transducers
 - 2x Solar panels: 320 W / 33V / 9.61 A