Difference between revisions of "Nh"
Jump to navigation
Jump to search
(No difference)
|
Latest revision as of 19:22, 31 July 2007
North Headwaters
site TODO list
- record as-built wiring of soil sensors
- Flex conduit as needed
site logs
14 July 2007, Ken I.
- installed used RM Young at 3m height