==Purpose:==
 
==Purpose:==
 
Spring station data download and creek measurement.
 
Spring station data download and creek measurement.
 +
 +
==Trip Summary and Loose Ends==
 +
* Teller Bottom Soil Moisture sensor need a bit of attention.  No SDI 12 action.
 +
* Buy and bring out a short step ladder for Teller Bottom CNR4
 +
* Teller IS2 charge controller doesn't look to be working (confirmed looking at March data download).
 +
===Nome Conex Instrument Inventory (May 2022 Edition)===
 +
* Left 2 HMP155s in Nome Conex
 +
* Left 1 SR50A in Nome Conex
 +
* Left 1 BP Sensor in Nome Conex
 +
* Left 2 anemometers in Nome Conext
 +
===Teller bottom 2022-05-20===
 +
* Problem files
 +
** Micromet110.dat
 +
** Mm112
 +
* Anemometer:
 +
** With yellow boat compass east /west line is at 294 magnetic. From east looking west at anemometer box
 +
===Teller SW===
 +
* Teller creek is probably highest observed discharge
 +
* Teller sw could use one serial cable
 +
 +
===Teller IS2 Snow===
 +
* Need a base plate for 4x4 to keep it from sinking further into muck.  That turns out to be the source/reason for the lean.
 +
* Limited Lean 5/22/22 by pounding in rebar with guy wire anchor.  Could use rebar cap from storage for it (or from Fairbanks)
 +
* Also on 5/22/22: Verified voltage of solar panel and battery.  Charge controller needs replacement
 +
 +
===Kougarok m64===
 +
* Looking east to west anemometer box is at 273 degrees magnetic
 +
* Snipped the pressure vent tube but thinking I should return with something more. Like pvc pipe going to ground so there is even less chance of clogging. Like could add the T sections of drill holes in pipe for venting
 +
 +
===Kg is5 snow ===
 +
* Battery box lid blew away. Otherwise good
 +
* Could use a sticky hook to hold serial cables up inside these boxes
 +
 +
===KG South Transect Snow===
 +
* All good here nothing to change.
 +
 +
===Teller 47===
 +
* Guy wire off again creek side
 +
* Anemometers
 +
** Lower anemometer at 275 magnetic pointing east to west
 +
** Upper at 270 magnetic pointing east to west
 +
* Baud rate on md485 set to 9600. I always forget so might need to adjust serial port speed before collecting here
 +
** Should really buy a couple of the rs232 cables for the cr6 cas sites
 +
* Screwed up program change last fall and recorded extreme high resolution snow depth here. Fixed that.  Downloaded data from microSD card.
 +
* Should look at pressure data here and compare to teller bottom.
 +
* There are flies in the vent and it should be replaced
 +
* Three battery setup lasted all winter.
 +
* Not much water in bucket but still dumped.
 +
* I think we have a baby oil in conex for fall 2022 geonor.
 +
 +
===Teller 47 Snow===
 +
* Vertical pipe bent a bit over the winter.
 +
 +
===Teller Top===
 +
* Was going to disconnect and reconnect wiring for HMP155 to see if the weak connection is not the sensor.
 +
** might also try leaving sensor turned on for longer in program (a to do for when CNR4 returns recalibrated)
 +
** Musk Ox within 50 meters of station prevented a visit.
 +
 +
===Snow Stand Improvements===
 +
* Shipped out in March parts to add a snow depth side diagonal support (just need to buy the pipe).
 +
** Teller 47 snow
 +
** KG-IS5 snow
 +
** Teller IS2 2x
 +
* Should also add back side guy wires to:
 +
** Teller IS2 2x
 +
** Teller 47 snow
 +
** KG-IS5 Snow 2x
  
 
==Safety Docs Submitted to Risk Management==
 
==Safety Docs Submitted to Risk Management==
Line 25: Line 92:
 
* 7:00 PM -- Arrive back in Nome
 
* 7:00 PM -- Arrive back in Nome
 
===Day 2 --- May 21 2022===
 
===Day 2 --- May 21 2022===
 +
* If road passable, drive to mile 64 site
 +
* Hike to sites and download data (expecting there to be snow some places)
 +
* (In March everything was working out here.)
 +
* Drive to end of road and download older sites via radio.
 +
* Replace pressure sensor at met station
 +
* Photos of anemometer
 +
* replace desiccant in CNR4 and relevel
 +
 +
===Day 3 --- May 22 2022===
 
* Drive to Teller 47 site
 
* Drive to Teller 47 site
 
** download data
 
** download data
Line 35: Line 111:
 
** download data
 
** download data
 
** HMP155 cable, try redoing the connections inside the instrument box.
 
** HMP155 cable, try redoing the connections inside the instrument box.
===Day 3 --- May 22 2022===
+
* If time, measure discharge again.
* If road passable, drive to mile 64 site
 
* Hike to sites and download data (expecting there to be snow some places)
 
* (In March everything was working out here.)
 
* Drive to end of road and download older sites via radio.
 
* Replace pressure sensor at met station
 
* Photos of anemometer
 
* replace desiccant in CNR4 and relevel
 
  
 
===Day 4 --- May 23 2022===
 
===Day 4 --- May 23 2022===
 
* Wrap up loose ends in town
 
* Wrap up loose ends in town
* Return home.
+
* Return home on morning flight

Latest revision as of 07:27, 25 May 2022

Purpose:

Spring station data download and creek measurement.

Trip Summary and Loose Ends

  • Teller Bottom Soil Moisture sensor need a bit of attention. No SDI 12 action.
  • Buy and bring out a short step ladder for Teller Bottom CNR4
  • Teller IS2 charge controller doesn't look to be working (confirmed looking at March data download).

Nome Conex Instrument Inventory (May 2022 Edition)

  • Left 2 HMP155s in Nome Conex
  • Left 1 SR50A in Nome Conex
  • Left 1 BP Sensor in Nome Conex
  • Left 2 anemometers in Nome Conext

Teller bottom 2022-05-20

  • Problem files
    • Micromet110.dat
    • Mm112
  • Anemometer:
    • With yellow boat compass east /west line is at 294 magnetic. From east looking west at anemometer box

Teller SW

  • Teller creek is probably highest observed discharge
  • Teller sw could use one serial cable

Teller IS2 Snow

  • Need a base plate for 4x4 to keep it from sinking further into muck. That turns out to be the source/reason for the lean.
  • Limited Lean 5/22/22 by pounding in rebar with guy wire anchor. Could use rebar cap from storage for it (or from Fairbanks)
  • Also on 5/22/22: Verified voltage of solar panel and battery. Charge controller needs replacement

Kougarok m64

  • Looking east to west anemometer box is at 273 degrees magnetic
  • Snipped the pressure vent tube but thinking I should return with something more. Like pvc pipe going to ground so there is even less chance of clogging. Like could add the T sections of drill holes in pipe for venting

Kg is5 snow

  • Battery box lid blew away. Otherwise good
  • Could use a sticky hook to hold serial cables up inside these boxes

KG South Transect Snow

  • All good here nothing to change.

Teller 47

  • Guy wire off again creek side
  • Anemometers
    • Lower anemometer at 275 magnetic pointing east to west
    • Upper at 270 magnetic pointing east to west
  • Baud rate on md485 set to 9600. I always forget so might need to adjust serial port speed before collecting here
    • Should really buy a couple of the rs232 cables for the cr6 cas sites
  • Screwed up program change last fall and recorded extreme high resolution snow depth here. Fixed that. Downloaded data from microSD card.
  • Should look at pressure data here and compare to teller bottom.
  • There are flies in the vent and it should be replaced
  • Three battery setup lasted all winter.
  • Not much water in bucket but still dumped.
  • I think we have a baby oil in conex for fall 2022 geonor.

Teller 47 Snow

  • Vertical pipe bent a bit over the winter.

Teller Top

  • Was going to disconnect and reconnect wiring for HMP155 to see if the weak connection is not the sensor.
    • might also try leaving sensor turned on for longer in program (a to do for when CNR4 returns recalibrated)
    • Musk Ox within 50 meters of station prevented a visit.

Snow Stand Improvements

  • Shipped out in March parts to add a snow depth side diagonal support (just need to buy the pipe).
    • Teller 47 snow
    • KG-IS5 snow
    • Teller IS2 2x
  • Should also add back side guy wires to:
    • Teller IS2 2x
    • Teller 47 snow
    • KG-IS5 Snow 2x

Safety Docs Submitted to Risk Management

  • 4/28/2022
  • Approved: 5/11/2022

Proposed Itinerary

Day 1 --- May 20 2022

  • Fly in around Noon.
  • Pick up Truck.
  • Drive to Teller 27
    • Gage the Creek
    • Download data from all sites at bottom
    • Replace radiometer at Teller Bottom
    • Fix anything broken
      • We won't fix the mast at IS2 snow site but might take it down?
        • Consider bringing a saw to cut it.
        • Look at snow depths and pictures and then put a shorter mast in its place come fall?
  • 1:30 PM -- on the road for Teller 27
  • 2:30 PM -- arrive
  • 3:00 PM -- arrive at the bottom.
  • 6:00 PM -- Finish for the day
  • 7:00 PM -- Arrive back in Nome

Day 2 --- May 21 2022

  • If road passable, drive to mile 64 site
  • Hike to sites and download data (expecting there to be snow some places)
  • (In March everything was working out here.)
  • Drive to end of road and download older sites via radio.
  • Replace pressure sensor at met station
  • Photos of anemometer
  • replace desiccant in CNR4 and relevel

Day 3 --- May 22 2022

  • Drive to Teller 47 site
    • download data
    • dump precip bucket
      • need baby oil
    • level radiometer
    • check anemometer for true north
    • (ordered a replacement SR50A for the willows site. Will need to deploy in 2022)
  • Drive to teller top
    • download data
    • HMP155 cable, try redoing the connections inside the instrument box.
  • If time, measure discharge again.

Day 4 --- May 23 2022

  • Wrap up loose ends in town
  • Return home on morning flight