Difference between revisions of "2022 NGEE Nome August Trip"
Jump to navigation
Jump to search
(Created page with "== Activities == * Download Kougarok end of road sites by radio / visit. * If time allows (doubtful) discharge measurement @ Teller ===Kougarok Met=== * Replace desiccant in...") |
|||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | ==Recap== | ||
+ | ===K1 Burn=== | ||
+ | * Both AT/RH dead again | ||
+ | * WS/WD still functioning | ||
+ | |||
+ | ===K2 Met=== | ||
+ | * Precip bucket still level from last year | ||
+ | * Everything else remaining looks to be working (of met instruments) | ||
+ | ** Oh, 1m WS bearings render it nonfunctional. | ||
+ | * Leveled radiometers but did it without needing to adjust the tower. | ||
+ | ** Changed desiccant | ||
+ | * old sr50A still good | ||
+ | * Might be some significant clock drift. | ||
+ | |||
+ | ===K3 Mauze Gulch=== | ||
+ | * AT/RH still working | ||
+ | * Snow depth still working | ||
+ | |||
+ | ===NGEE m64 met=== | ||
+ | * Replace AT/RH | ||
+ | * Replace SR50A | ||
+ | * Replace Barometric Pressure & secure vent tube | ||
+ | |||
+ | ===NGEE m64 IS5 snow site=== | ||
+ | * Need to bring out a bit more 3/16" wire rope and an anchor | ||
+ | ** and sledge... | ||
+ | |||
+ | ===NGEE m64 trans9 snow site=== | ||
+ | * All good at this one. | ||
+ | |||
+ | ===Teller SW=== | ||
+ | * Could use one more serial cable here. | ||
+ | * Still need to change out desiccant | ||
+ | * Discharge reading (tentatively looked good for lower flow) | ||
+ | |||
+ | ===Teller Bottom=== | ||
+ | * Lower SW radiation is intermittently erorring. Bring out a replacement cable. | ||
+ | * Precip bucket was knocked by moose again but only slightly off level. | ||
+ | * Still need to do program change. | ||
+ | |||
+ | ===Teller IS2 Snow=== | ||
+ | * Station had tipped over. | ||
+ | * Still need to replace the 10ft top pole | ||
+ | * Need 3/16" wire rope here, too. | ||
+ | * Need screed stake and another anchor to prevent another tip | ||
+ | * The data logger got soaked over summer and will need replacement | ||
+ | * The charge controller still needs replacement (still need to grab from Fairbanks) | ||
+ | |||
+ | ===Nome NW Campus Base station=== | ||
+ | * Checked on base. Radio antenna and coax outside the building still looks good | ||
+ | * Conex still not moved. | ||
+ | |||
+ | ===Left in storage for next trip=== | ||
+ | * 2 AT/RH cables for Teller Top | ||
+ | * 1 pressure sensor for ngee m64 met | ||
+ | * A bunch of cable protection for the snow sites | ||
+ | * fresh desiccant for teller sw | ||
+ | * sr50a transducers | ||
+ | * 16pcs 3/16" cable clamps | ||
+ | * 3 (I think) AT/RH sensors | ||
+ | * 1 SR50A for teller 47. | ||
+ | |||
+ | |||
+ | ==At Storage== | ||
+ | * Pepper Spray | ||
+ | * Tent | ||
+ | * '''Radio setup''' | ||
+ | * Discharge gear | ||
+ | * Look for tipping bucket replacement for Teller Bottom | ||
+ | * | ||
+ | |||
== Activities == | == Activities == | ||
* Download Kougarok end of road sites by radio / visit. | * Download Kougarok end of road sites by radio / visit. | ||
− | * | + | * Support Go with thaw depths and GPS survey |
+ | |||
+ | ===Teller 27 Site=== | ||
+ | * Discharge measurement @ Teller m27 creek | ||
+ | * Inspect the sites here for how to fix animal damage | ||
+ | ** Teller IS2 | ||
+ | ** Teller Bottom | ||
===Kougarok Met=== | ===Kougarok Met=== | ||
+ | |||
* Replace desiccant in Radiometers | * Replace desiccant in Radiometers | ||
+ | ** Torpedo Level | ||
+ | ** CSI phillips screwdriver | ||
+ | ** multitool | ||
+ | ** stubby phillips screwdriver | ||
+ | ** 5/16" and 1/4" nut drivers & wrenches ( | ||
+ | * Guy wire tighten | ||
+ | ** 5/16" nut driver I think | ||
+ | * Level Precip | ||
+ | ** Torpedo level | ||
+ | |||
+ | * Download Data | ||
+ | ** Sc32B and serial cable | ||
+ | ** bring spare CR10X in case there are more hardware problems | ||
==To Ship== | ==To Ship== | ||
* Desiccant | * Desiccant | ||
* SR50A transducers? | * SR50A transducers? | ||
+ | * Spare CR10Xs |
Latest revision as of 07:57, 12 September 2022
Contents
Recap
K1 Burn
- Both AT/RH dead again
- WS/WD still functioning
K2 Met
- Precip bucket still level from last year
- Everything else remaining looks to be working (of met instruments)
- Oh, 1m WS bearings render it nonfunctional.
- Leveled radiometers but did it without needing to adjust the tower.
- Changed desiccant
- old sr50A still good
- Might be some significant clock drift.
K3 Mauze Gulch
- AT/RH still working
- Snow depth still working
NGEE m64 met
- Replace AT/RH
- Replace SR50A
- Replace Barometric Pressure & secure vent tube
NGEE m64 IS5 snow site
- Need to bring out a bit more 3/16" wire rope and an anchor
- and sledge...
NGEE m64 trans9 snow site
- All good at this one.
Teller SW
- Could use one more serial cable here.
- Still need to change out desiccant
- Discharge reading (tentatively looked good for lower flow)
Teller Bottom
- Lower SW radiation is intermittently erorring. Bring out a replacement cable.
- Precip bucket was knocked by moose again but only slightly off level.
- Still need to do program change.
Teller IS2 Snow
- Station had tipped over.
- Still need to replace the 10ft top pole
- Need 3/16" wire rope here, too.
- Need screed stake and another anchor to prevent another tip
- The data logger got soaked over summer and will need replacement
- The charge controller still needs replacement (still need to grab from Fairbanks)
Nome NW Campus Base station
- Checked on base. Radio antenna and coax outside the building still looks good
- Conex still not moved.
Left in storage for next trip
- 2 AT/RH cables for Teller Top
- 1 pressure sensor for ngee m64 met
- A bunch of cable protection for the snow sites
- fresh desiccant for teller sw
- sr50a transducers
- 16pcs 3/16" cable clamps
- 3 (I think) AT/RH sensors
- 1 SR50A for teller 47.
At Storage
- Pepper Spray
- Tent
- Radio setup
- Discharge gear
- Look for tipping bucket replacement for Teller Bottom
Activities
- Download Kougarok end of road sites by radio / visit.
- Support Go with thaw depths and GPS survey
Teller 27 Site
- Discharge measurement @ Teller m27 creek
- Inspect the sites here for how to fix animal damage
- Teller IS2
- Teller Bottom
Kougarok Met
- Replace desiccant in Radiometers
- Torpedo Level
- CSI phillips screwdriver
- multitool
- stubby phillips screwdriver
- 5/16" and 1/4" nut drivers & wrenches (
- Guy wire tighten
- 5/16" nut driver I think
- Level Precip
- Torpedo level
- Download Data
- Sc32B and serial cable
- bring spare CR10X in case there are more hardware problems
To Ship
- Desiccant
- SR50A transducers?
- Spare CR10Xs