Difference between revisions of "SS To Do Next Visit"
Jump to navigation
Jump to search
(→2022) |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
===2022=== | ===2022=== | ||
+ | ====Mid September Visit Notes==== | ||
+ | * Sent program to SWE data logger | ||
+ | ** CS616 Soil Moisture connected | ||
+ | ** Laser Snow Depth connected | ||
+ | ** CS725 SWE Connected | ||
+ | * Leveled Geonor | ||
+ | * Changed fluids in geonor | ||
+ | * Replaced air blower for forest floor at/rh | ||
+ | |||
+ | * Leveled CNR4s | ||
+ | * Lableled network devices connected to switches | ||
+ | * | ||
====To Buy==== | ====To Buy==== | ||
* XX Need to buy three more CS650s for fall soil pit. | * XX Need to buy three more CS650s for fall soil pit. | ||
Line 23: | Line 35: | ||
* --> Buy three more cameras | * --> Buy three more cameras | ||
* Need 4 PoE converters. | * Need 4 PoE converters. | ||
+ | * 24V system for air blowers | ||
− | ==== | + | ====September List==== |
+ | * change out the fluids in the geonor | ||
+ | * final program to the new data logger and configure it using Go's soil info | ||
+ | * Replace camera on top of tower with a smaller waterproof model. | ||
* Look at SS_TT_RAD clock / replace logger. | * Look at SS_TT_RAD clock / replace logger. | ||
− | |||
− | |||
− | |||
* Look at Soil Soil Moisture @ 30cmbgs. It's cutting out on high moisture values. | * Look at Soil Soil Moisture @ 30cmbgs. It's cutting out on high moisture values. | ||
− | * | + | * Look at shed anchor closer |
+ | |||
+ | ====July List==== | ||
* upgrade battery system for some of the data loggers with the power over ethernet equipment | * upgrade battery system for some of the data loggers with the power over ethernet equipment | ||
− | |||
* Send SmartFlux2 and LI7200 RS back to Licor | * Send SmartFlux2 and LI7200 RS back to Licor | ||
+ | ** Emailed for RMA# | ||
* modify config files on ocotal for new precip sensor on geonor logger. | * modify config files on ocotal for new precip sensor on geonor logger. | ||
Line 40: | Line 55: | ||
** bring out oil / grease for clamps | ** bring out oil / grease for clamps | ||
− | |||
* move batteries around | * move batteries around | ||
− | |||
− | |||
− | |||
+ | * XX program and test radios | ||
+ | * XX Swap NL200 for NL100 and get network going again | ||
+ | * XX Test radio connection to SS_SWE | ||
* XX Electrician | * XX Electrician | ||
* XX change half anemometers | * XX change half anemometers | ||
Line 64: | Line 78: | ||
* XX For subcanopy site, find another data cable to go between the Pumping module and the 7550 box so that the air pump can be logged as on in the data stream. | * XX For subcanopy site, find another data cable to go between the Pumping module and the 7550 box so that the air pump can be logged as on in the data stream. | ||
* XX chop geonor plywood | * XX chop geonor plywood | ||
+ | * XX SWE sensor move | ||
+ | ** XX Refresh brain on manual | ||
+ | * XX Configure radios | ||
* XX What should we do about the clock offset | * XX What should we do about the clock offset | ||
corascript | corascript |
Latest revision as of 14:51, 16 September 2022
Contents
Informative Links
- http://monitors.iarc.uaf.edu/data/cameras/
- https://docs.google.com/spreadsheets/d/1uDCLZxSEQnAm7JUWovtmEf8gx1xbKkIPxmSorJztOcQ/edit#gid=0
- Super Site Instrumentation Calendar
Calibrations Swaps 2021
- Forest Floor RS485 HMP155:
- 7/29/21 Removed P3520500
- Replaced with G4940001
Publications List
Sensor Refresh Budget
2022
Mid September Visit Notes
- Sent program to SWE data logger
- CS616 Soil Moisture connected
- Laser Snow Depth connected
- CS725 SWE Connected
- Leveled Geonor
- Changed fluids in geonor
- Replaced air blower for forest floor at/rh
- Leveled CNR4s
- Lableled network devices connected to switches
To Buy
- XX Need to buy three more CS650s for fall soil pit.
- 12v batteries
- --> 9x POE to 12V battery hardware
- Send for recalibration LI7200RS-0109
- Send SmartFlux2 away for fixing
- XX Submit PRs for this.
- --> Buy three more cameras
- Need 4 PoE converters.
- 24V system for air blowers
September List
- change out the fluids in the geonor
- final program to the new data logger and configure it using Go's soil info
- Replace camera on top of tower with a smaller waterproof model.
- Look at SS_TT_RAD clock / replace logger.
- Look at Soil Soil Moisture @ 30cmbgs. It's cutting out on high moisture values.
- Look at shed anchor closer
July List
- upgrade battery system for some of the data loggers with the power over ethernet equipment
- Send SmartFlux2 and LI7200 RS back to Licor
- Emailed for RMA#
- modify config files on ocotal for new precip sensor on geonor logger.
- think on more supports for geonor?
- added c clamps
- bring out oil / grease for clamps
- move batteries around
- XX program and test radios
- XX Swap NL200 for NL100 and get network going again
- XX Test radio connection to SS_SWE
- XX Electrician
- XX change half anemometers
- XX unpack and organize the super site stuff that used to be in my office
- XX Subcanopy Gill windmaster
- XX replace a couple AT/RH sensors
- XX level the geonor
- XX camera work
- XX Chat about next year.
- XX Full Tour of super site computers and data loggers
- XX Install new tipping bucket
- XX Program change for... SS Geonor
- XX read manual on how the heating part works
- XX Level radiometer
- XX Better secure leaf wetness sensor to it's thing
- XX For subcanopy site, find another data cable to go between the Pumping module and the 7550 box so that the air pump can be logged as on in the data stream.
- XX chop geonor plywood
- XX SWE sensor move
- XX Refresh brain on manual
- XX Configure radios
- XX What should we do about the clock offset
corascript clock-check device-name clock-set device-name clock-check SS_TT_Rad;
bob@sslognet3:/var/site/bin/cora$ /opt/CampbellSci/LoggerNet/cora_cmd CoraScript 1, 19, 02 connect localhost; +connect,"coralib3.dll version 1, 13, 05" clock-check SS_TT_Rad; *clock-check { "2022-07-26 21:46:06.780",57599115 } +clock-check,clock checked clock-set SS_TT_Rad; *clock-set { "2022-07-26 21:46:46.710",57599428 } +clock-set,clock set clock-check SS_TT_Rad; *clock-check { "2022-07-27 13:48:04.180",10 } +clock-check,clock checked exit; bob@sslognet3:/var/site/bin/cora$
SWE sensor move
- Station is moved.
- Grab Laser Snow Depth from Super Site proper
- program
- 24hr test
To Find Supplies in storage
- XX Instrument box
- XX Brackets for install
- XX Power supply
- Battery backup?
- Radio
- Coax
- Antenna
- XX Look at tower camera logging
New Tipping Bucket
- Need two 90* cross arm fittings
- Three sections of pipe cut to length
- May need electricity...
Subcanopy Gill windmaster
- email to see if we can retrofit to add analog
- dig out the analog box I got at some point to see if it can be used.
To Purchase for all of these
- Coax
- Antenna
- Extension Cord
- Dig out or buy three screed stakes
- three of the smaller hose clamps ( I think I can find them )
2021
- Check clocks
- Bring out a gender changer for null modem plus a serial cable or two.
- Turn MD485 & NL201 for original data loggers into a NL100 w/ RS485 output.
- Presentation outlining all Electrical plug ins and what is plugged into them.
- XX Updated the network so it will work all of the time with or without LAN.
- Need to update Licor Software
- Update the windows, too?
- Identify power needs
- Submitted a PR for the power monitor.
- Map out all network devices
- Shoud grab pictures too.
- Found alternate location near gate for SWE sensor.
- Update Kathe on what is out here including estimated costs
- Bring an HDMI splitter so both laptops can share the screen.
- XX bring out the third small router so that the networking is more resilient.
- build a tripod for the cameras?
- Pick up all thread stock that will fit inside the large thimbles I have.
- XX 6/3 Tower Top Radiometer bracket needs two more screws... old ones sheared off.
- need to bring out a 1/2 inch nut for one anchor. 5/16" diameter... For North side
- XX Location for SWE sensor
- 6/3/2021: Snow pillow spot has 4-5m diameter space.
- XX Make sure we can make the two tripods.
- XX Yes
- Check 6m AT/RH wiring.
- I think we replaced it in March 2021 but it is still acting up so likely to be a cabling issue again.
- have a cable just need to solder into a single piece. (where did this cable go...)
- Send away anemometers
- send away HMP155s
- check calibration budget
- XX try to buy CFM100s for soil and met loggers
- XX Redo the forests floor AT/RH bracket.
- complete inventory of gear in the office
- XX copy down again the pakbus IDs to the wiki here...
Program Change
- XX change ss_soil soil moisture to period averaging method to reduce overranging
- XX add leaf wetness sensor to geonor again?
- XX change sdi12 instruction for ss_ff_rad snow to output quality number... looks to be zero.
- Check ss_soil_2 datapro config for soil temp 4 which shows good data while connected to station but nan on webpage.
May 2021 Datapro remainder Items
- ss_geonor -- need to add charger key file etc
- ss_soil_2 -- need to add sm_profile.dat and snow.dat to automated processing.
- ss_ff_rad -- need to add snow to automated processing.
To Purchase
- For SWE tripods:
- 1 Inch Schedule 40 pipe, 10ft, 6pcs (leg / leg brace)
- 1.5 inch schedule 40 pipe, 10 ft, 2 pcs (mast)
- phenocam parts... 2" pvc maybe plus rubber gasket and what else?
2019
- bring out MD485 to tie in to network out there
May 2019
- check sr50a #2 maybe not working according to data.
2018
Fall List
- Photograph tag & equipment for:
- LICOR units (tower & forest)
- Property Tag 36113 (I think this may be Y Kim)
- Property Tag 36114 (I think this may be Y Kim)
- 3 CR1000s
- Property Tag 36104
- Property Tag 36106
- Property Tag 36117
- LICOR units (tower & forest)
- Might add a SR50A to the soil pit
- might add a SI111 to the soil pit
- might add a UPS for the heat flux logger system in case there are power problems
- the network switch connecting the toughbook to the LI7200 and the LI7200 to the fluxprocessor
- Need to find out OS version of tower wind master pro
- need to remove battery from sky cam laptop
- bring out NL100/200.
- error message associated with heat flux memory card... replace memory card.
- order a LiCor network cable for forest floor.
Summer List
- More PAR sensors and hardware for in-situ
- Polish Battery Backup System
- replace Loggernet computer
- bring out an NL100 or USB to serial adapter
- Submit PRs for Summer 2018 Instrument Recalibrations
- Vaisala HMP155s
- MetOne 010C
- Kipp & Zonen CNR4
- Late Fall recalibrations:
- LI-7200s
Ss soil has room on c5 for sdi12 rest or sr50a are on c3, c4 is open for other stuff.
- C5 -- SDI12 ID 8 = Shed
- C7 -- SDI12 ID 9 = Forest Floor Radiation Stand
Just moved cs616 to 5v to see if that does anything. Need to confirm this doesn't mess up and create noise in signals.
- Replace SR50A transducers
- Dig second pit for soil instruments
- clean up outdoor power cords
- waterproof a bit some of the tower blowers (might be as easy as more cable ties / tape to keep the white box deals right side up.
- I brought out a collection of one and two hole deals for securing loose cabling here and there in and out of the shed. That could be sorted out.
- connect those shop power strips and get one more for inside?
- buy and add more PAR top and bottom (4x and matching hardware)
- add another tipping bucket.
- bring solder out for ff atrh blower and electrical goo