== Day 1, 2, 3 Shaviovik, U1, Kadleroshilik River, Bullen DBM8, Lower Kad DBM7 helicopter sites (begin flying evening of Sept 2 or morning of Sept 3==
+
== Day 1, 2, 3 (Sept 3-5) Shaviovik, U1, Kadleroshilik River, Bullen DBM8, Lower Kad DBM7 helicopter sites (begin flying evening of Sept 2 or morning of Sept 3==
 
1.  [[Shaviovik River | Shaviovik R]]:  
 
1.  [[Shaviovik River | Shaviovik R]]:  
 
* move PTs into water as needed  
 
* move PTs into water as needed  
Line 29: Line 29:
 
* Install 6' rebar for new and better TBM (install to 5' deep?)
 
* Install 6' rebar for new and better TBM (install to 5' deep?)
 
* Discharge Measurement (rio grande or SP / kayak)
 
* Discharge Measurement (rio grande or SP / kayak)
 +
* Download a reformat (delete) SD card photos
  
 
2. [[No Name River U1| U1 Cr]:   
 
2. [[No Name River U1| U1 Cr]:   
Line 36: Line 37:
 
* Install 6' rebar for new and better TBM (install to 5' deep?)
 
* Install 6' rebar for new and better TBM (install to 5' deep?)
 
* Discharge Measurement (stream pro or ADP flow tracker)
 
* Discharge Measurement (stream pro or ADP flow tracker)
 +
* Download a reformat (delete) SD card photos
  
 
3. [[Kadleroshilik River| Kadleroshilik R]]:  
 
3. [[Kadleroshilik River| Kadleroshilik R]]:  
Line 44: Line 46:
 
* Install 6' rebar for new and better TBM (install to 5' deep?)
 
* Install 6' rebar for new and better TBM (install to 5' deep?)
 
* Discharge Measurement (stream pro or ADP flow tracker)
 
* Discharge Measurement (stream pro or ADP flow tracker)
 +
* Download a reformat (delete) SD card photos
  
 
4. [[dbm7| DBM7 Kadleroshilik Met]]
 
4. [[dbm7| DBM7 Kadleroshilik Met]]
Line 54: Line 57:
  
  
 
+
== Day 4, 5, 6 (Sept 6-8) Anaktuvuk River, Itkillik River, Chandler River helicopter sites ==
== Day 4 (Anaktuvuk River, Itkillik River, Chandler River) helicopter sites ==
 
  
 
7.  [[Chandler R| Chandler R]]
 
7.  [[Chandler R| Chandler R]]
Line 67: Line 69:
 
* Check battery box therm
 
* Check battery box therm
 
* turn one camera to a different direction
 
* turn one camera to a different direction
 +
* Download a reformat (delete) SD card photos
  
 
8. [[Itikillik R| Itkillik R]]
 
8. [[Itikillik R| Itkillik R]]
Line 76: Line 79:
 
* Move/secure PTs
 
* Move/secure PTs
 
* Install 6' rebar for new and better TBM (install to 5' deep?)
 
* Install 6' rebar for new and better TBM (install to 5' deep?)
 +
* Download a reformat (delete) SD card photos
  
 
9.  [[Anaktuvuk R| Anaktuvuk R]]
 
9.  [[Anaktuvuk R| Anaktuvuk R]]
* Discharge msmst (Rio grande or SP / kayak)
+
* Discharge msmst (Rio grande or SP / kayak) (stream team)
* Water level surveys
+
* Water level surveys (stream team)
* move PTs into water as needed
+
* move PTs into water as needed (stream team)
* Move/secure PTs
+
* Move/secure PTs(stream team)
* Install 6' rebar for new and better TBM (install to 5' deep?)
+
* Install 6' rebar for new and better TBM (install to 5' deep?) (stream team)
 
+
* Add bark chips and snow depth height needs to be entered into the data logger (met team Sept 9-12)
 
+
* RH had some problems ~May 29.  It looks ok now, but may want to check (met teamSept 9-12)
 
+
* Install subsurface soil moisture and temp thermistors (met team Sept 9-12)
 +
* Download a reformat (delete) SD card photos
  
  
 +
Days 7, 8, 9 (Sept 9-12) Umiat Project Met Station installation -- GWS
  
 +
10.  [Itikmalakpak| Itikmalakpak DUM1]
 +
* Download data and upgrade logger to v. 17
 +
* Download a reformat (delete) SD card photos
 +
* Install bark chips as needed and check snow sensor height
 +
* Install subsurface soil moisture and temp thermistors
  
  

Revision as of 12:51, 10 August 2009

This is a to do list detailing work to be done on the Sept 2-13 field trip. Stream Team (Ken, Emily, Horacio/Bill, Rob) Sept 2-9 or so working out of Prudhoe first, then moving to Toolik. Met Team (Mike L., Jeff D., 3rd person) Sept 9-13 or so working out of Toolik.

  • Remember to make reservations at Toolik (& bring your own sleeping bag/sheets/blankets/pillow).
  • Remember to get rooms in Deadhorse.
  • Bill or Horacio arrive Sept 3?
  • Bring additional fenceposts/e-fence wire/hardware
  • Bring SR50 transducer for replacements (change out at all stations on Coastal Plain)
  • Remove Bullen/Foothills net rad sensors for recalibration (every two years)
  • Bring spare rain grates (US and metric). Check all rain gauges and record in notes whether US or metric gauge.
  • Bring a bunch of black campbell SC12 2 peripheral cables (or whatever they are) to leave at new stations/repeaters, they were missing at Itikmalakpak & May Creek.
  • Secure Gieck Base to ground with deep rebar in non-rocky areas. (this may or may not have been done at some stations already)
  • Apparently some of the tilt down tripods were installed so that they could not be tilted down due to the solar panel being in the way. If time permits, this could be fixed, we use this feature often.
  • Note that the program file names are TOO LONG making it impossible to figure out which program is running and impossible to select the correct program to edit. Ken please fix this and the other problems in the programs so we can reload via radio them right before the fall trip (and notice if there are other problems, then at least we can fix during the site visit).
  • Bark chips should be added where needed. We should have some up at Toolik but I didn't notice them on the last trip (but I wasn't looking).
  • Load updated firmware to datalogger (v. 17)


Day 0, Drive to Deadhorse (Sept 1/2)

Day 1, 2, 3 (Sept 3-5) Shaviovik, U1, Kadleroshilik River, Bullen DBM8, Lower Kad DBM7 helicopter sites (begin flying evening of Sept 2 or morning of Sept 3

1. Shaviovik R:

  • move PTs into water as needed
  • Water Level Survey
  • Move/secure PTs
  • Install 6' rebar for new and better TBM (install to 5' deep?)
  • Discharge Measurement (rio grande or SP / kayak)
  • Download a reformat (delete) SD card photos

2. [[No Name River U1| U1 Cr]:

  • move PTs into water as needed
  • Water Level Survey
  • Move/secure PTs
  • Install 6' rebar for new and better TBM (install to 5' deep?)
  • Discharge Measurement (stream pro or ADP flow tracker)
  • Download a reformat (delete) SD card photos

3. Kadleroshilik R:

  • move PTs into water as needed
  • remove HOBO and download data
  • Water Level Survey
  • Move/secure PTs
  • Install 6' rebar for new and better TBM (install to 5' deep?)
  • Discharge Measurement (stream pro or ADP flow tracker)
  • Download a reformat (delete) SD card photos

4. DBM7 Kadleroshilik Met

  • Possibly move portion of station due to cut bank erosion.
  • Replace SR50. Measure old distance to ground and then measure new dist. after installation.
  • GWS YSI Air T Thermistor #1 is bad

5. DBM8 Bullen Met

  • Replace SR50. Measure old distance to ground and then measure new dist. after installation.


Day 4, 5, 6 (Sept 6-8) Anaktuvuk River, Itkillik River, Chandler River helicopter sites

7. Chandler R

  • remove HOBO and download data
  • move PTs into water as needed
  • air temp backup (ATB?) not working?
  • soil surface temp not working
  • Water level surveys
  • Move/secure PTs
  • Install 6' rebar for new and better TBM (install to 5' deep?)
  • Check battery box therm
  • turn one camera to a different direction
  • Download a reformat (delete) SD card photos

8. Itkillik R

  • turn one camera to a different direction
  • air temp backup (ATB?) not working?
  • soil surface temp not working
  • move higher PT into water
  • Water level surveys
  • Move/secure PTs
  • Install 6' rebar for new and better TBM (install to 5' deep?)
  • Download a reformat (delete) SD card photos

9. Anaktuvuk R

  • Discharge msmst (Rio grande or SP / kayak) (stream team)
  • Water level surveys (stream team)
  • move PTs into water as needed (stream team)
  • Move/secure PTs(stream team)
  • Install 6' rebar for new and better TBM (install to 5' deep?) (stream team)
  • Add bark chips and snow depth height needs to be entered into the data logger (met team Sept 9-12)
  • RH had some problems ~May 29. It looks ok now, but may want to check (met teamSept 9-12)
  • Install subsurface soil moisture and temp thermistors (met team Sept 9-12)
  • Download a reformat (delete) SD card photos


Days 7, 8, 9 (Sept 9-12) Umiat Project Met Station installation -- GWS

10. [Itikmalakpak| Itikmalakpak DUM1]

  • Download data and upgrade logger to v. 17
  • Download a reformat (delete) SD card photos
  • Install bark chips as needed and check snow sensor height
  • Install subsurface soil moisture and temp thermistors



Other TO DO things helicopter related

6. DBM3 Juniper Met DBM3:

  • Replace rain gage mesh

8. DBM4 Sag-Ivi Met DBM4:

  • Check E-Fence

13. DBM1 Accomplishment Cr Met

  • Replace rain gage mesh