Difference between revisions of "2009 September Nome Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 3: Line 3:
 
===Pre-trip to do===
 
===Pre-trip to do===
 
* Talk to Phil Taylor  
 
* Talk to Phil Taylor  
* Figure out SDI-Recorder / SDI-Sensor operation
+
* Figure out SDI-Recorder / SDI-Sensor operation (addressed)
 
* Try to replicate the precip bucket problem on Blueberry
 
* Try to replicate the precip bucket problem on Blueberry
  
Line 58: Line 58:
 
* Leave Radio in ON position
 
* Leave Radio in ON position
 
* Pull Net Radiometer
 
* Pull Net Radiometer
 +
 
===Potential Itinerary===
 
===Potential Itinerary===
Friday 9/25/2009
+
Wednesday 9/23/09 Sunset @ 20:57 Twilight @ 21:45
  + 9am Depart Fairbanks for Nome
+
+ Bob departs Fairbanks for Nome
 +
+ Rent Truck & get luggage
 +
+ Visit Storage and get stuff for C1
 +
+ Run out to Council
 +
+ Visit C1
 +
+ Visit Skookum
 +
 
 +
Thursday 9/24/2009 Sunset @ 20:54 Twilight @ 21:42
 +
  + 9am Chas Departs Fairbanks for Nome
 
  + 12:40pm Arrive in Nome
 
  + 12:40pm Arrive in Nome
  + Rent Truck & get luggage
+
  + Before Chas' Arrival:
+ Eat Lunch and then Get food for 5 days at the store
+
  o Bob Gets Groceries for the trip
+ Run by storage and pick up stuff for Kougarok
+
  o Visit Anvil and do maintenance there
  + Visit Anvil and do maintenance there
+
  o Run by storage and pick up stuff for Kougarok  
  + Head out to Kougarok  
+
  + Grab Lunch
 +
  + 2:00 Head out towards Kougarok
 +
+ 3:00 arrive at Kigluaiks pullout
 +
+ 4:30 arrive at kig 1
 +
+ Kigluaiks 1
 +
  * Leave Radio in ON position
 +
+ Kigluaiks 2
 +
  * Leave Radio in ON position
 +
  * Replace Antenna
 +
  * Get Anemometer working
 +
+ drive to Kougarok
  
Saturday 9/26/2009
+
Friday 9/25/2009 Sunset @ 20:50 Twilight @ 21:38
 
  + Site Visit to K1
 
  + Site Visit to K1
+ Site Visit to K2
+
  + Site Visit to K3  
 
 
Sunday 9/27/2009
 
  + Site Visit to K3
 
+ Drive back to the Kigluaiks
 
+ Site Visit to Kig 1 & Kig 2
 
+ Stay in the Hotel in Nome
 
  
Monday 9/28/2009
+
Sunday 9/27/2009 Sunset @ 20:46 Twilight @ 21:34
 +
+ Site Visit to K2
 
  + Grab Canoe and head to Council
 
  + Grab Canoe and head to Council
  + Visit C1
+
  + Hotel in Nome
+ Visit C2
 
+ Visit Skookum
 
+ Return to Hotel
 
  
Tuesday 9/29/2009
+
Monday 9/28/2009 Sunset @ 20:43 Twilight @ 21:31
 
  + Return to Fairbanks on afternoon flight.
 
  + Return to Fairbanks on afternoon flight.

Revision as of 16:56, 13 September 2009

For Starters, the to do list:

Pre-trip to do

  • Talk to Phil Taylor
  • Figure out SDI-Recorder / SDI-Sensor operation (addressed)
  • Try to replicate the precip bucket problem on Blueberry

Station by Station to do

C1 Grid

  • Pull Net Radiometer
  • Replace HMP45C sensor heads
  • Leave Radio in ON position

C2 Blueberry

  • Install new Anemometer (propeller is onsite)
  • Figure out the deal with the precipitation
  • Replace HMP45C sensor heads @ 1m, 3m
  • Replace new antenna with original antenna
  • Leave Radio in ON position
  • Replace Judd sensor & seal with Silicone
  • Drop off Net Radiometer mounting hardware

Skookum

  • Replace HMP45C sensor head
  • Look over Antenna & Coax
  • Leave Radio in ON position

Anvil

  • Resolve Anemometer Issue
  • Replace HMP45C sensor head
  • Leave Radio in ON position

Kigluaiks 1

  • Leave Radio in ON position

Kigluaiks 2

  • Leave Radio in ON position
  • Replace Antenna
  • Get Anemometer working

K1 Burn

  • Replace HMP45C cable @ 3m
  • Bring out new HMP45C Sensor Head
  • Bring out Precip Bucket Lid
  • Bring out Thermocouple wire to hook up Multiplexer
  • Bring out rebar to pound in for thermocouple pole to attach
  • Bring out hammer to pound rebar with
  • Download Data

K2 Met

  • Seal Judd with Silicone
  • Hook up second logger as SDI Sensor
  • Replace HMP45C sensor heads at 1m, 3m, and 10m


K3 Mauze

  • Leave Radio in ON position
  • Pull Net Radiometer

Potential Itinerary

Wednesday 9/23/09 Sunset @ 20:57 Twilight @ 21:45

+ Bob departs Fairbanks for Nome
+ Rent Truck & get luggage
+ Visit Storage and get stuff for C1
+ Run out to Council
+ Visit C1
+ Visit Skookum

Thursday 9/24/2009 Sunset @ 20:54 Twilight @ 21:42

+ 9am Chas Departs Fairbanks for Nome
+ 12:40pm Arrive in Nome
+ Before Chas' Arrival:
  o Bob Gets Groceries for the trip
  o Visit Anvil and do maintenance there
  o Run by storage and pick up stuff for Kougarok 
+ Grab Lunch
+ 2:00 Head out towards Kougarok 
+ 3:00 arrive at Kigluaiks pullout
+ 4:30 arrive at kig 1
+ Kigluaiks 1
  * Leave Radio in ON position
+ Kigluaiks 2
  * Leave Radio in ON position
  * Replace Antenna
  * Get Anemometer working
+ drive to Kougarok

Friday 9/25/2009 Sunset @ 20:50 Twilight @ 21:38

+ Site Visit to K1
+ Site Visit to K3 

Sunday 9/27/2009 Sunset @ 20:46 Twilight @ 21:34

+ Site Visit to K2
+ Grab Canoe and head to Council
+ Hotel in Nome

Monday 9/28/2009 Sunset @ 20:43 Twilight @ 21:31

+ Return to Fairbanks on afternoon flight.