Difference between revisions of "Umiat May 2010 Field Trip"
Jump to navigation
Jump to search
imported>Eyoucha |
|||
(11 intermediate revisions by one other user not shown) | |||
Line 7: | Line 7: | ||
* April 12-17 Umiat Runway Plowed by UIC | * April 12-17 Umiat Runway Plowed by UIC | ||
* May 1 - BLM flight full | * May 1 - BLM flight full | ||
− | * May 4 | + | * May 3, 4, 5 ADCP/boating training, May 6 Sontek River Surveyor ADCP training event, May 7 pack up gear for flights to Umiat |
* May 8-9 DOT plow runway? | * May 8-9 DOT plow runway? | ||
* May 8-12 Richard to Umiat Daily BLM flights to Umiat, 1 UAF camp supplies flight 1 UAF staff flight 1 UAF equipment/gear flight? | * May 8-12 Richard to Umiat Daily BLM flights to Umiat, 1 UAF camp supplies flight 1 UAF staff flight 1 UAF equipment/gear flight? | ||
Line 13: | Line 13: | ||
* May 12 BLM fuel delivery (?) | * May 12 BLM fuel delivery (?) | ||
* May 9-11 Horst Camp to Umiat 2 caravan flights mobilization | * May 9-11 Horst Camp to Umiat 2 caravan flights mobilization | ||
− | * May | + | * May 12 UAF crew & Horst cook to Umiat (1 or 2 flights? Need all gear weights to determine if we can get 1 flight) Bob, Jeff, Jeff, Horacio. |
+ | * May 12 UAF L4 Helicopter arrives in Umiat | ||
* May 19 Ken to Umiat, Bob to Prudhoe (Dave B. to Umiat w/ BLM). Resupply Horst camp. | * May 19 Ken to Umiat, Bob to Prudhoe (Dave B. to Umiat w/ BLM). Resupply Horst camp. | ||
− | * May 26 BLM Camp resupply flight (Bill Lee arrives) | + | * May 26 BLM Camp resupply flight (Bill Lee arrives). Resupply HOrst camp |
* June 3 UAF crew + cook departs Umiat, Horst group arrives for camp tear down | * June 3 UAF crew + cook departs Umiat, Horst group arrives for camp tear down | ||
+ | * June 3 Ken Irving to Prudhoe, Bob Busey to Fairbanks | ||
* June 5 2 flights for Horst crew demob to Fairbanks | * June 5 2 flights for Horst crew demob to Fairbanks | ||
Line 33: | Line 35: | ||
* Test ADCPs in river May 3-7 | * Test ADCPs in river May 3-7 | ||
* River Surveyor ADCP/GPS set up and testing in river May 3-7 | * River Surveyor ADCP/GPS set up and testing in river May 3-7 | ||
− | * Novatel GPS configuration files | + | * Novatel GPS configuration files |
− | * Trimble memory upgrade and battery cable | + | * Trimble memory upgrade and battery cable |
− | * Configure HOBO meters | + | * Configure HOBO meters |
− | * Survival kits put together | + | * Survival kits put together |
* Manuals/Guidance | * Manuals/Guidance | ||
+ | * Helicopter time tracking sheet | ||
== Equipment/Supplies to Send to Umiat == | == Equipment/Supplies to Send to Umiat == | ||
* 1 drum unleaded fuel for boat motor and misc. use | * 1 drum unleaded fuel for boat motor and misc. use | ||
* Spare Aquistar PTs | * Spare Aquistar PTs | ||
− | * HOBO PTs + data reader | + | * HOBO PTs + data reader, hardware |
* Wall tent supplies @ red door | * Wall tent supplies @ red door | ||
* 3- 12V 100 a-h batteries (ADCP, Trimble GPS, spare) | * 3- 12V 100 a-h batteries (ADCP, Trimble GPS, spare) | ||
Line 53: | Line 56: | ||
* 2 radios | * 2 radios | ||
* 2 GPS tripods | * 2 GPS tripods | ||
+ | * Mount for GPS reciever on boat (from USV) | ||
+ | * GPS/Radios | ||
+ | * lithium batteries | ||
+ | * lithium battery packs for GPS/ADCP/radios | ||
* spare drybags | * spare drybags | ||
* life jackets (2 to Itkillik, 2 to Chandler) | * life jackets (2 to Itkillik, 2 to Chandler) | ||
+ | * box for lifejacket storage | ||
* printer | * printer | ||
* Disc weights for PTs | * Disc weights for PTs | ||
Line 68: | Line 76: | ||
* Satellite phones (2) | * Satellite phones (2) | ||
* Shotguns + ammo (2) | * Shotguns + ammo (2) | ||
+ | * pepper spray | ||
+ | * gun cleaning kit | ||
+ | * anchor 30 lb | ||
+ | * boat hook | ||
+ | * boat entry rope | ||
+ | * spare rope | ||
* spare boat & motor parts | * spare boat & motor parts | ||
+ | * boat motor manuals | ||
* survival/safety bags | * survival/safety bags | ||
* misc. stream gauging parts | * misc. stream gauging parts |
Latest revision as of 22:15, 16 April 2010
Contents
Umiat May 2010 Logistics
This website helps me organize everything that needs to get done for the Umiat logistics May 2010.
(EKY Last Update 4/12/10)
Schedule
- April 12-17 Umiat Runway Plowed by UIC
- May 1 - BLM flight full
- May 3, 4, 5 ADCP/boating training, May 6 Sontek River Surveyor ADCP training event, May 7 pack up gear for flights to Umiat
- May 8-9 DOT plow runway?
- May 8-12 Richard to Umiat Daily BLM flights to Umiat, 1 UAF camp supplies flight 1 UAF staff flight 1 UAF equipment/gear flight?
- May 11 BLM fuel bladders set up (?)
- May 12 BLM fuel delivery (?)
- May 9-11 Horst Camp to Umiat 2 caravan flights mobilization
- May 12 UAF crew & Horst cook to Umiat (1 or 2 flights? Need all gear weights to determine if we can get 1 flight) Bob, Jeff, Jeff, Horacio.
- May 12 UAF L4 Helicopter arrives in Umiat
- May 19 Ken to Umiat, Bob to Prudhoe (Dave B. to Umiat w/ BLM). Resupply Horst camp.
- May 26 BLM Camp resupply flight (Bill Lee arrives). Resupply HOrst camp
- June 3 UAF crew + cook departs Umiat, Horst group arrives for camp tear down
- June 3 Ken Irving to Prudhoe, Bob Busey to Fairbanks
- June 5 2 flights for Horst crew demob to Fairbanks
Logistics To DO
- Book Wright Air Flights
- Coordinate flights w/ BLM Richard
- Assist with DEC permitting for Horst Camp as needed - Emily
- UIC Quote - Bill
- Horst camp weights (Josh Horst)
- UAF equip weights - Jeff M?
- ADCP Q msmst cheat sheet - Emily/Bob
- Trimble GPS set up cheat sheet - Bill Lee
To DO for Field Prep
- Shopping List
- Test ADCPs in river May 3-7
- River Surveyor ADCP/GPS set up and testing in river May 3-7
- Novatel GPS configuration files
- Trimble memory upgrade and battery cable
- Configure HOBO meters
- Survival kits put together
- Manuals/Guidance
- Helicopter time tracking sheet
Equipment/Supplies to Send to Umiat
- 1 drum unleaded fuel for boat motor and misc. use
- Spare Aquistar PTs
- HOBO PTs + data reader, hardware
- Wall tent supplies @ red door
- 3- 12V 100 a-h batteries (ADCP, Trimble GPS, spare)
- battery charger
- Trimble GPS and tripod
- ADCP Rio Grande
- ADCP River Surveyor
- Novatel GPS and wiring harnesses, config files
- Big Toughbook
- 2 radios
- 2 GPS tripods
- Mount for GPS reciever on boat (from USV)
- GPS/Radios
- lithium batteries
- lithium battery packs for GPS/ADCP/radios
- spare drybags
- life jackets (2 to Itkillik, 2 to Chandler)
- box for lifejacket storage
- printer
- Disc weights for PTs
- Hose clamps
- sledgehammers
- rebar drive head
- level, survey tripod, rod
- backup hardrives
- flow tracker, rod, manuals
- binoculars
- laser rangefinder
- helo helmets
- Satellite phones (2)
- Shotguns + ammo (2)
- pepper spray
- gun cleaning kit
- anchor 30 lb
- boat hook
- boat entry rope
- spare rope
- spare boat & motor parts
- boat motor manuals
- survival/safety bags
- misc. stream gauging parts
- Manuals/Guidance
Summary Field work To Do List
- Measure discharge as frequently as possible in Anaktuvuk River during snowmelt runoff
- Evaluate/maintain and repair stations on Anaktuvuk, Itkillik, and Chandler rivers
- Chandler Camera
- Chandler PTs, Station
- Find new location for Chandler Station?
- Take basic hydrologic/ice observations for each river
- Improve existing (2009) (i.e., stage/discharge relationship) for Anaktuvuk River gauging station when ice-free
- Anaktuvuk Rating Curve / Anaktuvuk Rating Curve - Log (Last Update: 3/29/10, EKY)