Difference between revisions of "Toolik DOT 2011-05-19"

From IARC 207 Wiki
Jump to navigation Jump to search
 
 
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
===Coordinates===
 
===Coordinates===
 
Itkillik Station -- Lat: 68 51.991,  Lon: -150 2.400,  Elev: 458 meters (1504 feet)<br/>  
 
Itkillik Station -- Lat: 68 51.991,  Lon: -150 2.400,  Elev: 458 meters (1504 feet)<br/>  
 +
Northern Extent of Open Water -- Lat: N68 40,331,    Lon: -149 50.279<br/>
 +
PlantCam -- Lat:  N68 54.757,  Lon: -150 05.697<br/>
 +
Hobo #2 -- Lat: N68 52 13.1",  Lon: - 150 02 59.2"<br/>
 +
Hobo #3 -- Lat: N68 52 44.72",  Lon: -150 03 57.63"<br/>
 +
Probable Peak Flow Gaging Location -- Lat: N68
  
 
===Tasks===
 
===Tasks===
 +
====Bob from Camp====
 +
* Load helo up with gaging equipment for the culvert site.
 +
* download data from R8
 +
* Clear memory & send R8 back out with TSCe handheld
 +
* also send out instructions for gps
  
 
====Itkillik Station====
 
====Itkillik Station====
* Download GPS Data & Restart logging
+
* Measure bumper & bottom of R8 to GPS Master 2 again
** TSCe
+
* Retrieve GPS Unit for Bob
 
* Snow Survey
 
* Snow Survey
 
** Everything is on site
 
** Everything is on site
* Start Surveying?
+
* Start Surveying
 +
* Paint top of culvert
 +
* Standard aerial pictures of gaging cross-section
 +
* Identify Dye Locations (Start & Finish)
 +
** Start @ Station
 +
** Look for good downriver Locations
  
 
====Itkillik River Crossing====
 
====Itkillik River Crossing====
 
* Pictures @ Bridge crossing
 
* Pictures @ Bridge crossing
 
** Digital Camera
 
** Digital Camera
* Plant Cam Setup
 
** 6 pieces of Rebar (@cam spot... X pieces)
 
** 2 tarps (@Toolik)
 
** Spray Paint (@station)
 
** cloth tape measure (in helicopter)
 
** sledge hammer (in helicopter)
 
** para cord to keep the plant cam from bouncing in the wind? (back of truck)
 
  
 
====Peak Flow Gaging Site====
 
====Peak Flow Gaging Site====
* Settle on a location  
+
* Settle on a location (Get a visual of it)
 +
 
 +
====Hobo #3 Location====
 
* Spare Hobo (@Toolik)
 
* Spare Hobo (@Toolik)
 
** Program in camp on 5/18
 
** Program in camp on 5/18
 +
* Make a GPS Master 3 near the third hobo down river.
 
* hobo environmental protection (@snowmachine trailer)
 
* hobo environmental protection (@snowmachine trailer)
 
* steel cable (in helicopter)
 
* steel cable (in helicopter)
Line 47: Line 58:
 
* Shovels (in helicopter)
 
* Shovels (in helicopter)
  
===Things to do yet in Toolik===
+
===Bob in Toolik===
 
* Update firmware on streampro
 
* Update firmware on streampro
 
* Follow up on Ken's email about other station work
 
* Follow up on Ken's email about other station work
Line 57: Line 68:
  
 
===Things to do on another day at the Itkillik===
 
===Things to do on another day at the Itkillik===
* Make a GPS Master 3 near the third hobo down river once it's installed.
 

Latest revision as of 07:30, 19 May 2011

Coordinates

Itkillik Station -- Lat: 68 51.991, Lon: -150 2.400, Elev: 458 meters (1504 feet)
Northern Extent of Open Water -- Lat: N68 40,331, Lon: -149 50.279
PlantCam -- Lat: N68 54.757, Lon: -150 05.697
Hobo #2 -- Lat: N68 52 13.1", Lon: - 150 02 59.2"
Hobo #3 -- Lat: N68 52 44.72", Lon: -150 03 57.63"
Probable Peak Flow Gaging Location -- Lat: N68

Tasks

Bob from Camp

  • Load helo up with gaging equipment for the culvert site.
  • download data from R8
  • Clear memory & send R8 back out with TSCe handheld
  • also send out instructions for gps

Itkillik Station

  • Measure bumper & bottom of R8 to GPS Master 2 again
  • Retrieve GPS Unit for Bob
  • Snow Survey
    • Everything is on site
  • Start Surveying
  • Paint top of culvert
  • Standard aerial pictures of gaging cross-section
  • Identify Dye Locations (Start & Finish)
    • Start @ Station
    • Look for good downriver Locations

Itkillik River Crossing

  • Pictures @ Bridge crossing
    • Digital Camera

Peak Flow Gaging Site

  • Settle on a location (Get a visual of it)

Hobo #3 Location

  • Spare Hobo (@Toolik)
    • Program in camp on 5/18
  • Make a GPS Master 3 near the third hobo down river.
  • hobo environmental protection (@snowmachine trailer)
  • steel cable (in helicopter)
  • cable clamps (with Bill)
  • weight (in helicopter?)
  • sledge hammer (in helicopter)
  • screed stakes (in helicopter)
    • 1 for hobo in river
    • 1 for hobo anchor on the bank
    • 1 for GPS Master 3
  • Tools --
    • 5/16" Nut Driver for hose clamps
    • 1/4" wrench or leatherman for steel cable clamps
    • shovel or two
    • ice pick
    • breaker bar

Tools

  • Bob's toolbags (in helicopter)
  • Shovels (in helicopter)

Bob in Toolik

  • Update firmware on streampro
  • Follow up on Ken's email about other station work
    • Line out coordinates and a game plan for these sites
  • Test out GPS scripts with StreamPro
  • Start Daily Backups
  • Move the rest of the gear to the station


Things to do on another day at the Itkillik