Difference between revisions of "NGEE September 3 2012 Trip"
Jump to navigation
Jump to search
(22 intermediate revisions by 6 users not shown) | |||
Line 1: | Line 1: | ||
− | To | + | ===Notes=== |
+ | * [[NGEE Barrow Intensive Sites Initial Wiring]] | ||
+ | * First Program (not including thermal offsets which will be added onsite): | ||
+ | ** https://github.com/frankohanlon/ngee/blob/master/ngee_intensive_site_subset.CR1 | ||
+ | * [[NGEE September 3 2012 Trip not essential to the trip information]] | ||
+ | ===Metadata type stuff=== | ||
+ | * [[NGEE-Barrow Calibration and Serial Numbers]] | ||
+ | * Thermistor Probe Calibrations ([https://docs.google.com/open?id=0B0bJdr7FBoY-MG9FTjFCb2w2c28]) | ||
+ | * Thermistor Strings and Triple Calibrations ([https://docs.google.com/open?id=0B0bJdr7FBoY-WkVfMDdLX3Zjc2c]) | ||
+ | * Timezone - UTC | ||
+ | * PakBus IDs - A = 400; B = 401; C = 402; D = 403 | ||
+ | |||
+ | ===Shipping=== | ||
+ | * Tripods, battery boxes etc. | ||
+ | ** '''NAC Waybill 345-2130-8372''' | ||
+ | * Batteries | ||
+ | ** '''NAC Waybill 345-2130-8431''' | ||
+ | |||
+ | ===Bill Remaining things to grab=== | ||
+ | * 2 pcs Null Modem cables | ||
+ | * Heat shrink | ||
+ | * Heat Gun | ||
+ | * lead weights | ||
+ | * 2 drill kits | ||
+ | * 2 drills and batteries and chargers | ||
+ | * small tarp for soil pits | ||
+ | * frame pack | ||
+ | |||
+ | ===Bob Remaining things to grab=== | ||
+ | * 1 pcs SW12V Unit | ||
+ | * 4 pcs nuts & bolts for solar panel mount | ||
+ | * Grabbed, not packed | ||
+ | ** 5 pcs radio & power cable | ||
+ | ** 5 pcs radio antenna setup | ||
+ | ** 3 pcs null modem | ||
+ | ** Ring connectors for batteries | ||
+ | ** power cable to go between batteries | ||
+ | ** power cable to go battery box to instrument box | ||
+ | ** hole drilling stuff for liquid-tite | ||
+ | ** Multiplexer wiring wire | ||
+ | ** Metal Tags for labeling | ||
+ | |||
+ | ===To Purchase=== | ||
+ | * Right size hole saw for the liquid-tite (for a 1/2" fitting) | ||
+ | |||
+ | ===Pre-trip to do=== | ||
+ | * Organized per site items ('''X''' means it's packed / shipped) | ||
+ | ** Precip Stand | ||
+ | *** '''X''' 3 screed stakes | ||
+ | *** '''X''' Pipe: 2 pcs 5 ft; 1 pcs 2.5' | ||
+ | *** '''X''' Hose Clamps (2 sizes) | ||
+ | *** '''X''' NuRail fittings | ||
+ | ** Tripod Related | ||
+ | *** '''X''' 1 pcs tripod & cross arm | ||
+ | *** '''X''' 1 pcs instrument box & contents: | ||
+ | **** '''X''' cable ties | ||
+ | **** '''X''' 2pcs AM16/32s | ||
+ | **** '''X''' 2 pcs current excitation module | ||
+ | **** '''X''' 1 pcs CR1000 | ||
+ | **** 1 pcs radio & power cable | ||
+ | **** 1 pcs radio antenna setup | ||
+ | **** 1 pcs null modem | ||
+ | *** Energy system | ||
+ | **** '''X''' 1 pcs solar panel ''missing one'' | ||
+ | **** '''X''' 2 pcs ubolts for solar panel mount | ||
+ | **** '''X''' 2 pcs aluminum strips for solar panel mount ''shipped in 4' sections in one of the tripod boxes'' | ||
+ | **** 4 pcs nuts & bolts for solar panel mount ''need to grab yet'' | ||
+ | **** '''X''' Batteries | ||
+ | **** '''X''' Ring connectors for batteries | ||
+ | **** power cable to go between batteries | ||
+ | **** '''X''' power cable to go battery box to instrument box | ||
+ | **** '''X''' cable protection between battery box and instrument box | ||
+ | **** '''X''' power cable to go between solar panel and battery box | ||
+ | **** '''X''' cable protection to go between solar panel and battery box | ||
+ | **** '''X''' cold temperature power cable (red & black or an all-weather extension cord) | ||
+ | **** '''X''' 1 pcs power cable from solar panel | ||
+ | **** '''X''' 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking) | ||
+ | **** '''X''' 1 pcs charge controller | ||
+ | *** '''X''' 1 pcs SR50A setup | ||
+ | **** SR50A setup | ||
+ | **** '''X''' 1 pcs SR50A | ||
+ | **** '''X''' 1 pcs SR50A mount (in tripod box) | ||
+ | **** '''X''' 1 pcs SR50A cable | ||
+ | **** '''X''' 1 pcs SR50A cable protection | ||
+ | *** Air Temperature Setup | ||
+ | **** '''X''' 1 pcs AT radiation shield | ||
+ | **** '''X''' 1 pcs 107 Temperature Probe | ||
+ | **** '''X''' 1 pcs cable protection | ||
+ | *** Subsurface Hardware | ||
+ | **** '''X''' 9 HydraProbe IIs | ||
+ | **** '''X''' 3 HFP01 heat flux plates | ||
+ | **** '''X''' 5 deep thermistor probes | ||
+ | **** '''X''' 1 shallow thermistor probes | ||
+ | **** '''X''' 9 thermistors probes to pair with the hydraprobe iis | ||
+ | **** '''X''' 6 thermal conductivity probes to put two of the pits | ||
+ | |||
+ | ===Things to buy=== | ||
+ | * Bit o' Food? | ||
+ | * buy additional required hardware | ||
+ | * wiring stuff (to control all the excess wires) Action Packers? | ||
+ | |||
+ | ===Stuff to bring=== | ||
+ | |||
+ | |||
+ | ==== things not on a PR yet==== | ||
+ | |||
+ | |||
+ | |||
+ | ==== Technical Gear ==== | ||
+ | * '''Shotgun''' | ||
+ | * Keypad | ||
+ | * fish tape | ||
+ | * kayak | ||
+ | * Tool Bags | ||
+ | * Computer & (packed) SC32B | ||
+ | * Climbing harness | ||
+ | * Climbing Gear Proper | ||
+ | * Serial Cables & spares | ||
+ | * brown tarps | ||
+ | * '''X''' Sawzall | ||
+ | * drill | ||
+ | |||
+ | ==== Food to bring out ==== | ||
+ | * Optional | ||
+ | |||
+ | ==== Probable Luggage ==== | ||
+ | # Shotgun [Bob #1] | ||
+ | # Bob Personal backpack [Bob #2] | ||
+ | # Work Actionpacker #1 [Bob #3] | ||
+ | # | ||
+ | |||
+ | ====How it will go down out there==== | ||
+ | * Bil & Vlad drill the thermistor bore holes | ||
+ | * Bob focuses on the wiring and station set up with an assist as needed from others | ||
+ | * All will share hauling duties from truck to intensive site area |
Latest revision as of 11:49, 1 September 2012
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
- First Program (not including thermal offsets which will be added onsite):
- NGEE September 3 2012 Trip not essential to the trip information
Metadata type stuff
- NGEE-Barrow Calibration and Serial Numbers
- Thermistor Probe Calibrations ([1])
- Thermistor Strings and Triple Calibrations ([2])
- Timezone - UTC
* PakBus IDs - A = 400; B = 401; C = 402; D = 403
Shipping
- Tripods, battery boxes etc.
- NAC Waybill 345-2130-8372
- Batteries
- NAC Waybill 345-2130-8431
Bill Remaining things to grab
- 2 pcs Null Modem cables
- Heat shrink
- Heat Gun
- lead weights
- 2 drill kits
- 2 drills and batteries and chargers
- small tarp for soil pits
- frame pack
Bob Remaining things to grab
- 1 pcs SW12V Unit
- 4 pcs nuts & bolts for solar panel mount
- Grabbed, not packed
- 5 pcs radio & power cable
- 5 pcs radio antenna setup
- 3 pcs null modem
- Ring connectors for batteries
- power cable to go between batteries
- power cable to go battery box to instrument box
- hole drilling stuff for liquid-tite
- Multiplexer wiring wire
- Metal Tags for labeling
To Purchase
- Right size hole saw for the liquid-tite (for a 1/2" fitting)
Pre-trip to do
- Organized per site items (X means it's packed / shipped)
- Precip Stand
- X 3 screed stakes
- X Pipe: 2 pcs 5 ft; 1 pcs 2.5'
- X Hose Clamps (2 sizes)
- X NuRail fittings
- Tripod Related
- X 1 pcs tripod & cross arm
- X 1 pcs instrument box & contents:
- X cable ties
- X 2pcs AM16/32s
- X 2 pcs current excitation module
- X 1 pcs CR1000
- 1 pcs radio & power cable
- 1 pcs radio antenna setup
- 1 pcs null modem
- Energy system
- X 1 pcs solar panel missing one
- X 2 pcs ubolts for solar panel mount
- X 2 pcs aluminum strips for solar panel mount shipped in 4' sections in one of the tripod boxes
- 4 pcs nuts & bolts for solar panel mount need to grab yet
- X Batteries
- X Ring connectors for batteries
- power cable to go between batteries
- X power cable to go battery box to instrument box
- X cable protection between battery box and instrument box
- X power cable to go between solar panel and battery box
- X cable protection to go between solar panel and battery box
- X cold temperature power cable (red & black or an all-weather extension cord)
- X 1 pcs power cable from solar panel
- X 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
- X 1 pcs charge controller
- X 1 pcs SR50A setup
- SR50A setup
- X 1 pcs SR50A
- X 1 pcs SR50A mount (in tripod box)
- X 1 pcs SR50A cable
- X 1 pcs SR50A cable protection
- Air Temperature Setup
- X 1 pcs AT radiation shield
- X 1 pcs 107 Temperature Probe
- X 1 pcs cable protection
- Subsurface Hardware
- X 9 HydraProbe IIs
- X 3 HFP01 heat flux plates
- X 5 deep thermistor probes
- X 1 shallow thermistor probes
- X 9 thermistors probes to pair with the hydraprobe iis
- X 6 thermal conductivity probes to put two of the pits
- Precip Stand
Things to buy
- Bit o' Food?
- buy additional required hardware
- wiring stuff (to control all the excess wires) Action Packers?
Stuff to bring
things not on a PR yet
Technical Gear
- Shotgun
- Keypad
- fish tape
- kayak
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Climbing Gear Proper
- Serial Cables & spares
- brown tarps
- X Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Shotgun [Bob #1]
- Bob Personal backpack [Bob #2]
- Work Actionpacker #1 [Bob #3]
How it will go down out there
- Bil & Vlad drill the thermistor bore holes
- Bob focuses on the wiring and station set up with an assist as needed from others
- All will share hauling duties from truck to intensive site area