Difference between revisions of "NGEE Barrow 2013 Boring Trip"
Jump to navigation
Jump to search
(6 intermediate revisions by 3 users not shown) | |||
Line 2: | Line 2: | ||
Stuff to do prior to: | Stuff to do prior to: | ||
− | * Understand how to do the stakeout method of RTK survey | + | * XX Understand how to do the stakeout method of RTK survey |
− | * Can our R8s rx at 418mhz? ... | + | * Can our R8s rx at 418mhz? ... no. Need to get that setup / just check up there for it. |
* setup loggernet.iarc.uaf.edu and transfer the barrow dreamplug data there? | * setup loggernet.iarc.uaf.edu and transfer the barrow dreamplug data there? | ||
* check installed programs on barrow dreamplug | * check installed programs on barrow dreamplug | ||
− | * load coring holes onto GPS | + | sudo dpkg --get-selections | grep -v deinstall > installed_packages-2012_07.txt |
+ | * XX load coring holes onto GPS | ||
* scan fieldbook | * scan fieldbook | ||
+ | * Print this page and workplan from Dave | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Barrow Tasks: | Barrow Tasks: | ||
− | * Download Grid Soil Moisture Data | + | * XX Download Grid Soil Moisture Data |
* Change power supply for dreamplug | * Change power supply for dreamplug | ||
− | * check out C site SR50A cables to see if they can be repaired etc. | + | * XX check out C site SR50A cables to see if they can be repaired etc. |
− | * Check on Grid Battery | + | ** Two problems. 1) cable failure on SR50A 3 (ID 2) 2) variable out of range errors being produced by the program that aren't showing up in the compile on the computer. |
+ | * XX Check on Grid Battery | ||
+ | |||
+ | Stuff to bring: | ||
+ | * XX small toolbag | ||
+ | * XX Shotgun | ||
+ | * XX GPS setup | ||
+ | * XX Toughbook & charger | ||
+ | * XX Trimble Chargers (2) | ||
+ | * XX SC32B | ||
+ | * XX Serial Cables | ||
+ | |||
+ | * XX new butane soldering iron in waterproof case | ||
+ | * XX solder? | ||
+ | * XX PPE: | ||
+ | ** XX Helmets | ||
+ | ** XX Hearing Protection | ||
+ | ** XX Safety Glasses |
Latest revision as of 11:51, 19 April 2013
...coring is more accurate than boring... not sure how that slipped through...
Stuff to do prior to:
- XX Understand how to do the stakeout method of RTK survey
- Can our R8s rx at 418mhz? ... no. Need to get that setup / just check up there for it.
- setup loggernet.iarc.uaf.edu and transfer the barrow dreamplug data there?
- check installed programs on barrow dreamplug
sudo dpkg --get-selections | grep -v deinstall > installed_packages-2012_07.txt
- XX load coring holes onto GPS
- scan fieldbook
- Print this page and workplan from Dave
Barrow Tasks:
- XX Download Grid Soil Moisture Data
- Change power supply for dreamplug
- XX check out C site SR50A cables to see if they can be repaired etc.
- Two problems. 1) cable failure on SR50A 3 (ID 2) 2) variable out of range errors being produced by the program that aren't showing up in the compile on the computer.
- XX Check on Grid Battery
Stuff to bring:
- XX small toolbag
- XX Shotgun
- XX GPS setup
- XX Toughbook & charger
- XX Trimble Chargers (2)
- XX SC32B
- XX Serial Cables
- XX new butane soldering iron in waterproof case
- XX solder?
- XX PPE:
- XX Helmets
- XX Hearing Protection
- XX Safety Glasses