Difference between revisions of "NGEE Barrow 2013 Site Install Trip"
| (14 intermediate revisions by 4 users not shown) | |||
| Line 1: | Line 1: | ||
| + | ==May 2013 Trip==  | ||
| + | ===Purpose: ===  | ||
| + | * Rewire Grid Site station with CR1000 & new multiplexers  | ||
| + | ** XX PakBus ID = 404   | ||
| + | * XX Setup MD485s to get Grid online  | ||
| + | * XX reconfigure Site C CR1000 for act as a pakbus router  | ||
| + | ** Change IsRouter to YES -> Available in advanced settings  | ||
| + | ** Change beacon interval on SDC7 to 60  | ||
| + | * Snow Surveys  | ||
| + | * Any other prep that's possible for the June trip  | ||
| + | * Bring back shotgun  | ||
| + | * slather anticorrosion goo on all 12V/G points?  | ||
| + | * Record Thermal Conductivity Heater Resistance using a high-accuracy ohmmeter  | ||
| + | * Swap out SR50A  | ||
| + | * ARM visit if time  | ||
| + | |||
===Shipping===  | ===Shipping===  | ||
| − | *   | + | * None  | 
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
===To Purchase===  | ===To Purchase===  | ||
| − | *   | + | * XX Anti-Corrosion Goo  | 
| + | * XX Ziplocs  | ||
| + | * In Barrow:  | ||
| + | ** XX Butane -> Going to put someplace (naturally)  | ||
| + | ** Battery Cleaner (haven't seen it)  | ||
| + | ** XX Food  | ||
===Pre-trip to do===  | ===Pre-trip to do===  | ||
| − | *   | + | * done.  | 
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
===Stuff to bring===  | ===Stuff to bring===  | ||
| − | + | * XX Adirondack Tube  | |
| − | + | * XX Scale  | |
| − | + | * XX Thaw Probe  | |
| − | + | * XX Ziplocs  | |
| − | + | * XX GPS  | |
| + | * XX 4 Precision Resistors for new logger  | ||
| + | * XX High Precision Voltmeter  | ||
| + | * XX Duct Seal  | ||
| + | * XX 80' of cable  | ||
==== Technical Gear ====  | ==== Technical Gear ====  | ||
| − | *   | + | * Shotgun -- in Barrow already  | 
* Keypads  | * Keypads  | ||
| − | *   | + | * XX fish tape  | 
| − | * Tool Bags    | + | * XX Tool Bags    | 
| − | * Computer & (packed) SC32B    | + | * XX Computer & (packed) SC32B    | 
| − | *   | + | * XX Serial Cables & spares  | 
| − | |||
| − | |||
| − | |||
| − | |||
==== Food to bring out ====  | ==== Food to bring out ====  | ||
| Line 92: | Line 52: | ||
==== Probable Luggage ====  | ==== Probable Luggage ====  | ||
| − | #   | + | # Bob Personal Actionpacker [Bob #1]  | 
| − | #   | + | # Work Actionpacker #1 [Bob #2]  | 
| − | #   | + | # daypack for working  | 
| − | #  | + | |
| + | ===Rough on-site todo===  | ||
| + | # Copy wiring of Grid Site  | ||
| + | # Transfer wires to new multiplexer & Logger  | ||
| + | # Snowsurveys  | ||
| + | # Measure Heater Resistances for all thermal conductivity probes  | ||
| + | # Look to see if the C site pit 2 thermal conductivity sensors could be connected to a lower instrument enclosure.  | ||
| + | # configure C as pakbus router for grid   | ||
| + | ## http://www.campbellsci.com/forum/messages.cfm?threadid=6E4ABAA0-81A1-4158-B850230D8A56A2EF  | ||
| + | # armor and run rs485 line between C and grid  | ||
| + | |||
| + | ===Probable Schedule===  | ||
| + | * Tuesday  | ||
| + | ** Safety Briefing  | ||
| + | ** Get Trucks & Snowmachines  | ||
| + | ** Eat Lunch   | ||
| + | ** Visit Hut & Prepare for first field trip  | ||
| + | ** Visit Site  | ||
| + | *** Download Data  | ||
| + | *** Start Rewiring  | ||
| + | *** Start measuring precision resistors  | ||
| + | *** Odds and ends  | ||
| + | *** Run MD485 Cable to site C  | ||
| + | *** Barrow Shopping Items  | ||
| + | |||
| + | * Wednesday  | ||
| + | ** 7am Up  | ||
| + | ** 7:30 Breakfast & Make lunch  | ||
| + | ** Visit Site  | ||
| + | *** Snow Surveys @ ABCD  | ||
| + | **** @ 2-4 Random Points within limits outlined below (start with 2 per site and see how long each takes)  | ||
| + | *** continue station rewiring  | ||
| + | *** Verify operation of MD485 Network  | ||
| + | |||
| + | * Thursday  | ||
| + | ** 7am Up  | ||
| + | ** 7:30 Breakfast & Make lunch  | ||
| + | ** Visit Site  | ||
| + | *** Finish Snow Surveys  | ||
| + | *** Finish Wiring  | ||
| + | *** Meet with Thomas  | ||
| + | ** Pack up  | ||
| + | ** Return to Fairbanks  | ||
| − | ===  | + | ===Re: Snow Surveys===  | 
| − | + | ''Larry,''<br>  | |
| − | + | ''Attached are the grid corner coordinates (DGPS) of the end-of-winter snow surveys I did in 2012 and that I repeated last week (all but site A). I used the MagnaProbe and have thousands of measurements from each grid. The measurements are aligned in ~S-N transects, which are located 4 m apart with a measurement every ~ft. These measurements overlap geophysics transects (John, Craig, Susan's).''<br>  | |
| − | + | ''Last year's average snow depth was about 51 cm, this year I think it was 39 at site B and C (site D 50 and 37 cm, respectively).  | |
| − | + | I also took density measurements at each site.''<br>  | |
| − | + | ''I do not think it is realistic to ask anyone to repeat this snowdepth survey every day during the melt. In fact, it would be impossible time wise. Instead, perhaps do a daily survey (of a portion of) the outer lines of the grid, ie its western and southern perimeters, for example??  I  think it would be good to follow the "L" protocol of Rovansek. I also think we need a measurement every <0.5m in order to capture the spatial mosaic of snow accumulation in these landscapes.''<br>  | |
| − | + | ''I think it is critical to perform the ablation survey, including snow density, about the same time every day for each site (i.e. site A at 10am, Site B at 11am etc). ''  | |
| − | + | <pre>Name	Grid Easting (m)	Grid Northing (m)  | |
| − | + | SP_A1	585527.004	7910503.004  | |
| − | + | SP_A2	585557.58	7910439.828  | |
| − | + | SP_A3	585627.052	7910474.226  | |
| − | + | SP_A4	585596.7	7910537.177  | |
| − | + | SP_B1	585802.228	7910297.959  | |
| − | + | SP_B2	585814.765	7910271.935  | |
| − | + | SP_B3	585843.449	7910286.087  | |
| − | + | SP_B4	585830.912	7910312.016  | |
| − | + | SP_C1	585903.79	7910340.005  | |
| − | + | SP_C2	585922.756	7910300.494  | |
| + | SP_C3	585966.613	7910322.093  | ||
| + | SP_C4	585947.384	7910361.341  | ||
| + | SP_D1	585931.474	7910571.739  | ||
| + | SP_D2	585950.487	7910533.064  | ||
| + | SP_D3	585994.132	7910554.454  | ||
| + | SP_D4	585974.902	7910593.777  | ||
| + | </pre>  | ||
Latest revision as of 22:00, 8 May 2013
Contents
May 2013 Trip
Purpose:
- Rewire Grid Site station with CR1000 & new multiplexers
- XX PakBus ID = 404
 
 - XX Setup MD485s to get Grid online
 - XX reconfigure Site C CR1000 for act as a pakbus router
- Change IsRouter to YES -> Available in advanced settings
 - Change beacon interval on SDC7 to 60
 
 - Snow Surveys
 - Any other prep that's possible for the June trip
 - Bring back shotgun
 - slather anticorrosion goo on all 12V/G points?
 - Record Thermal Conductivity Heater Resistance using a high-accuracy ohmmeter
 - Swap out SR50A
 - ARM visit if time
 
Shipping
- None
 
To Purchase
- XX Anti-Corrosion Goo
 - XX Ziplocs
 - In Barrow:
- XX Butane -> Going to put someplace (naturally)
 - Battery Cleaner (haven't seen it)
 - XX Food
 
 
Pre-trip to do
- done.
 
Stuff to bring
- XX Adirondack Tube
 - XX Scale
 - XX Thaw Probe
 - XX Ziplocs
 - XX GPS
 - XX 4 Precision Resistors for new logger
 - XX High Precision Voltmeter
 - XX Duct Seal
 - XX 80' of cable
 
Technical Gear
- Shotgun -- in Barrow already
 - Keypads
 - XX fish tape
 - XX Tool Bags
 - XX Computer & (packed) SC32B
 - XX Serial Cables & spares
 
Food to bring out
- Optional
 
Probable Luggage
- Bob Personal Actionpacker [Bob #1]
 - Work Actionpacker #1 [Bob #2]
 - daypack for working
 
Rough on-site todo
- Copy wiring of Grid Site
 - Transfer wires to new multiplexer & Logger
 - Snowsurveys
 - Measure Heater Resistances for all thermal conductivity probes
 - Look to see if the C site pit 2 thermal conductivity sensors could be connected to a lower instrument enclosure.
 - configure C as pakbus router for grid
 - armor and run rs485 line between C and grid
 
Probable Schedule
- Tuesday
- Safety Briefing
 - Get Trucks & Snowmachines
 - Eat Lunch
 - Visit Hut & Prepare for first field trip
 - Visit Site
- Download Data
 - Start Rewiring
 - Start measuring precision resistors
 - Odds and ends
 - Run MD485 Cable to site C
 - Barrow Shopping Items
 
 
 
- Wednesday
- 7am Up
 - 7:30 Breakfast & Make lunch
 - Visit Site
- Snow Surveys @ ABCD
- @ 2-4 Random Points within limits outlined below (start with 2 per site and see how long each takes)
 
 - continue station rewiring
 - Verify operation of MD485 Network
 
 - Snow Surveys @ ABCD
 
 
- Thursday
- 7am Up
 - 7:30 Breakfast & Make lunch
 - Visit Site
- Finish Snow Surveys
 - Finish Wiring
 - Meet with Thomas
 
 - Pack up
 - Return to Fairbanks
 
 
Re: Snow Surveys
Larry,
Attached are the grid corner coordinates (DGPS) of the end-of-winter snow surveys I did in 2012 and that I repeated last week (all but site A). I used the MagnaProbe and have thousands of measurements from each grid. The measurements are aligned in ~S-N transects, which are located 4 m apart with a measurement every ~ft. These measurements overlap geophysics transects (John, Craig, Susan's).
Last year's average snow depth was about 51 cm, this year I think it was 39 at site B and C (site D 50 and 37 cm, respectively).
I also took density measurements at each site.
I do not think it is realistic to ask anyone to repeat this snowdepth survey every day during the melt. In fact, it would be impossible time wise. Instead, perhaps do a daily survey (of a portion of) the outer lines of the grid, ie its western and southern perimeters, for example??  I  think it would be good to follow the "L" protocol of Rovansek. I also think we need a measurement every <0.5m in order to capture the spatial mosaic of snow accumulation in these landscapes.
I think it is critical to perform the ablation survey, including snow density, about the same time every day for each site (i.e. site A at 10am, Site B at 11am etc). 
Name Grid Easting (m) Grid Northing (m) SP_A1 585527.004 7910503.004 SP_A2 585557.58 7910439.828 SP_A3 585627.052 7910474.226 SP_A4 585596.7 7910537.177 SP_B1 585802.228 7910297.959 SP_B2 585814.765 7910271.935 SP_B3 585843.449 7910286.087 SP_B4 585830.912 7910312.016 SP_C1 585903.79 7910340.005 SP_C2 585922.756 7910300.494 SP_C3 585966.613 7910322.093 SP_C4 585947.384 7910361.341 SP_D1 585931.474 7910571.739 SP_D2 585950.487 7910533.064 SP_D3 585994.132 7910554.454 SP_D4 585974.902 7910593.777