Difference between revisions of "Jessie Cherry May 2013 Toolik Trip"
Jump to navigation
Jump to search
(5 intermediate revisions by 2 users not shown) | |||
Line 4: | Line 4: | ||
'''Any other information not here but could be anticipated as being useful?''' | '''Any other information not here but could be anticipated as being useful?''' | ||
− | + | ||
==To add to program== | ==To add to program== | ||
− | * Change CGR4 to CNR4 | + | * XX Change CGR4 to CNR4 |
− | * Add SR50A | + | * XX Add SR50A |
− | * download current program off cr3000 to see how the RM Young at/rh coefficients are (maybe default is english units or something like that) | + | * XX download current program off cr3000 to see how the RM Young at/rh coefficients are (maybe default is english units or something like that) |
− | * Add PAR quantum to 5 min table | + | * XX Add PAR quantum to 5 min table |
− | * Put CNR4 on 5 min and 1 hour table | + | * XX Put CNR4 on 5 min and 1 hour table |
+ | * XX Check Timezone of existing logger & configure the second logger to be in the same timezone. | ||
==Random info== | ==Random info== | ||
+ | * ''How easy will the antenna be to remove?....'' | ||
− | After you get to camp, ask the staff to fill up the truck with gas and this should go on the 'STAFF Account' because you are working as staff on this trip | + | * Call from Coldfoot to let them know we're coming. |
− | + | ** Thom: 907-455-2511 | |
− | Chad has agreed to give you tower training on Friday morning, the 17th. | + | ** Faye: 907-455-2523 |
+ | * After you get to camp, ask the staff to fill up the truck with gas and this should go on the 'STAFF Account' because you are working as staff on this trip | ||
+ | * Chad has agreed to give you tower training on Friday morning, the 17th. | ||
==To Bring from Fairbanks== | ==To Bring from Fairbanks== | ||
− | * Cabling to extend thermocouple temperature profile from old enclosure to new enclosure. | + | * <s>Cabling to extend thermocouple temperature profile from old enclosure to new enclosure.</s> |
+ | ** Extra data logger & 2 MD485s to log these thermocouples without extending the cables. | ||
+ | *** Need to assign a pakbus ID for this logger | ||
+ | *** Need to configure CR3000 to act as a router | ||
+ | *** Need to configure MD485s | ||
* shovels for digging out buried cabling | * shovels for digging out buried cabling | ||
* extension cord for moving power from old tripod to new tower | * extension cord for moving power from old tripod to new tower | ||
Line 29: | Line 37: | ||
** solder | ** solder | ||
** heat shrink | ** heat shrink | ||
+ | * Calibrated WS sensor | ||
+ | * Calibrated WD sensor | ||
+ | * Calibrated HMP45Cs | ||
+ | * Calibrated PAR | ||
* extra cabling | * extra cabling | ||
+ | * Compass | ||
+ | ** Declination is 20 degrees East | ||
* Toolbags | * Toolbags | ||
* XX Extra data logger (CR1000, for any instruments that aren't transferred to the new logger on this trip and or don't reach... completely just a back up item) | * XX Extra data logger (CR1000, for any instruments that aren't transferred to the new logger on this trip and or don't reach... completely just a back up item) | ||
* XX small actionpacker | * XX small actionpacker | ||
− | * sled | + | * XX sled |
* Climbing harness | * Climbing harness | ||
− | * CNR4 Radiometer | + | * XX CNR4 Radiometer |
− | ** Also bring Precision Resistor for measuring | + | ** XX Also bring Precision Resistor for measuring CNR4 Thermistor |
** Also need to update program with calibration constants for this sensor. | ** Also need to update program with calibration constants for this sensor. | ||
Line 53: | Line 67: | ||
* Move power to the new enclosure | * Move power to the new enclosure | ||
* Transfer as much equipment as possible to new tower | * Transfer as much equipment as possible to new tower | ||
+ | ** PAR ('''measure''' its height) | ||
+ | ** CMP6 Pyranometer ('''measure''' its height) | ||
+ | ** RM Young AT/RH (@3m? '''...check''') | ||
+ | ** HMP45C AT/RH (@5m) | ||
+ | ** | ||
+ | |||
* Leave what can't be moved at the old site | * Leave what can't be moved at the old site | ||
* Install Pluvio 2 | * Install Pluvio 2 | ||
Line 59: | Line 79: | ||
* Install new radiometer | * Install new radiometer | ||
* Tighten guy wires and level tower | * Tighten guy wires and level tower | ||
+ | * Install SR50A | ||
+ | ** record snow depth under sensor footprint | ||
+ | * Level all Pyranometers | ||
+ | * Replace with freshly calibrated sensors: | ||
+ | ** HMP45C | ||
+ | ** 024A WD | ||
+ | ** 014A WS | ||
+ | ** PAR | ||
== Needs == | == Needs == |
Latest revision as of 18:19, 17 May 2013
Contents
Overview
The met station at Toolik needs to be transferred from its tripod to a tower. The field requirements for this assignment will be outlined here.
Any other information not here but could be anticipated as being useful?
To add to program
- XX Change CGR4 to CNR4
- XX Add SR50A
- XX download current program off cr3000 to see how the RM Young at/rh coefficients are (maybe default is english units or something like that)
- XX Add PAR quantum to 5 min table
- XX Put CNR4 on 5 min and 1 hour table
- XX Check Timezone of existing logger & configure the second logger to be in the same timezone.
Random info
- How easy will the antenna be to remove?....
- Call from Coldfoot to let them know we're coming.
- Thom: 907-455-2511
- Faye: 907-455-2523
- After you get to camp, ask the staff to fill up the truck with gas and this should go on the 'STAFF Account' because you are working as staff on this trip
- Chad has agreed to give you tower training on Friday morning, the 17th.
To Bring from Fairbanks
Cabling to extend thermocouple temperature profile from old enclosure to new enclosure.- Extra data logger & 2 MD485s to log these thermocouples without extending the cables.
- Need to assign a pakbus ID for this logger
- Need to configure CR3000 to act as a router
- Need to configure MD485s
- Extra data logger & 2 MD485s to log these thermocouples without extending the cables.
- shovels for digging out buried cabling
- extension cord for moving power from old tripod to new tower
- cable splicing tools for anything that might need extending
- soldering iron
- butane
- propane torch
- solder
- heat shrink
- Calibrated WS sensor
- Calibrated WD sensor
- Calibrated HMP45Cs
- Calibrated PAR
- extra cabling
- Compass
- Declination is 20 degrees East
- Toolbags
- XX Extra data logger (CR1000, for any instruments that aren't transferred to the new logger on this trip and or don't reach... completely just a back up item)
- XX small actionpacker
- XX sled
- Climbing harness
- XX CNR4 Radiometer
- XX Also bring Precision Resistor for measuring CNR4 Thermistor
- Also need to update program with calibration constants for this sensor.
Current Equipment On-Site
- New tower w/ enclosure & guy wires
- Garden web cam
- Pluvio 1 (Currently installed but broken)
- Met Station w/ soil thermocouples, radiation, lake sensors on rusted tripod
- New Multiplexer
- Pluvio 2 (needs to be installed but is in the environmental data center)... has a different base than the existing one.
- Pluvio 2 base is inside the wyoming gauge snow fence sitting on the ground
- Get comm working on Snow Particle Counter IP: 137.229.91.90
Goals
- Mount recalibrated AT/RH sensors
- Move power to the new enclosure
- Transfer as much equipment as possible to new tower
- PAR (measure its height)
- CMP6 Pyranometer (measure its height)
- RM Young AT/RH (@3m? ...check)
- HMP45C AT/RH (@5m)
- Leave what can't be moved at the old site
- Install Pluvio 2
- note, pluvio 1 wire is a bit short. but should be okay with pluvio 2
- Get evaporation pan working [maybe more like just inspect it to make sure it could work with the parts that were quoted from Campbell. Measure it's size, take pictures, and confirm model, if possible. If not, no worries. I'll work on it in June.
- Install new radiometer
- Tighten guy wires and level tower
- Install SR50A
- record snow depth under sensor footprint
- Level all Pyranometers
- Replace with freshly calibrated sensors:
- HMP45C
- 024A WD
- 014A WS
- PAR
Needs
- Submit two TAs for Patrick and Bob so you can get a partial per diem and cover the gas money (Jessie is working on this)
- TFS Site Wiring / cable lengths
- List cable types needed ?
- List muxes needed ?
List equipment/tools need to bring
- Conduit
- New Program (Bob Bu has draft) - Direct Link emailed 5/4/2013
- Program Git Archive:
- [Bob's DropBox]/logger_programs/toolik_tfs/TFScamp_CR3000.CR3
- Program Git Archive:
- Troubleshoot Evaporation Pan
- Figure out what needs calibration
Updates
- Pluvio 1 and Pluvio 2 use different base stands. Make sure to include the Pluvio 2 mounting hardware!
- Evaporation pan may not be in the budget this year if the gauging unit (Campbell 21531) needs to be replaced.
- Conduit isn't an immediate priority since this depends on the final setup.