Difference between revisions of "Barrow Summer 2017 trip"
Jump to navigation
Jump to search
(→ARM) |
|||
(9 intermediate revisions by one other user not shown) | |||
Line 2: | Line 2: | ||
*replace SR50a snow transducers | *replace SR50a snow transducers | ||
+ | *snip veg if necessary | ||
+ | *install CFM | ||
*what is the deal with the LPM power connector? do I need a new one? | *what is the deal with the LPM power connector? do I need a new one? | ||
*install cs107 => PROGRAM CHANGE | *install cs107 => PROGRAM CHANGE | ||
Line 12: | Line 14: | ||
**cable for power and coms | **cable for power and coms | ||
**cable housing | **cable housing | ||
− | **rebars | + | **rebars for base |
+ | ** two pieces of unistrut | ||
+ | ** ubolts | ||
to purchase: | to purchase: | ||
− | *4 | + | *4 or 8 1/2 in rebar |
*pipe: I think i want a 3in pipe (based on http://www.mcnichols.com/?pageCode=pipedims) | *pipe: I think i want a 3in pipe (based on http://www.mcnichols.com/?pageCode=pipedims) | ||
+ | *couple extra ubolts just in case for 3in pipe | ||
+ | *grinder | ||
+ | |||
Line 22: | Line 29: | ||
*sledge hammer (and maybe drill?) | *sledge hammer (and maybe drill?) | ||
*fish tape | *fish tape | ||
+ | *proof of driving insurrance (reservation number 7127) | ||
+ | *computer and charger! | ||
+ | *tool bag | ||
+ | *anti corrosion goo | ||
for fence install | for fence install | ||
*pipe pounder | *pipe pounder | ||
− | + | *ladder | |
+ | *screed stakes | ||
+ | *small bolts and nuts | ||
+ | *drill, metal bits, permafrost bits | ||
+ | *clamp to drill through pipe | ||
+ | |||
+ | Jen post-installation notes | ||
+ | ** Bring flags for marking leg positioning. Note math is not correct in alter shield instructions for spacing. | ||
===NGEE=== | ===NGEE=== | ||
Latest revision as of 14:12, 29 January 2018
ARM
- replace SR50a snow transducers
- snip veg if necessary
- install CFM
- what is the deal with the LPM power connector? do I need a new one?
- install cs107 => PROGRAM CHANGE
- cable housing
- mount LPM
- baird mount
- pipe
- trail mat
- cable for power and coms
- cable housing
- rebars for base
- two pieces of unistrut
- ubolts
to purchase:
- 4 or 8 1/2 in rebar
- pipe: I think i want a 3in pipe (based on http://www.mcnichols.com/?pageCode=pipedims)
- couple extra ubolts just in case for 3in pipe
- grinder
to bring
- sledge hammer (and maybe drill?)
- fish tape
- proof of driving insurrance (reservation number 7127)
- computer and charger!
- tool bag
- anti corrosion goo
for fence install
- pipe pounder
- ladder
- screed stakes
- small bolts and nuts
- drill, metal bits, permafrost bits
- clamp to drill through pipe
Jen post-installation notes
- Bring flags for marking leg positioning. Note math is not correct in alter shield instructions for spacing.
NGEE
- desiccant for cnr4
- level cnr4
- level tipping buckets
- sr50a transducers