Difference between revisions of "Barrow Summer 2017 trip"

From IARC 207 Wiki
Jump to navigation Jump to search
 
(3 intermediate revisions by one other user not shown)
Line 2: Line 2:
  
 
*replace SR50a snow transducers
 
*replace SR50a snow transducers
 +
*snip veg if necessary
 +
*install CFM
 
*what is the deal with the LPM power connector? do I need a new one?
 
*what is the deal with the LPM power connector? do I need a new one?
 
*install cs107 => PROGRAM CHANGE
 
*install cs107 => PROGRAM CHANGE
Line 12: Line 14:
 
**cable for power and coms
 
**cable for power and coms
 
**cable housing
 
**cable housing
**rebars(reasses this based on holes in baird mount)
+
**rebars for base
 
** two pieces of unistrut
 
** two pieces of unistrut
** two 3in and two 3.5in pipe clamps
+
** ubolts
  
 
to purchase:
 
to purchase:
Line 20: Line 22:
 
*pipe: I think i want a 3in pipe (based on http://www.mcnichols.com/?pageCode=pipedims)
 
*pipe: I think i want a 3in pipe (based on http://www.mcnichols.com/?pageCode=pipedims)
 
*couple extra ubolts just in case for 3in pipe
 
*couple extra ubolts just in case for 3in pipe
 +
*grinder
 +
  
  
Line 27: Line 31:
 
*proof of driving insurrance (reservation number 7127)
 
*proof of driving insurrance (reservation number 7127)
 
*computer and charger!
 
*computer and charger!
 +
*tool bag
 +
*anti corrosion goo
  
 
for fence install
 
for fence install
 
*pipe pounder
 
*pipe pounder
 
*ladder
 
*ladder
 
+
*screed stakes
 +
*small bolts and nuts
 +
*drill, metal bits, permafrost bits
 +
*clamp to drill through pipe
 +
 +
Jen post-installation notes
 +
** Bring flags for marking leg positioning.  Note math is not correct in alter shield instructions for spacing.
 
===NGEE===
 
===NGEE===
  

Latest revision as of 14:12, 29 January 2018

ARM

  • replace SR50a snow transducers
  • snip veg if necessary
  • install CFM
  • what is the deal with the LPM power connector? do I need a new one?
  • install cs107 => PROGRAM CHANGE
    • cable housing
  • mount LPM
    • baird mount
    • pipe
    • trail mat
    • cable for power and coms
    • cable housing
    • rebars for base
    • two pieces of unistrut
    • ubolts

to purchase:


to bring

  • sledge hammer (and maybe drill?)
  • fish tape
  • proof of driving insurrance (reservation number 7127)
  • computer and charger!
  • tool bag
  • anti corrosion goo

for fence install

  • pipe pounder
  • ladder
  • screed stakes
  • small bolts and nuts
  • drill, metal bits, permafrost bits
  • clamp to drill through pipe

Jen post-installation notes

    • Bring flags for marking leg positioning. Note math is not correct in alter shield instructions for spacing.

NGEE

  • desiccant for cnr4
  • level cnr4
  • level tipping buckets
  • sr50a transducers