(Created page with "* brought out Ameriflux team * Fixed CNR4 top thermistor which I think the connector was cross threaded a bit and as tight as it would go but not actually engaged. Or previou...")
 
 
(One intermediate revision by one other user not shown)
Line 3: Line 3:
 
* brought out replacement computer for met data but thinking I won't install until after the experiment is over and power needs are less... or I'll see once everything is all set and then maybe add.
 
* brought out replacement computer for met data but thinking I won't install until after the experiment is over and power needs are less... or I'll see once everything is all set and then maybe add.
 
* Extension cord for forest floor tower had fallen out of the wall a bit... plugged it back in.
 
* Extension cord for forest floor tower had fallen out of the wall a bit... plugged it back in.
 +
* still doing a bit of boardwalk work
  
 
===For to do next visit===
 
===For to do next visit===
* could use several power strips in shed to make sure circuits are more easily balanced.
+
 
 
* Should use those one hole deals plus drill and screws to take a bit of pressure off the extension cords plugged in but hanging outside shed.
 
* Should use those one hole deals plus drill and screws to take a bit of pressure off the extension cords plugged in but hanging outside shed.
* need to bring out red & black wire for the 12v power supplies for the two laptops.
 
 
* shift data logger power onto the 12v battery system
 
* shift data logger power onto the 12v battery system
 
* buy more cross arm brackets for additional PAR sensors on top
 
* buy more cross arm brackets for additional PAR sensors on top
 
* bring out new skin surface temperature sensors
 
* bring out new skin surface temperature sensors
*
+
** wire to SSSoil C7 or C3
 +
* circuits are a bit unbalanced at the moment (this might have been heat driven)
 +
* bring out proper hole saw and long bit for drilling through structure.
 +
* check with Bob about billing.
 +
* test old si-111

Latest revision as of 16:52, 26 July 2018

  • brought out Ameriflux team
  • Fixed CNR4 top thermistor which I think the connector was cross threaded a bit and as tight as it would go but not actually engaged. Or previously engaged and loosened shortly after the reinstallation.
  • brought out replacement computer for met data but thinking I won't install until after the experiment is over and power needs are less... or I'll see once everything is all set and then maybe add.
  • Extension cord for forest floor tower had fallen out of the wall a bit... plugged it back in.
  • still doing a bit of boardwalk work

For to do next visit

  • Should use those one hole deals plus drill and screws to take a bit of pressure off the extension cords plugged in but hanging outside shed.
  • shift data logger power onto the 12v battery system
  • buy more cross arm brackets for additional PAR sensors on top
  • bring out new skin surface temperature sensors
    • wire to SSSoil C7 or C3
  • circuits are a bit unbalanced at the moment (this might have been heat driven)
  • bring out proper hole saw and long bit for drilling through structure.
  • check with Bob about billing.
  • test old si-111