Difference between revisions of "SS Site Visit 201-05-17 to 27"

From IARC 207 Wiki
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
* program and wire up soil pit box
 
* program and wire up soil pit box
 
* retire old ss-main toughbook
 
* retire old ss-main toughbook
 +
* reconnect tower LICOR to toughbook.
 +
* download data
 
*  
 
*  
 +
===Left at site:===
 +
* soldering iron
 +
* propane torch to start soldering iron
 +
* solder
 +
====Ziploc toolsack====
 +
* 5/16" Nut Driver
 +
* 7/16" Nut Driver
 +
* 1/2" Nut Driver
 +
* Small Campbell Phillips Screwdriver
 +
* Small Campbell Flat Screwdriver
 +
* Large Campbell Flat Screwdriver
 +
* 1/2" Wrench
 +
* Large Phillips Screwdriver
 +
* English Allen Wrenches
  
 
===To Do Yet===
 
===To Do Yet===
* fix tower network cable
 
 
* solder HMPcable
 
* solder HMPcable
* figure out if smartflux2 at forest floor is properly configured.
+
* get MD485 network extended to Soil Pit 2
 +
* cable management

Latest revision as of 15:05, 26 May 2019

Fixes

  • Replace power cable connector for aspirators (animal chew)
  • replace LI7550 at forest floor
  • swap out tower top CNR4
  • computer maintenance on PEN Camera
  • computer maintenance on ss-lognet
  • add arable
  • add soil pit 2
  • check the precip bucket... still good
  • program mod for ss_met and ss_soil to output arable variables on the five minutes
  • program and wire up soil pit box
  • retire old ss-main toughbook
  • reconnect tower LICOR to toughbook.
  • download data

Left at site:

  • soldering iron
  • propane torch to start soldering iron
  • solder

Ziploc toolsack

  • 5/16" Nut Driver
  • 7/16" Nut Driver
  • 1/2" Nut Driver
  • Small Campbell Phillips Screwdriver
  • Small Campbell Flat Screwdriver
  • Large Campbell Flat Screwdriver
  • 1/2" Wrench
  • Large Phillips Screwdriver
  • English Allen Wrenches

To Do Yet

  • solder HMPcable
  • get MD485 network extended to Soil Pit 2
  • cable management