− | + | NGEE Project Disturbance / Kougarok focus. Helping Go mostly. | |
− | * | + | * Tentatively plan to visit all three Kougarok met stations...if time |
+ | ** Replace desiccant @ 10m tower | ||
+ | ** Replace CR10X @ 10m tower | ||
+ | ** Replace CR10X @ Mauze Gulch site | ||
+ | ** Replace snow transducers | ||
+ | * Measure ground control at NGEE Koguarok mile 64 site (drop off GPS and pick up the next day) | ||
* Thaw depth and subsidence survey | * Thaw depth and subsidence survey | ||
− | * Measure creek flow | + | * Measure creek flow at Teller mile 27 site |
+ | (Most of this trip itinerary is being driven by subsidence survey and drone work) | ||
+ | |||
+ | ===August 27=== | ||
+ | * Fly into Nome in afternoon | ||
+ | * rent truck and visit conex | ||
+ | * Charge 12v batteries and yellow trimble batteries | ||
+ | |||
+ | ===August 28=== | ||
+ | * Drive out to Kougarok and hope to stay in the airport cabin out there. | ||
+ | * Full day of measurements. | ||
+ | * setup Trimble station @ end of road for surveying | ||
+ | |||
+ | ===August 29=== | ||
+ | * Full day at the site and then return in evening to Nome | ||
+ | |||
+ | ===August 30=== | ||
+ | * On drive back to Kougarok deploy the base GPS at NGEE m64 GCP. | ||
+ | * Full day at the site | ||
+ | * camp in cabin again. | ||
+ | |||
+ | ===August 31=== | ||
+ | * Partial day at site | ||
+ | * Retrieve survey gps @ m64 site on drive back to Nome | ||
+ | * pack up | ||
+ | |||
+ | ===September 1=== | ||
+ | * Ship gear that needs to be sent out out. | ||
+ | * hop on airplane and return to Anchorage / Fairbanks |
Latest revision as of 09:27, 1 August 2021
NGEE Project Disturbance / Kougarok focus. Helping Go mostly.
- Tentatively plan to visit all three Kougarok met stations...if time
- Replace desiccant @ 10m tower
- Replace CR10X @ 10m tower
- Replace CR10X @ Mauze Gulch site
- Replace snow transducers
- Measure ground control at NGEE Koguarok mile 64 site (drop off GPS and pick up the next day)
- Thaw depth and subsidence survey
- Measure creek flow at Teller mile 27 site
(Most of this trip itinerary is being driven by subsidence survey and drone work)
August 27
- Fly into Nome in afternoon
- rent truck and visit conex
- Charge 12v batteries and yellow trimble batteries
August 28
- Drive out to Kougarok and hope to stay in the airport cabin out there.
- Full day of measurements.
- setup Trimble station @ end of road for surveying
August 29
- Full day at the site and then return in evening to Nome
August 30
- On drive back to Kougarok deploy the base GPS at NGEE m64 GCP.
- Full day at the site
- camp in cabin again.
August 31
- Partial day at site
- Retrieve survey gps @ m64 site on drive back to Nome
- pack up
September 1
- Ship gear that needs to be sent out out.
- hop on airplane and return to Anchorage / Fairbanks