Difference between revisions of "Inside Box"

From IARC 207 Wiki
Jump to navigation Jump to search
 
Line 9: Line 9:
 
# wire up logger to mux
 
# wire up logger to mux
 
# run power wire to battery
 
# run power wire to battery
# install fuse holder & extra fuses
+
# install fuse holder & extra fuses (1 for sap, 1 for logger)
 +
 
 +
====Yet To Do====
 +
* Mount a terminal strip to the wood
 +
+ run power from the strip to the logger & the sap flow module
 +
+ add connectors to the solar panel charge controller line
 +
+ drill holes in the clear box for the cables to come in.
 +
++ 5 sap flow
 +
++ 2 CS616 (SM)
 +
++ 2 107 (STemp)
 +
++ 1 Precip
 +
++ 1 HMP45C (AT/RH)
 +
++ 2 Power
 +
+

Revision as of 14:47, 1 April 2011

Tools:

  • CSI Screw driver
  • crimping tool
  • Wire snips

The Plan

  1. mount the instrumentation to inside the clear tote.
  2. secure to wood with screws
  3. wire up logger to mux
  4. run power wire to battery
  5. install fuse holder & extra fuses (1 for sap, 1 for logger)

Yet To Do

  • Mount a terminal strip to the wood

+ run power from the strip to the logger & the sap flow module + add connectors to the solar panel charge controller line + drill holes in the clear box for the cables to come in. ++ 5 sap flow ++ 2 CS616 (SM) ++ 2 107 (STemp) ++ 1 Precip ++ 1 HMP45C (AT/RH) ++ 2 Power +