Difference between revisions of "Inside Box"
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
====Yet To Do==== | ====Yet To Do==== | ||
* Mount a terminal strip to the wood | * Mount a terminal strip to the wood | ||
− | + | * run power from the strip to the logger & the sap flow module | |
− | + | * add connectors to the solar panel charge controller line | |
− | + | * drill holes in the clear box for the cables to come in. | |
− | + | ** 5 sap flow | |
− | + | ** 2 CS616 (SM) | |
− | + | ** 2 107 (STemp) | |
− | + | ** 1 Precip | |
− | + | ** 1 HMP45C (AT/RH) | |
− | + | ** 2 Power | |
− |
Latest revision as of 14:48, 1 April 2011
Tools:
- CSI Screw driver
- crimping tool
- Wire snips
The Plan
- mount the instrumentation to inside the clear tote.
- secure to wood with screws
- wire up logger to mux
- run power wire to battery
- install fuse holder & extra fuses (1 for sap, 1 for logger)
Yet To Do
- Mount a terminal strip to the wood
- run power from the strip to the logger & the sap flow module
- add connectors to the solar panel charge controller line
- drill holes in the clear box for the cables to come in.
- 5 sap flow
- 2 CS616 (SM)
- 2 107 (STemp)
- 1 Precip
- 1 HMP45C (AT/RH)
- 2 Power