===Things to do yet in Toolik===
 
===Things to do yet in Toolik===
* Update firmware on streampro
 
 
* Follow up on Ken's email about other station work
 
* Follow up on Ken's email about other station work
** Line out coordinates and a game plan for these sites
+
* Contintue Daily Computer Backups
* Test out GPS scripts with StreamPro
+
* When the R8 is sent to Umiat, include a solar panel.... Charge Controller, too?
* Start Daily Backups
 
* Move the rest of the gear to the station
 
* When the R8 is sent to Umiat, include a solar panel.
 

Revision as of 19:19, 19 May 2011

Coordinates

Itkillik Station -- Lat: 68 51.991, Lon: -150 2.400, Elev: 458 meters (1504 feet)
Northern Extent of Open Water -- Lat: N68 40,331, Lon: -149 50.279
PlantCam -- Lat: N68 54.757, Lon: -150 05.697
Hobo #2 -- Lat: N68 52 13.1", Lon: - 150 02 59.2"
Hobo #3 -- Lat: N68 52 44.72", Lon: -150 03 57.63"
Probable Peak Flow Gaging Location -- Lat: N68

Tasks

Itkillik Station

  • Snow Survey
    • Everything is on site
  • Surveying?
    • Everything is on site
  • GPS Survey GPS Master #1 Rebar #1 (& identify it with spray paint maybe?)
  • Paint top of culvert
  • Standard aerial pictures of gaging cross-section
  • Identify Dye Locations (Start & Finish)
  • Set up Cataraft
  • Identify safe water exit points in case of accidents

Itkillik River Crossing

  • Pictures @ Bridge crossing
    • Digital Camera
  • Plant Cam Setup
    • 6 pieces of Rebar (@cam spot... X pieces)
    • 2 tarps (@Toolik)
    • Spray Paint (@station)
    • cloth tape measure (in helicopter)
    • sledge hammer (in helicopter)
    • para cord to keep the plant cam from bouncing in the wind? (back of truck)

Peak Flow Gaging Site

  • Settle on a location (Get a visual of it)


Tools

  • Bob's toolbags (in helicopter)
  • Shovels (in helicopter)

Things to do yet in Toolik

  • Follow up on Ken's email about other station work
  • Contintue Daily Computer Backups
  • When the R8 is sent to Umiat, include a solar panel.... Charge Controller, too?