===Notes===
 
===Notes===
 
* [[NGEE Barrow Intensive Sites Initial Wiring]]
 
* [[NGEE Barrow Intensive Sites Initial Wiring]]
* First Program: https://github.com/frankohanlon/ngee/blob/master/ngee_intensive_site_subset.CR1
+
* First Program (not including thermal offsets which will be added onsite):  
 +
** https://github.com/frankohanlon/ngee/blob/master/ngee_intensive_site_subset.CR1
 +
 
 +
===Metadata type stuff===
 +
* [[NGEE-Barrow Calibration and Serial Numbers]]
 +
* Timezone - UTC
 +
* PakBus IDs - A = 400; B = 401; C = 402; D = 403
 +
 
 +
===Supplies / Equipment the GIPL is providing to the project that will need to be replaced===
 +
* 4 Tripods
 +
* 4 CrossArms
 +
* 4 Radiation Shields
 +
* 4 107 Temperature Probes
 +
* 24 Thermal Conductivity sensors from East30
 +
* 8 Current Excitation Modules
 +
* 8 AM16/32 Multiplexers
 +
* 4 CR1000s
 +
* Instrument box
 +
* charge controller
 +
 
 +
=== Supplies / Equipment IARC is providing to the project that will need to be replaced===
 +
* Radios?
 +
** set hopping channels to an alternate
 +
** set up in multipoint mode
 +
* Power Cables?
 +
 
 +
===Enroute===
 +
* Battery Boxes should arrive 8/30ish
 +
* batteries I'm not sure of but should arrive near our departure.
 +
 
 +
===Program to do yet===
 +
* add radio on/off
 +
* seasonal snow measurements
 +
* low battery voltage checks before running thermal conductivity probes
 +
* test final program
 +
* add the thermal conductivity probes
  
 
===Pre-trip to do===
 
===Pre-trip to do===
* Test out program more extensively
+
* Cut Pipe
 +
* Ship stuff: thinking two loads
 +
** shipment 1 ship Wednesday and that will be stuff we'll need on arrival
 +
** shipment 2 ship Friday and that will be things still being prepped early next week.
 +
* Organize per site items
 +
** Precip Stand
 +
*** 3 screed stakes
 +
*** Pipe: 2 pcs 5 ft; 1 pcs 2.5'
 +
*** Hose Clamps (2 sizes)
 +
*** NuRail fittings (currently in Bob's office)
 +
** Tripod Related
 +
*** 1 pcs tripod
 +
*** 1 pcs instrument box & contents:
 +
**** cable ties
 +
**** AM16/32s
 +
**** 2 pcs current excitation module
 +
**** 1 pcs CR1000
 +
**** 1 pcs radio & power cable
 +
**** 1 pcs radio antenna setup
 +
**** 1 pcs null modem
 +
*** Energy system
 +
**** 1 pcs solar panel
 +
**** 2 pcs ubolts for solar panel mount
 +
**** 2 pcs aluminum strips for solar panel mount
 +
**** 4 pcs nuts & bolts for solar panel mount
 +
**** Batteries if they arrive
 +
**** Ring connectors for batteries
 +
**** power cable to go between batteries
 +
**** power cable to go battery box to instrument box
 +
**** cable protection between battery box and instrument box
 +
**** power cable to go between solar panel and battery box
 +
**** cable protection to go between solar panel and battery box
 +
**** cold temperature power cable (red & black or an all-weather extension cord)
 +
**** 1 pcs power cable from solar panel
 +
**** 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
 +
**** 1 pcs charge controller
 +
*** 1 pcs SR50A setup
 +
**** 5' x 3/4" Pipe
 +
**** SR50A setup
 +
**** 1 pcs SR50A
 +
**** 1 pcs SR50A mount
 +
**** 1 pcs SR50A cable
 +
**** 1 pcs SR50A cable protection
 +
*** Air Temperature Setup
 +
**** 1 pcs AT radiation shield
 +
**** 1 pcs 107 Temperature Probe
 +
**** 1 pcs cable protection
 +
*** Subsurface Hardware
 +
**** 9 HydraProbe IIs
 +
**** 3 HFP01 heat flux plates
 +
**** 5 deep thermistor probes
 +
**** 1 shallow thermistor probes
 +
**** 9 thermistors probes to pair with the hydraprobe iis
 +
**** 6 thermal conductivity probes to put two of the pits
  
 
===Things to buy===
 
===Things to buy===
 
* Bit o' Food?
 
* Bit o' Food?
 
* buy additional required hardware
 
* buy additional required hardware
 +
* 2400 ft of 3/4" flex conduit
 +
* 100 ft of 3/8" flex conduit
 
* brown tarps
 
* brown tarps
 
* solar panel mounts
 
* solar panel mounts
Line 15: Line 105:
 
* large pvc and fittings to go between action packer and CSI enclosure?
 
* large pvc and fittings to go between action packer and CSI enclosure?
 
* fittings for an additional opening in bottom of enclosures
 
* fittings for an additional opening in bottom of enclosures
 +
* cable ties
  
 
===Stuff to bring out===
 
===Stuff to bring out===
 
==== Extras from Bill ====
 
==== Extras from Bill ====
 
* 4 pcs 107 Probes & Radiation Shields
 
* 4 pcs 107 Probes & Radiation Shields
 +
  
 
==== Other ====
 
==== Other ====
 
*  
 
*  
 +
 +
==== things not on a PR yet====
 +
* power cables (reds & blacks or extension cords)
 +
* cable protection for energy system
 +
* brown tarps from Freddies
 +
* NRS straps maybe from the Beave for the tarp.
 +
* Cable Ties
  
 
==== Equipment To Ship ====
 
==== Equipment To Ship ====
Line 36: Line 135:
 
* '''Shotgun'''
 
* '''Shotgun'''
 
* Keypad
 
* Keypad
 +
* fish tape
 +
* kayak
 
* Tool Bags  
 
* Tool Bags  
 
* Computer & (packed) SC32B  
 
* Computer & (packed) SC32B  
Line 53: Line 154:
 
# Work Actionpacker #1 [Bob #3]
 
# Work Actionpacker #1 [Bob #3]
 
#
 
#
 +
 +
====How it will go down out there====
 +
* Bil & Vlad drill the thermistor bore holes
 +
* Bob focuses on the wiring and station set up with an assist as needed from others
 +
* Anna if she comes digs and logs soil pits
 +
* All will share hauling duties from truck to intensive site area

Revision as of 11:50, 24 August 2012

Notes

Metadata type stuff

Supplies / Equipment the GIPL is providing to the project that will need to be replaced

  • 4 Tripods
  • 4 CrossArms
  • 4 Radiation Shields
  • 4 107 Temperature Probes
  • 24 Thermal Conductivity sensors from East30
  • 8 Current Excitation Modules
  • 8 AM16/32 Multiplexers
  • 4 CR1000s
  • Instrument box
  • charge controller

Supplies / Equipment IARC is providing to the project that will need to be replaced

  • Radios?
    • set hopping channels to an alternate
    • set up in multipoint mode
  • Power Cables?

Enroute

  • Battery Boxes should arrive 8/30ish
  • batteries I'm not sure of but should arrive near our departure.

Program to do yet

  • add radio on/off
  • seasonal snow measurements
  • low battery voltage checks before running thermal conductivity probes
  • test final program
  • add the thermal conductivity probes

Pre-trip to do

  • Cut Pipe
  • Ship stuff: thinking two loads
    • shipment 1 ship Wednesday and that will be stuff we'll need on arrival
    • shipment 2 ship Friday and that will be things still being prepped early next week.
  • Organize per site items
    • Precip Stand
      • 3 screed stakes
      • Pipe: 2 pcs 5 ft; 1 pcs 2.5'
      • Hose Clamps (2 sizes)
      • NuRail fittings (currently in Bob's office)
    • Tripod Related
      • 1 pcs tripod
      • 1 pcs instrument box & contents:
        • cable ties
        • AM16/32s
        • 2 pcs current excitation module
        • 1 pcs CR1000
        • 1 pcs radio & power cable
        • 1 pcs radio antenna setup
        • 1 pcs null modem
      • Energy system
        • 1 pcs solar panel
        • 2 pcs ubolts for solar panel mount
        • 2 pcs aluminum strips for solar panel mount
        • 4 pcs nuts & bolts for solar panel mount
        • Batteries if they arrive
        • Ring connectors for batteries
        • power cable to go between batteries
        • power cable to go battery box to instrument box
        • cable protection between battery box and instrument box
        • power cable to go between solar panel and battery box
        • cable protection to go between solar panel and battery box
        • cold temperature power cable (red & black or an all-weather extension cord)
        • 1 pcs power cable from solar panel
        • 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
        • 1 pcs charge controller
      • 1 pcs SR50A setup
        • 5' x 3/4" Pipe
        • SR50A setup
        • 1 pcs SR50A
        • 1 pcs SR50A mount
        • 1 pcs SR50A cable
        • 1 pcs SR50A cable protection
      • Air Temperature Setup
        • 1 pcs AT radiation shield
        • 1 pcs 107 Temperature Probe
        • 1 pcs cable protection
      • Subsurface Hardware
        • 9 HydraProbe IIs
        • 3 HFP01 heat flux plates
        • 5 deep thermistor probes
        • 1 shallow thermistor probes
        • 9 thermistors probes to pair with the hydraprobe iis
        • 6 thermal conductivity probes to put two of the pits

Things to buy

  • Bit o' Food?
  • buy additional required hardware
  • 2400 ft of 3/4" flex conduit
  • 100 ft of 3/8" flex conduit
  • brown tarps
  • solar panel mounts
  • wiring stuff (to control all the excess wires) Action Packers?
  • conduit, lots!
  • large pvc and fittings to go between action packer and CSI enclosure?
  • fittings for an additional opening in bottom of enclosures
  • cable ties

Stuff to bring out

Extras from Bill

  • 4 pcs 107 Probes & Radiation Shields


Other

things not on a PR yet

  • power cables (reds & blacks or extension cords)
  • cable protection for energy system
  • brown tarps from Freddies
  • NRS straps maybe from the Beave for the tarp.
  • Cable Ties

Equipment To Ship

  • 4 Tripods
  • 4 Battery Boxes
  • 4 Solar Panels
  • Thermistor Strings
  • Additional Thermistors
  • Radiation Shields
  • Instrument boxes with loggers etc. installed
  • charge controllers

Technical Gear

  • Shotgun
  • Keypad
  • fish tape
  • kayak
  • Tool Bags
  • Computer & (packed) SC32B
  • Climbing harness
  • Climbing Gear Proper
  • Serial Cables & spares
  • brown tarps
  • Sawzall
  • drill

Food to bring out

  • Optional

Probable Luggage

  1. Shotgun [Bob #1]
  2. Bob Personal backpack [Bob #2]
  3. Work Actionpacker #1 [Bob #3]

How it will go down out there

  • Bil & Vlad drill the thermistor bore holes
  • Bob focuses on the wiring and station set up with an assist as needed from others
  • Anna if she comes digs and logs soil pits
  • All will share hauling duties from truck to intensive site area