Difference between revisions of "NGEE September 3 2012 Trip"
Jump to navigation
Jump to search
Line 33: | Line 33: | ||
===To Purchase=== | ===To Purchase=== | ||
− | * | + | * Right size hole saw for the liquid-tite (for a 1/2" fitting) |
===Pre-trip to do=== | ===Pre-trip to do=== | ||
Line 58: | Line 58: | ||
**** 4 pcs nuts & bolts for solar panel mount ''need to grab yet'' | **** 4 pcs nuts & bolts for solar panel mount ''need to grab yet'' | ||
**** '''X''' Batteries | **** '''X''' Batteries | ||
− | **** Ring connectors for batteries | + | **** '''X''' Ring connectors for batteries |
**** power cable to go between batteries | **** power cable to go between batteries | ||
− | **** power cable to go battery box to instrument box | + | **** '''X''' power cable to go battery box to instrument box |
− | **** cable protection between battery box and instrument box | + | **** '''X''' cable protection between battery box and instrument box |
− | **** power cable to go between solar panel and battery box | + | **** '''X''' power cable to go between solar panel and battery box |
− | **** cable protection to go between solar panel and battery box | + | **** '''X''' cable protection to go between solar panel and battery box |
**** '''X''' cold temperature power cable (red & black or an all-weather extension cord) | **** '''X''' cold temperature power cable (red & black or an all-weather extension cord) | ||
**** '''X''' 1 pcs power cable from solar panel | **** '''X''' 1 pcs power cable from solar panel | ||
Line 95: | Line 95: | ||
==== things not on a PR yet==== | ==== things not on a PR yet==== | ||
− | + | ||
Line 109: | Line 109: | ||
* Serial Cables & spares | * Serial Cables & spares | ||
* brown tarps | * brown tarps | ||
− | * Sawzall | + | * '''X''' Sawzall |
* drill | * drill | ||
Revision as of 11:57, 30 August 2012
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring
- First Program (not including thermal offsets which will be added onsite):
- NGEE September 3 2012 Trip not essential to the trip information
Metadata type stuff
- NGEE-Barrow Calibration and Serial Numbers
- Timezone - UTC
* PakBus IDs - A = 400; B = 401; C = 402; D = 403
Shipping
- Tripods, battery boxes etc.
- NAC Waybill 345-2130-8372
- Batteries
- NAC Waybill 345-2130-8431
Bill Remaining things to grab
- 2 pcs Null Modem cables
- Heat shrink
- Heat Gun
Bob Remaining things to grab
- 1 pcs SW12V Unit
- 4 pcs nuts & bolts for solar panel mount
- Grabbed, not packed
- 5 pcs radio & power cable
- 5 pcs radio antenna setup
- 3 pcs null modem
- Ring connectors for batteries
- power cable to go between batteries
- power cable to go battery box to instrument box
- hole drilling stuff for liquid-tite
- Multiplexer wiring wire
To Purchase
- Right size hole saw for the liquid-tite (for a 1/2" fitting)
Pre-trip to do
- Organized per site items (X means it's packed / shipped)
- Precip Stand
- X 3 screed stakes
- X Pipe: 2 pcs 5 ft; 1 pcs 2.5'
- X Hose Clamps (2 sizes)
- X NuRail fittings
- Tripod Related
- X 1 pcs tripod & cross arm
- X 1 pcs instrument box & contents:
- X cable ties
- X 2pcs AM16/32s
- X 2 pcs current excitation module
- X 1 pcs CR1000
- 1 pcs radio & power cable
- 1 pcs radio antenna setup
- 1 pcs null modem
- Energy system
- X 1 pcs solar panel missing one
- X 2 pcs ubolts for solar panel mount
- X 2 pcs aluminum strips for solar panel mount shipped in 4' sections in one of the tripod boxes
- 4 pcs nuts & bolts for solar panel mount need to grab yet
- X Batteries
- X Ring connectors for batteries
- power cable to go between batteries
- X power cable to go battery box to instrument box
- X cable protection between battery box and instrument box
- X power cable to go between solar panel and battery box
- X cable protection to go between solar panel and battery box
- X cold temperature power cable (red & black or an all-weather extension cord)
- X 1 pcs power cable from solar panel
- X 1 pcs cable protection for solar panel cable (sort of left off cable protection estimates I'm thinking)
- X 1 pcs charge controller
- X 1 pcs SR50A setup
- SR50A setup
- X 1 pcs SR50A
- X 1 pcs SR50A mount (in tripod box)
- X 1 pcs SR50A cable
- X 1 pcs SR50A cable protection
- Air Temperature Setup
- X 1 pcs AT radiation shield
- X 1 pcs 107 Temperature Probe
- X 1 pcs cable protection
- Subsurface Hardware
- X 9 HydraProbe IIs
- X 3 HFP01 heat flux plates
- X 5 deep thermistor probes
- X 1 shallow thermistor probes
- X 9 thermistors probes to pair with the hydraprobe iis
- X 6 thermal conductivity probes to put two of the pits
- Precip Stand
Things to buy
- Bit o' Food?
- buy additional required hardware
- wiring stuff (to control all the excess wires) Action Packers?
Stuff to bring
things not on a PR yet
Technical Gear
- Shotgun
- Keypad
- fish tape
- kayak
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Climbing Gear Proper
- Serial Cables & spares
- brown tarps
- X Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Shotgun [Bob #1]
- Bob Personal backpack [Bob #2]
- Work Actionpacker #1 [Bob #3]
How it will go down out there
- Bil & Vlad drill the thermistor bore holes
- Bob focuses on the wiring and station set up with an assist as needed from others
- All will share hauling duties from truck to intensive site area