Difference between revisions of "NGEE Barrow 2013 Site Install Trip"
		
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
		
		
		
		
		
	
| Line 9: | Line 9: | ||
* Thermistor Strings and Triple Calibrations ([https://docs.google.com/open?id=0B0bJdr7FBoY-WkVfMDdLX3Zjc2c])  | * Thermistor Strings and Triple Calibrations ([https://docs.google.com/open?id=0B0bJdr7FBoY-WkVfMDdLX3Zjc2c])  | ||
* Timezone - UTC  | * Timezone - UTC  | ||
| − | + | * PakBus IDs - A = 400; B = 401; C = 402; D = 403  | |
===Shipping===  | ===Shipping===  | ||
| − | * New Instrumentation once it arrives  | + | * New Instrumentation once it arrives:  | 
** Precip Buckets 3x  | ** Precip Buckets 3x  | ||
** Wind Screen 3x  | ** Wind Screen 3x  | ||
| − | **   | + | ** HMP155s 6x  | 
| + | ** MetOne 6x  | ||
| + | ** Barometric Pressure  | ||
| + | ** Leg Mount Instrument Boxes 3x  | ||
| + | *** Install AM16/32B if time  | ||
| + | *** Install SDM Switch if time  | ||
| + | ** Radiation Shields  | ||
| + | ** Cross Arms   | ||
| + | *** 1.5" Sched 40 Aluminum = Net Radiometer 3x  | ||
| + | *** 1" Sched 40 Aluminum = Upper WS & AT/RH 3x  | ||
| + | ** Tripod Mast  | ||
| + | *** 1.5" Sched 40 Galvanized Pipe  | ||
| + | |||
| + | |||
===To Do as of 4/10/2013===  | ===To Do as of 4/10/2013===  | ||
| Line 23: | Line 36: | ||
* Sketch up site  | * Sketch up site  | ||
* Wire up boxes as much as possible (is anything possible?  Maybe just mount the peripherals)  | * Wire up boxes as much as possible (is anything possible?  Maybe just mount the peripherals)  | ||
| + | * cut crossarms to length  | ||
=== Remaining things to grab===  | === Remaining things to grab===  | ||
| − | *  | + | * ?  | 
===To Purchase===  | ===To Purchase===  | ||
| − | *    | + | * ?  | 
===Pre-trip to do===  | ===Pre-trip to do===  | ||
* Organized per site items ('''X''' means it's packed / shipped)  | * Organized per site items ('''X''' means it's packed / shipped)  | ||
| − | ** Precip Stand     | + | ** Precip Stand  (3 sets)  | 
| − | ***   | + | *** 4 NuRail 3/4 offset cross pieces  | 
| − | ***   | + | *** 1 Novalynx Wind Screen  | 
| − | ***   | + | *** 1 TE525m & Cable  | 
| − | + | ||
** Tripod Related  | ** Tripod Related  | ||
| − | ***   | + | ***    | 
| − | ***   | + | ***    | 
| − | ****   | + | ****  | 
| − | ****   | + | ****    | 
| − | ****   | + | ****    | 
| − | ****   | + | ****    | 
| − | ****   | + | ****    | 
| − | ****   | + | ****    | 
| − | ****   | + | ****    | 
| − | + | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
===Things to buy===  | ===Things to buy===  | ||
* Bit o' Food?  | * Bit o' Food?  | ||
| − | *   | + | * ?  | 
| − | |||
===Stuff to bring===  | ===Stuff to bring===  | ||
| Line 97: | Line 78: | ||
==== Technical Gear ====  | ==== Technical Gear ====  | ||
* '''Shotgun'''  | * '''Shotgun'''  | ||
| − | *   | + | * Keypads  | 
| − | * fish tape  | + | * '''fish tape'''  | 
| − | |||
* Tool Bags    | * Tool Bags    | ||
* Computer & (packed) SC32B    | * Computer & (packed) SC32B    | ||
| Line 105: | Line 85: | ||
* Climbing Gear Proper  | * Climbing Gear Proper  | ||
* Serial Cables & spares  | * Serial Cables & spares  | ||
| − | *   | + | * Sawzall  | 
| − | |||
* drill  | * drill  | ||
| Line 118: | Line 97: | ||
#  | #  | ||
| − | ====  | + | ====Rough on-site todo====  | 
| − | + | # Remove box & solar panel  | |
| − | + | # Measure from top of tripod base to cross arm... note in fieldbook  | |
| − | + | # Remove crossarm off tripod  | |
| + | # unscrew center pole  | ||
| + | # put 1.5" offset nurail fitting on new center pole  | ||
| + | # attach new center pole  | ||
| + | # put cross arm, instrument box, and solar panel back on the tower.  | ||
| + | # Install new instrument box on lower leg.  | ||
| + | # Mount all new sensors  | ||
| + | ## Net Radiometer @ 1-1.5m  | ||
| + | ## WS on radiometer crossarm  | ||
| + | ## HMP155 on radiometer crossarm  | ||
| + | ## Second HMP155 & WS high up on tower, maybe as high as they'll reach.  | ||
| + | ## Armor all the cabling  | ||
| + | ## Armor and install the precip bucket.  | ||
| + | ## Install the precip wind screen  | ||
| + | # send new program to data logger  | ||
Revision as of 17:28, 10 April 2013
Contents
Notes
- NGEE Barrow Intensive Sites Initial Wiring (Out of date for the 2013 Install at the moment)
 - Programs :
 
Metadata type stuff
- Still to be collated: NGEE-Barrow Calibration and Serial Numbers
 - Thermistor Probe Calibrations ([1])
 - Thermistor Strings and Triple Calibrations ([2])
 - Timezone - UTC
 - PakBus IDs - A = 400; B = 401; C = 402; D = 403
 
Shipping
- New Instrumentation once it arrives:
- Precip Buckets 3x
 - Wind Screen 3x
 - HMP155s 6x
 - MetOne 6x
 - Barometric Pressure
 - Leg Mount Instrument Boxes 3x
- Install AM16/32B if time
 - Install SDM Switch if time
 
 - Radiation Shields
 - Cross Arms
- 1.5" Sched 40 Aluminum = Net Radiometer 3x
 - 1" Sched 40 Aluminum = Upper WS & AT/RH 3x
 
 - Tripod Mast
- 1.5" Sched 40 Galvanized Pipe
 
 
 
To Do as of 4/10/2013
- Modify Programs
 - Wiring Diagrams
 - PRs for freight
 - Sketch up site
 - Wire up boxes as much as possible (is anything possible? Maybe just mount the peripherals)
 - cut crossarms to length
 
Remaining things to grab
- ?
 
To Purchase
- ?
 
Pre-trip to do
- Organized per site items (X means it's packed / shipped)
- Precip Stand  (3 sets)
- 4 NuRail 3/4 offset cross pieces
 - 1 Novalynx Wind Screen
 - 1 TE525m & Cable
 
 
 - Precip Stand  (3 sets)
 
- Tripod Related
 - 
 
- Tripod Related
 
Things to buy
- Bit o' Food?
 - ?
 
Stuff to bring
things not on a PR yet
Technical Gear
- Shotgun
 - Keypads
 - fish tape
 - Tool Bags
 - Computer & (packed) SC32B
 - Climbing harness
 - Climbing Gear Proper
 - Serial Cables & spares
 - Sawzall
 - drill
 
Food to bring out
- Optional
 
Probable Luggage
- Shotgun [Bob #1]
 - Bob Personal backpack [Bob #2]
 - Work Actionpacker #1 [Bob #3]
 
Rough on-site todo
- Remove box & solar panel
 - Measure from top of tripod base to cross arm... note in fieldbook
 - Remove crossarm off tripod
 - unscrew center pole
 - put 1.5" offset nurail fitting on new center pole
 - attach new center pole
 - put cross arm, instrument box, and solar panel back on the tower.
 - Install new instrument box on lower leg.
 - Mount all new sensors
- Net Radiometer @ 1-1.5m
 - WS on radiometer crossarm
 - HMP155 on radiometer crossarm
 - Second HMP155 & WS high up on tower, maybe as high as they'll reach.
 - Armor all the cabling
 - Armor and install the precip bucket.
 - Install the precip wind screen
 
 - send new program to data logger