Difference between revisions of "NGEE Barrow 2013 Site Install Trip"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | ==May 2013 Trip== | ||
+ | Purpose: | ||
+ | * Fix Grid Site station | ||
+ | * Snow Surveys | ||
+ | * Any other prep that's possible | ||
+ | |||
===Shipping=== | ===Shipping=== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===To Do as of 4/21/2013=== | ===To Do as of 4/21/2013=== | ||
Line 39: | Line 12: | ||
* PRs for freight | * PRs for freight | ||
* Sketch up site | * Sketch up site | ||
− | |||
− | |||
− | |||
* cut crossarms to length | * cut crossarms to length | ||
* Change SDI-12 IDs for SR50As | * Change SDI-12 IDs for SR50As | ||
Line 55: | Line 25: | ||
===Pre-trip to do=== | ===Pre-trip to do=== | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 78: | Line 32: | ||
===Stuff to bring=== | ===Stuff to bring=== | ||
− | + | * Adirondack Tube | |
+ | * Scale | ||
+ | * Thaw Probe | ||
+ | * Ziplocs | ||
+ | * GPS | ||
+ | * If NuRail fittings ever arrive then we can change out the tripod poles (or start) this trip. | ||
==== things not on a PR yet==== | ==== things not on a PR yet==== | ||
Line 105: | Line 64: | ||
====Rough on-site todo==== | ====Rough on-site todo==== | ||
− | # | + | # Copy wiring of Grid Site |
− | # | + | # Transfer wires to new multiplexer & Logger |
− | + | # Snowsurveys | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | # | ||
− | |||
− | |||
− |
Revision as of 15:25, 28 April 2013
Contents
May 2013 Trip
Purpose:
- Fix Grid Site station
- Snow Surveys
- Any other prep that's possible
Shipping
To Do as of 4/21/2013
- Modify Programs
- Wiring Diagrams
- PRs for freight
- Sketch up site
- cut crossarms to length
- Change SDI-12 IDs for SR50As
- Review Site C data... Look closely at SR50A data for precise failure dates.
- SM Grid rewiring?
Remaining things to grab
- ?
To Purchase
- ?
Pre-trip to do
Things to buy
- Bit o' Food?
- ?
Stuff to bring
- Adirondack Tube
- Scale
- Thaw Probe
- Ziplocs
- GPS
- If NuRail fittings ever arrive then we can change out the tripod poles (or start) this trip.
things not on a PR yet
Technical Gear
- Shotgun
- Keypads
- fish tape
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Serial Cables & spares
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Shotgun [Bob #1]
- Bob Personal backpack [Bob #2]
- Work Actionpacker #1 [Bob #3]
Rough on-site todo
- Copy wiring of Grid Site
- Transfer wires to new multiplexer & Logger
- Snowsurveys