Line 1: | Line 1: | ||
==May 2013 Trip== | ==May 2013 Trip== | ||
Purpose: | Purpose: | ||
− | * | + | * Rewire Grid Site station with CR1000 & new multiplexers |
+ | * Setup MD485s to get Grid online | ||
+ | * reconfigure Site C CR1000 for act as a pakbus router | ||
* Snow Surveys | * Snow Surveys | ||
− | * Any other prep that's possible | + | * Any other prep that's possible for the June trip |
− | + | * Bring back shotgun | |
+ | * slather anticorrosion goo on all 12V/G points? | ||
===Shipping=== | ===Shipping=== | ||
+ | * None | ||
===To Do as of 4/21/2013=== | ===To Do as of 4/21/2013=== | ||
Line 15: | Line 19: | ||
* cut crossarms to length | * cut crossarms to length | ||
* Change SDI-12 IDs for SR50As | * Change SDI-12 IDs for SR50As | ||
− | + | ||
** Reinforce grounding | ** Reinforce grounding | ||
* SM Grid rewiring? | * SM Grid rewiring? | ||
− | + | * | |
=== Remaining things to grab=== | === Remaining things to grab=== | ||
Line 39: | Line 43: | ||
* Ziplocs | * Ziplocs | ||
* GPS | * GPS | ||
− | |||
− | |||
− | |||
− | |||
==== Technical Gear ==== | ==== Technical Gear ==== | ||
− | * '''Shotgun''' | + | * '''Shotgun''' -- in Barrow already |
* Keypads | * Keypads | ||
* '''fish tape''' | * '''fish tape''' | ||
Line 60: | Line 60: | ||
==== Probable Luggage ==== | ==== Probable Luggage ==== | ||
− | + | # Bob Personal Actionpacker [Bob #1] | |
− | # Bob Personal | + | # Work Actionpacker #1 [Bob #2] |
− | # Work Actionpacker #1 [Bob # | + | |
− | |||
====Rough on-site todo==== | ====Rough on-site todo==== |
Revision as of 12:31, 4 May 2013
Contents
May 2013 Trip
Purpose:
- Rewire Grid Site station with CR1000 & new multiplexers
- Setup MD485s to get Grid online
- reconfigure Site C CR1000 for act as a pakbus router
- Snow Surveys
- Any other prep that's possible for the June trip
- Bring back shotgun
- slather anticorrosion goo on all 12V/G points?
Shipping
- None
To Do as of 4/21/2013
- Modify Programs
- Wiring Diagrams
- PRs for freight
- Sketch up site
- cut crossarms to length
- Change SDI-12 IDs for SR50As
- Reinforce grounding
- SM Grid rewiring?
Remaining things to grab
- ?
To Purchase
- ?
Pre-trip to do
Things to buy
- Bit o' Food?
- ?
Stuff to bring
- Adirondack Tube
- Scale
- Thaw Probe
- Ziplocs
- GPS
Technical Gear
- Shotgun -- in Barrow already
- Keypads
- fish tape
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Serial Cables & spares
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Bob Personal Actionpacker [Bob #1]
- Work Actionpacker #1 [Bob #2]
Rough on-site todo
- Copy wiring of Grid Site
- Transfer wires to new multiplexer & Logger
- Snowsurveys