May 2013 Trip
Purpose:
- Rewire Grid Site station with CR1000 & new multiplexers
- Setup MD485s to get Grid online
- reconfigure Site C CR1000 for act as a pakbus router
- Snow Surveys
- Any other prep that's possible for the June trip
- Bring back shotgun
- slather anticorrosion goo on all 12V/G points?
Shipping
- None
To Do as of 4/21/2013
- Modify Programs
- Wiring Diagrams
- PRs for freight
- Sketch up site
- cut crossarms to length
- Change SDI-12 IDs for SR50As
- Reinforce grounding
- SM Grid rewiring?
Remaining things to grab
- ?
To Purchase
- ?
Pre-trip to do
Things to buy
- Bit o' Food?
- ?
Stuff to bring
- Adirondack Tube
- Scale
- Thaw Probe
- Ziplocs
- GPS
- 4 Precision Resistors for new logger
Technical Gear
- Shotgun -- in Barrow already
- Keypads
- fish tape
- Tool Bags
- Computer & (packed) SC32B
- Climbing harness
- Serial Cables & spares
- Sawzall
- drill
Food to bring out
- Optional
Probable Luggage
- Bob Personal Actionpacker [Bob #1]
- Work Actionpacker #1 [Bob #2]
Rough on-site todo
- Copy wiring of Grid Site
- Transfer wires to new multiplexer & Logger
- Snowsurveys