Difference between revisions of "Jessie Cherry May 2013 Toolik Trip"

From IARC 207 Wiki
Jump to navigation Jump to search
Line 54: Line 54:
 
* Conduit
 
* Conduit
 
* New Program (Bob Bu has draft) - Direct Link emailed 5/4/2013
 
* New Program (Bob Bu has draft) - Direct Link emailed 5/4/2013
 +
** Program Git Archive:
 +
*** [Bob's DropBox]/logger_programs/toolik_tfs/TFScamp_CR3000.CR3
 
* Troubleshoot Evaporation Pan
 
* Troubleshoot Evaporation Pan
 
* Figure out what needs calibration
 
* Figure out what needs calibration

Revision as of 11:41, 4 May 2013

Overview

The met station at Toolik needs to be transferred from its tripod to a tower. The field requirements for this assignment will be outlined here.

Any other information not here but could be anticipated as being useful?

To Bring from Fairbanks

  • Cabling to extend thermocouple temperature profile from old enclosure to new enclosure.
  • shovels for digging out buried cabling
  • extension cord for moving power from old tripod to new tower
  • cable splicing tools for anything that might need extending
    • soldering iron
    • butane
    • propane torch
    • solder
    • heat shrink
  • extra cabling
  • Toolbags
  • Extra data logger (CR1000, for any instruments that aren't transferred to the new logger on this trip and or don't reach... completely just a back up item)
  • small actionpacker
  • sled
  • Climbing harness
  • CGR4 Radiometer
    • Also bring Precision Resistor for measuring CGR4 Thermistor
    • Also need to update program with calibration constants for this sensor.

Current Equipment On-Site

  • New tower w/ enclosure & guy wires
  • Garden web cam
  • Pluvio 1 (Currently installed but broken)
  • Met Station w/ soil thermocouples, radiation, lake sensors on rusted tripod
  • New Multiplexer
  • Pluvio 2 (needs to be installed but is in the environmental data center)... has a different base than the existing one.
  • Pluvio 2 base is inside the wyoming gauge snow fence sitting on the ground

Goals

  • Mount recalibrated AT/RH sensors
  • Move power to the new enclosure
  • Transfer as much equipment as possible to new tower
  • Leave what can't be moved at the old site
  • Install Pluvio 2
    • note, pluvio 1 wire is a bit short. but should be okay with pluvio 2
  • Get evaporation pan working
  • Install new radiometer
  • Tighten guy wires and level tower

Needs

  • TFS Site Wiring / cable lengths
  • List cable types needed ?
  • List muxes needed ?

List equipment/tools need to bring

  • Conduit
  • New Program (Bob Bu has draft) - Direct Link emailed 5/4/2013
    • Program Git Archive:
      • [Bob's DropBox]/logger_programs/toolik_tfs/TFScamp_CR3000.CR3
  • Troubleshoot Evaporation Pan
  • Figure out what needs calibration

Updates

  • Pluvio 1 and Pluvio 2 use different base stands. Make sure to include the Pluvio 2 mounting hardware!
  • Evaporation pan may not be in the budget this year if the gauging unit (Campbell 21531) needs to be replaced.
  • Conduit isn't an immediate priority since this depends on the final setup.