Difference between revisions of "Umiat Crew Trip To Do 2013"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | ===Met Sites and Repeaters=== | ||
+ | ====DUR6 Itmalakpak==== | ||
+ | * Shovel out solar panel. | ||
+ | * Replace barometric pressure if time permits. | ||
+ | * Need a new e-fence charger. | ||
+ | ** The lower line is not working but the top line is working. | ||
+ | |||
+ | ====DUM3 Nanushuk==== | ||
+ | * Stakes needed to pin down efence charger | ||
− | DUM4 Tuluga Met | + | ====DUM4 Tuluga Met ==== |
* Potential bear damage at station. | * Potential bear damage at station. | ||
** Have not heard from station since late September. | ** Have not heard from station since late September. | ||
Line 8: | Line 17: | ||
* Level Precip Bucket | * Level Precip Bucket | ||
− | + | ====DUM5 Encampment Met==== | |
− | * | + | * Bear Fence Needs Repair |
− | + | ====DUM6 White Lake Met==== | |
− | * | + | * Tighten wiring on Air temp backup (GWS style) |
− | + | ====DUM7 Hat Box Mesa==== | |
− | * | + | * Put Conduit over Soil thermistor cable |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | DFM2 White Hills Met | + | ====DFM2 White Hills Met==== |
* Needs major sensor repairs. Most of the sensors are bad. | * Needs major sensor repairs. Most of the sensors are bad. | ||
* Would be good to get rainfall and air temperature but I propose probably not fixing the following broken sensors: | * Would be good to get rainfall and air temperature but I propose probably not fixing the following broken sensors: | ||
Line 32: | Line 33: | ||
** Needs an HMP Air temp sensor or a new backup sensor | ** Needs an HMP Air temp sensor or a new backup sensor | ||
− | DFM4 Northwest Kuparuk Met | + | ====DFM4 Northwest Kuparuk Met==== |
* Check radiation shields, are sensors in the shield? | * Check radiation shields, are sensors in the shield? | ||
* Replace SR50 old style. | * Replace SR50 old style. | ||
* Fence was in very poor shape on last trip to station. | * Fence was in very poor shape on last trip to station. | ||
− | DUS3 Chandler Bluff Met | + | ===Surface Water Stations=== |
+ | |||
+ | ====Lower Itkillik Station==== | ||
+ | * Plant Cam | ||
+ | ** From Toolik? | ||
+ | * Needs freewave radio | ||
+ | * Needs new program loaded into logger for water levels, turbidity, should be identical to Upper Itkillik except for no cameras. | ||
+ | * Station has: | ||
+ | ** HMP, | ||
+ | ** 10KOhm resistor | ||
+ | ** Battery box thermistor. | ||
+ | ** Rig job radio set up: Left pins 2, 3, 5 plugged into Ken's serial connector deal and unplugged 1, 4, 6. Taped back up. | ||
+ | ** Plugged in null modem to logger and unplugged power to logger for winter. | ||
+ | ** Bad radio or bad connection. | ||
+ | |||
+ | ====DUS3 Chandler Bluff Met==== | ||
* Leaning tower due to erosion problems. | * Leaning tower due to erosion problems. | ||
* Measure the leaning SR50 snow depth sensor distance to snow surface and snow depth so we can possibly correct the bad data due to the leaning tower. | * Measure the leaning SR50 snow depth sensor distance to snow surface and snow depth so we can possibly correct the bad data due to the leaning tower. | ||
Line 43: | Line 59: | ||
* Remeasure SR50 distances, etc. | * Remeasure SR50 distances, etc. | ||
− | + | ====Chandler Crossing==== | |
− | * | + | * Install Plant Cam |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | DUS2 Anaktuvuk River | + | ====DUS2 Anaktuvuk River==== |
* Needs new soil thermistor string | * Needs new soil thermistor string | ||
* Needs new Gieck Base and alter shield | * Needs new Gieck Base and alter shield | ||
* Fix Cameras | * Fix Cameras | ||
− | Needed from Toolik | + | ===Needed from Toolik=== |
* Stakes for DUM efence charger | * Stakes for DUM efence charger | ||
* CC640 Power Plugs (6 conductor deals) | * CC640 Power Plugs (6 conductor deals) | ||
* Some Conduit | * Some Conduit | ||
− | Needed from Umiat | + | ===Needed from Umiat=== |
* BLM flight schedule | * BLM flight schedule | ||
+ | * Return Plant Cams to Fairbanks ('''2''' units) |
Revision as of 10:38, 23 May 2013
Contents
Met Sites and Repeaters
DUR6 Itmalakpak
- Shovel out solar panel.
- Replace barometric pressure if time permits.
- Need a new e-fence charger.
- The lower line is not working but the top line is working.
DUM3 Nanushuk
- Stakes needed to pin down efence charger
DUM4 Tuluga Met
- Potential bear damage at station.
- Have not heard from station since late September.
- Need an E-Fence; Also new stand?:
- is sitting on the ground surface next to the southwestern fencepost - to the south of the raingauge, the mount is broken and the solar panel/battery is not working
- New Gieck Base & Alter Shield
- Level Precip Bucket
DUM5 Encampment Met
- Bear Fence Needs Repair
DUM6 White Lake Met
- Tighten wiring on Air temp backup (GWS style)
DUM7 Hat Box Mesa
- Put Conduit over Soil thermistor cable
DFM2 White Hills Met
- Needs major sensor repairs. Most of the sensors are bad.
- Would be good to get rainfall and air temperature but I propose probably not fixing the following broken sensors:
- needs a new anemometer (bad bearings),
- has a bad SR50 snow depth sensor old style
- Needs an HMP Air temp sensor or a new backup sensor
DFM4 Northwest Kuparuk Met
- Check radiation shields, are sensors in the shield?
- Replace SR50 old style.
- Fence was in very poor shape on last trip to station.
Surface Water Stations
Lower Itkillik Station
- Plant Cam
- From Toolik?
- Needs freewave radio
- Needs new program loaded into logger for water levels, turbidity, should be identical to Upper Itkillik except for no cameras.
- Station has:
- HMP,
- 10KOhm resistor
- Battery box thermistor.
- Rig job radio set up: Left pins 2, 3, 5 plugged into Ken's serial connector deal and unplugged 1, 4, 6. Taped back up.
- Plugged in null modem to logger and unplugged power to logger for winter.
- Bad radio or bad connection.
DUS3 Chandler Bluff Met
- Leaning tower due to erosion problems.
- Measure the leaning SR50 snow depth sensor distance to snow surface and snow depth so we can possibly correct the bad data due to the leaning tower.
- Move mast onto new tripod base and patch up station best you can.
- Remeasure SR50 distances, etc.
Chandler Crossing
- Install Plant Cam
DUS2 Anaktuvuk River
- Needs new soil thermistor string
- Needs new Gieck Base and alter shield
- Fix Cameras
Needed from Toolik
- Stakes for DUM efence charger
- CC640 Power Plugs (6 conductor deals)
- Some Conduit
Needed from Umiat
- BLM flight schedule
- Return Plant Cams to Fairbanks (2 units)