Difference between revisions of "Fall 2015 site visit"
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
* emptied pluvio and put ~1L antifreeze in | * emptied pluvio and put ~1L antifreeze in | ||
− | + | done on 8/27 | |
− | * | + | * leveled remaining radiometers |
− | * | + | * winterized evaporation pan |
Next time | Next time | ||
* bring dessicant for radiometers | * bring dessicant for radiometers | ||
* how to clean underwater quantum? | * how to clean underwater quantum? | ||
+ | * note: reference resistor for thermistor probe taped to inside of enclosure |
Latest revision as of 13:41, 1 September 2015
- replace snow Transducers
- replace therm strings (with?)
- antifreeze in pluvio
- replace desiccants
- clear garden cam of images
- bring longer cable housing for evap pan
- bring electrical splitter for wiring all power to data logger
- put nylock nut on wind sensor nose cap
done on 8/23 from ~9pm - 10pm
- replaced snow sensor
- leveled quantum par sensor, kip and zonnen radiometer
- emptied pluvio and put ~1L antifreeze in
done on 8/27
- leveled remaining radiometers
- winterized evaporation pan
Next time
- bring dessicant for radiometers
- how to clean underwater quantum?
- note: reference resistor for thermistor probe taped to inside of enclosure